Drawing for UNLOCKING HEAVY OIL WORLDWIDE

USPTO serial 88034957

UNLOCKING HEAVY OIL WORLDWIDE

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
BULLOFF, TOBY ELLEN
Law office
TMO LAW OFFICE 119 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with UNLOCKING HEAVY OIL WORLDWIDE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Katrin Lewertoff

Katrin Lewertoff FERDINAND IP, LLC1221 POST ROAD EASTSUITE 302WESTPORT, CT 06880

Goods and services

ClassDescriptionStatusFirst use
007(Based on Use in Commerce) Machine tools, namely, wire wrap screens for use as sand control devices in pipes in the oil, gas and energy industries; machine tools, namely, steam injection flow control joints for use in streamed distribution applications in the oil, gas and energy industries; machine tools, namely, inflow and outflow control joints for use in the streamed distribution applications in the oil, gas and energy industries; well pumping and drilling machine parts, namely, seamed slotted liner for sand control for use in wells in the oil, gas and energy industries; well pumping and drilling machine parts, namely, seamed slotted liner for sand control in wells manufactured according to specific reservoir sand distribution, to provide self-cleaning anti-plugging slot profiles which prevent pore throat and slot plugging; well pumping and drilling machine parts, namely, seamed slotted liner used in wells in the oil, gas and energy industries to reduce slot plugging by providing anti-plugging mechanics to the surface of a previously slotted pipe; well pumping and drilling machine parts, namely, sand control devices, namely, seamed slotted liners, for use in wells in the oil, gas and energy industries; well pumping and drilling machine parts, namely, high performance slotted liner for sand control for use in wells in the oil, gas and energy industries; well pumping and drilling machine parts, namely, coated high performance slotted liner for sand control for use in the wells in the oil, gas and energy industries; well pumping and drilling machine parts, namely, uncoated slotted liner for use for sand control in wells in the oil, gas and energy industries; well pumping and drilling machine parts, namely, high performance slotted liner in which machining ridges on the walls of the slot are minimized through high speed and low feed rate cutting for sand control for use in the wells in oil, gas and energy industries; well pumping and drilling machine parts, namely, high performance slotted liner coated with a temperature, chemical and abrasion resistant coating resulting in a smooth slot surface and which results in minimized long term plugging as well as abrasion and temperature resistance for sand control; well pumping and drilling machine parts, namely, sand control devices to reduce well plugging for use in wells in the oil, gas and energy industries; well pumping and drilling machine parts, namely, sand control devices to reduce well plugging for thermal well completion in the oil, gas and energy industriesACTIVE—
035(Based on Intent to Use) Retail and online retail store services featuring sand control products and steam control products, all for use in the oil, gas, and energy industries; Wholesale distributorships featuring sand control products and steam control products, all for use in the oil, gas, and energy industriesACTIVE—
037(Based on Use in Commerce) Providing enhanced oil recovery services to third parties in the oil, gas, and energy industries; Providing sand control services to third parties in the oil, gas and energy industries; Providing maintenance and repair services for machinery, rigs, and wells to third parties in the oil, gas, and energy industries; Sand control services for oil and gas wells in the fields of oil, gas, and energy exploration, and production; Sand control services in oil and gas wells for enhanced oil recovery within the oil, gas, and energy industries; Building, construction, and repair services in the oil, gas, and energy industries, namely, the construction, maintenance, and repair of oil and gas wells and water wells; Installation of slotting equipmentACTIVE—
040(Based on Use in Commerce) Providing custom manufacturing and machining services to third parties in the oil, gas, and energy industries; Providing custom production and manufacturing of specialized tools to third parties in the oil, gas, and energy industries; Custom manufacture and design of slotted liners to the order and specification of others; Manufacture of custom built tools for horizontal drilling to the order and specification of others; Manufacture of custom horizontal completion tools; Custom manufacture of slotting equipment for the oil, gas, and energy industryACTIVE—
042(Based on Use in Commerce) Engineering services in the oil, gas, and energy industries; engineering design; mechanical engineering services; engineering consulting services provided to others in the oil, gas, and energy industries; providing technical research services to others in the fields of oil, gas and energy industries; development of new technology, products, and processes primarily for use oil and gas drilling, well construction, and sand control; research and development of new technology, products, and processes for others; preparation of engineering reports and design drawings; development of new technology, products, and processes in the oil, gas, and energy industries, and consultation related thereto; providing engineering consulting services in the sand control industry; engineering consulting in the field of well bore sand control; providing slot width modeling and testing services in the sand control industry; providing flow control testing services in the sand control industry; providing slot density testing and calculations in the sand control industry; engineering, consulting, and testing services in the oil, gas, and energy industries; providing testing and analysis services with respect to finite elements and laser particle size; research and development services in the oil, gas, and energy industries; testing analysis and evaluation of tools and processes used in the oil, gas, and energy industries; providing sand control design and review services, namely, modeling of particle size distribution and flow testing services; providing sand control and core flow testing services in the oil, gas, and energy industries; providing thermal technical design and review services, namely, using simulation tools and models to analyze steam distribution; preparing and providing reports and recommendations for slot specifications required for effective sand control in the oil, gas, and energy industries; developing slot width models in the oil, gas, and energy industries; development of engineering models and programs designed to achieve optimal slot configuration and optimal steam distribution profiling in oil, gas, and energy industries; design of slotted liners, custom built tools for horizontal drilling, horizontal completion tools and slotting equipment for use in the oil, gas, and energy industriesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Jun 18, 2021MAB2ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jun 18, 2021ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Dec 4, 2020GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Dec 4, 2020GNSIINQUIRY TO SUSPENSION E-MAILED—
Dec 4, 2020CNSISUSPENSION INQUIRY WRITTEN—
Dec 2, 2020RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
May 29, 2020GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
May 29, 2020GNSLLETTER OF SUSPENSION E-MAILED—
May 29, 2020CNSLSUSPENSION LETTER WRITTEN—
May 29, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 29, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 29, 2020ALIEASSIGNED TO LIE—
May 21, 2020ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Dec 16, 2019GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Dec 16, 2019GNSIINQUIRY TO SUSPENSION E-MAILED—
Dec 16, 2019CNSISUSPENSION INQUIRY WRITTEN—
Dec 6, 2019RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
May 14, 2019GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
May 14, 2019GNSLLETTER OF SUSPENSION E-MAILED—
May 14, 2019CNSLSUSPENSION LETTER WRITTEN—
May 14, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 14, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 8, 2019ALIEASSIGNED TO LIE—
May 2, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 6, 2018GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Nov 6, 2018GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Nov 6, 2018CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Oct 31, 2018DOCKASSIGNED TO EXAMINER—
Jul 16, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 16, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance