Drawing for BRUCHA

USPTO serial 88030275

BRUCHA

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
FATHY, DOMINIC
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BRUCHA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Moritz Schumann

MORITZ SCHUMANN SCHUMANN BURGHART LLP1500 BROADWAY, SUITE 1902NEW YORK, NY 10036UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys, in a finished condition, namely, insulated metal panels; building materials of metal, namely, insulated metal panels, bollards, joints, bolts, nails, fascia, barriers, hinges, snap locks; transportable buildings of metal; electric cables and wires of common metal; ironmongery, namely, bolts and nails; small items of metal hardware, namely, bollards, joints, bolts, nails, barriers, hinges, snap locks; pipes and tubes of metal; safes; goods of common metal not included in other classes, namely, bollards, bolts, nails, joints, snap locks; ores of metalACTIVE—
017Rubber, namely, natural rubber; gutta-percha, raw or semi-worked gum, asbestos, mica and goods made from these materials and not included in other classes, namely, asbestos yarn; semi-finished plastic products, namely, flexible tubes; packing and insulating materials; stopping materials, namely, door stops of rubber; flexible pipes, not of metalACTIVE—
019Non-metallic building materials, namely, mineral wool in foam form for use as a building insulator; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildingsACTIVE—
040Treatment of materials in the nature of metal, steel, wood, concrete by means of a continuous process where all the used materials are processed together and the completely formed panel is cut to the desired length without stopping the process as well as by means of a discontinuous process where materials are processed separately by facings that are formed and cut to the desired length and then assembled together in a press where the foam is injectedACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Jun 8, 2020MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jun 8, 2020ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Sep 24, 2019NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 30, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 10, 2019NPUBNOTICE OF PUBLICATION—
Jun 25, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 24, 2019CNEAEXAMINERS AMENDMENT MAILED—
Jun 21, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Jun 21, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
May 14, 2019CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 13, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 22, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 22, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 14, 2019ALIEASSIGNED TO LIE—
Apr 9, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 30, 2018CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 29, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 26, 2018DOCKASSIGNED TO EXAMINER—
Jul 14, 2018MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Jul 13, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 12, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance