Drawing for B

USPTO serial 88020540

B

Reviewed by CopyMark Law Group

Reg. 5837661Status 710
Filing date
Status date
Registration date
Aug 20, 2019
Examiner
SMITH, REBECCA A
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with B?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Matthew A. Homyk

MATTHEW A. HOMYK BLANK ROME LLPONE LOGAN SQUAREPHILADELPHIA, PA 19103UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for controlling electricity; Apparatus and instruments for accumulating electricity; Apparatus and instruments for switching electricity; Apparatus and instruments for transforming electricity; Apparatus and instruments for regulating electricity; Apparatus and instruments for conducting electricity; electronic circuit boards; flexible circuit boards; integrated circuit boards; printed circuit boards; testing apparatus for testing printed circuit boards; Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; Electronic components in the nature of capacitors, connectors, filters, oscillators, relays, switches, transformers, resistors, semiconductors, integrated circuits, rectifiers, transistors; Electronic proximity sensors and switches; Photographic apparatus and instruments for use in 3D imagingSECTION 8 - CANCELLED—
040Custom manufacture of camera flashes used in 3D imaging, camera and flash controllers used in 3D imaging, three phase electrical power quality meter used in multiple applications, multi-phase power quality meters used for branch circuit metering, and distributed temperature and humidity measurement systems for use in data centers; custom manufacture of scientific, electrical, optical and photographic products and instruments, namely, camera flashes used in 3D imaging, camera and flash controllers used in 3D imaging, three phase electrical power quality meter used in multiple applications, multi-phase power quality meters used for branch circuit metering, and distributed temperature and humidity measurement systems for use in data centersSECTION 8 - CANCELLED—
042Design and testing of new products for others; electrical engineering services; design of electrical circuit boards; engineering design services; software design servicesSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 6, 2026C8..CANCELLED SEC. 8 (6-YR)—
Aug 20, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 20, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 4, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 4, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 15, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 30, 2019PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 30, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 29, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 29, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 26, 2019ALIEASSIGNED TO LIE—
Apr 20, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 22, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 22, 2018DOCKASSIGNED TO EXAMINER—
Jul 6, 2018MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jul 5, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 3, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance