USPTO serial 88080972
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Naresh Kilaru
Naresh Kilaru Finnegan Henderson Farabow Garrett & Dunner LLP901 New York Avenue NWWashington, DC 20001UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Motors and engines not for land vehicles, namely, boat motors; a full line of machines, machine tools and attachments thereof, motors, engines and generators not for land vehicles, machine coupling and transmission components not for land vehicles for use in agriculture, compaction, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine, material handling, material scrapping, mining, mulching, oil and gas distribution, exploration and production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, waste management, air and space, quarry, aggregate and cement, vegetation management, transportation, and government and defense, namely, asphalt pavers, backhoe loaders, cold planers, compactors, compact track and multi terrain loaders, dozers, draglines, drills, electric rope shovels, excavators, forest machines, hydraulic mining shovels, material handlers, motor graders, pipelayers, road reclaimers, site prep tractors, skidders, skid steer loaders, telehandlers, track loaders, underground hard rock mining machines, underground longwall mining machines, underground room and pillar mining systems, wheel dozers, wheel excavators, wheel loaders, wheel tractor scrapers, log loaders; electricity generators; machines, machine tools and attachments thereof, motors, engines and generators not for land vehicles, machine coupling and transmission components not for land vehicles, namely, articulated trucks in the nature of dump trucks and articulated truck bare chassis, asphalt paving machines, backhoe loaders, cold planers, waste compactors, compact track and multi terrain front end loaders, bulldozers, dragline excavators, drilling machines, electric rope shovels, excavators, forest machines in the nature of timber harvesting machinery, and excavators used for forestry applications, hydraulic mining shovels, material handlers in the nature of trucks configured to allow specific attachments, motor graders, pipelayers, road reclaimers, site prep tractors, skidders in the nature of skid steer loaders, surface mining conveyors being machines, telehandlers, crawler-track loaders, underground hard rock mining machines in the nature of rock flow conveyer systems, underground mining load-haul-dump loaders, underground mining trucks, rock straight conveyor system, longwall mining machines in the nature of armored face material conveyors, plows, roof supports, shearers, room and pillar mining systems consisting of shearers, plow systems, roof supports, conveyor systems, drive systems, and roof support carriers, wheel bulldozers, wheel excavators, wheel loaders, wheel tractor scrapers, log loaders, marine engines, industrial engines, diesel engines for machines; electric, industrial, diesel, gas and natural gas generators and gensets; attachments, namely, augers, brooms, brushcutters, cold planers, flail mowers, grapples, hammers, mulchers, multi-processors, pulverizers, rakes, saws, shears, silage defacers, snow blowers, snow pushes, stump grinders, tillers, all of the foregoing for earth moving, earth conditioning and material handling machines; a full line of machine parts for use in compaction, compressing gas, demolition, earth conditioning, earth contouring, earth moving, forestry, namely, cutting and clearing trees and brush, compaction, demolition, earth conditioning, earth contouring, earth moving, landscaping, lawn care, lifting, marine propulsion, material handling, mining, mulching, paving, pipelaying, powering oil and gas drilling operations, producing power from engines and generators, pumping oil, waste management, air and space, and vegetation management, namely, filters for use in machines for the forementioned; motors and engines except for land vehicles; agricultural implements other than hand-operated, namely, mulchers, rakes, tillers, for use in agriculture, compaction, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine propulsion, material handling, mining, mulching, oil and gas distribution, oil and gas exploration, oil and gas production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, tunnel boring, and vegetation management; oil filters; water separators for use in engines; electric, diesel, and gas generators; current generators | ACTIVE | — |
| 012 | Vehicles and apparatus for locomotion by land, air or water for use in agriculture, compaction, construction, demolition, earth conditioning, earth contouring, earth moving, forestry, landscaping, lifting, marine, material handling, material scrapping, mining, mulching, oil and gas distribution, exploration and production, paving, pipelaying, power generation, road building and repair, site preparation and remediation, waste management, air and space, quarry, aggregate and cement, vegetation management, transportation, and government and defense, namely, trucks, off-highway trucks, articulated trucks, underground mining trucks, internal combustion fork-lift trucks, electric fork-lift trucks, site prep tractors; vehicles and apparatus for locomotion by land, air or water, namely, trucks, off-highway trucks, articulated trucks, underground mining trucks, internal combustion fork-lift trucks, electric fork-lift trucks, electric pallet movers in the nature of forklift trucks, manual pallet movers in the nature of hand trucks; engines for land vehicles; diesel engines for land vehicles | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 7, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 7, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 6, 2022 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| May 5, 2022 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| May 5, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| May 4, 2022 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| May 4, 2022 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Apr 29, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 25, 2022 | INCE | ITU OFFICE ACTION ISSUED FOR EXTENSION REQUEST | — |
| Apr 8, 2022 | IUAF | USE AMENDMENT FILED | — |
| Apr 8, 2022 | EXT5 | SOU EXTENSION 5 FILED | — |
| Apr 8, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 8, 2022 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jan 27, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 27, 2022 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Jan 27, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 27, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 14, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 10, 2021 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Sep 10, 2021 | EXT4 | SOU EXTENSION 4 FILED | — |
| Sep 10, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 19, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 17, 2021 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Mar 17, 2021 | EXT3 | SOU EXTENSION 3 FILED | — |
| Mar 17, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 10, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 8, 2020 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Oct 8, 2020 | EXT2 | SOU EXTENSION 2 FILED | — |
| Oct 8, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 12, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 11, 2020 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 11, 2020 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| May 29, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 8, 2020 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 8, 2019 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 13, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 13, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 24, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 8, 2019 | ALIE | ASSIGNED TO LIE | — |
| Jun 26, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 6, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 6, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 6, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 6, 2018 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Dec 6, 2018 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Dec 6, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 6, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 6, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 3, 2018 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 28, 2018 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Aug 25, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 20, 2018 | NWAP | NEW APPLICATION ENTERED | — |