Drawing for RHOMBERG SERSA NORTH AMERICA

USPTO serial 88031160

RHOMBERG SERSA NORTH AMERICA

Reviewed by CopyMark Law Group

Reg. 5803573Status 710
Filing date
Status date
Registration date
Jul 16, 2019
Examiner
MANGUBAT, ALEXANDER GEORGE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with RHOMBERG SERSA NORTH AMERICA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Building construction; repair and installation of railway tracks; construction of railways; construction of railway tracks; construction of permanent ways for railways; modernized repair, restoration, maintenance, and renovation in the field of structural railway tracks; maintenance services in the field of railway tracks; installation and replacement services in the field of railway tracks; repair, installation, restoration, maintenance, and servicing of railway tracks and railway platforms; repair, maintenance, and installation advisory and consultancy services in the field of railway tracks; providing information in the field of repair, maintenance, and installation of railway tracks; rental of railway track construction machines and track laying construction machinesSECTION 8 - CANCELLEDDec 31, 2017
042Scientific and technological services, namely, product research and new product design services in the field of railway tracks; industrial analysis and research services in the field of engineering of railway tracks; design and development of computer hardware and software; technical consultation services in the nature of civil engineering in the fields of rail traffic route construction, railway construction, and railway track construction; scientific and technological services, namely, scientific research in the fields of railway construction, rail traffic route construction, and railway track construction; research and testing on civil engineering in the fields of rail traffic route construction, railway construction and railway track construction; engineering consultancy, information and support in the field of civil engineering relating to rail traffic route construction, railway construction, and railway track constructionSECTION 8 - CANCELLEDDec 31, 2017

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 30, 2026C8..CANCELLED SEC. 8 (6-YR)—
Jul 16, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 16, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 30, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 30, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 10, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 23, 2019ALIEASSIGNED TO LIE—
Mar 3, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 22, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 21, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 21, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 31, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 31, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 31, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 29, 2018DOCKASSIGNED TO EXAMINER—
Jul 14, 2018MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Jul 13, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 13, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance