Drawing for MM100

USPTO serial 88103322

MM100

Reviewed by CopyMark Law Group

Reg. 5818146Status 710
Filing date
Status date
Registration date
Jul 30, 2019
Examiner
PAQUIN, SAMUEL ROBERT
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with MM100?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Masts and towers of metal for wind power plants; building materials of metal for the construction of foundations for machines for wind power plants, namely, foundation plates, foundation flanges, foundation mounting material, metal reinforcement materials for buildingSECTION 8 - CANCELLED
007Wind-powered machines and apparatus for energy production, namely, wind turbines, wind powered electricity generators and wind-powered machines for generating electrical and mechanical energy, parts and accessories for such wind-powered machines, namely, rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generators and emergency power suppliesSECTION 8 - CANCELLED
009Switch cabinets for recording, processing, storage and transmission of data from wind power plants and wind farms; switch cabinets for controlling actuator systems for wind power plants and wind farms and for regulating electrical current, power, and voltage; electrical and electronic regulating, supervisory checking, control and monitoring apparatus and instruments, namely, meters and sensors for measuring turbine performance and power generation in wind power plants and wind farms; data processing equipment, computers and computer software for recording, analyzing, sorting, summarizing, calculating, disseminating and storing data from wind power plants and wind farms; computer interfaces and computer interface programs for monitoring and regulating wind power plants and wind farms; voltage surge protectors; vibration sensors; watt-hour meters; inverters; electric transformers; all afore-mentioned goods for use with wind power plants and wind farmsSECTION 8 - CANCELLED
035Professional business consultation services for wind power plants and wind farmsSECTION 8 - CANCELLED
037Building construction in the field of wind power plants; installation, maintenance and repair of towers, turbines, electrical and computer monitoring and operation systems for wind power plants and farms; repair, maintenance and rebuilding of wind turbines, wind powered electricity generators and wind-powered machines that have been worn or partially destroyed; construction of rotor blades; remote maintenance of wind power plants and wind farms by computerized retrieval of data over the Internet; technical consultation, technical planning and development services as well as technical project management in the construction and maintenance of wind power plant projectsSECTION 8 - CANCELLED
038Telecommunications services, namely, electronic data transmission for wind power plants and wind farmsSECTION 8 - CANCELLED
042Remote monitoring the functioning and use of wind power plants and wind farms by computerized retrieval of data over the Internet; conducting technical measurement evaluations and inspections of wind power plants and wind farms; electronic data storage; design and development of computer software in the field of wind power plants and wind farms; engineering services for calculation, dimensioning and design of rotor blades; technical research in the field of wind power plants and wind farms; technical condition monitoring of rotor blades to ensure proper functioningSECTION 8 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 13, 2026C8..CANCELLED SEC. 8 (6-YR)
Jul 30, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
Jul 30, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 14, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
May 14, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 24, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Apr 10, 2019PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Apr 10, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Mar 23, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Mar 22, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 22, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 15, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 15, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 15, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 15, 2018DOCKASSIGNED TO EXAMINER
Oct 2, 2018AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
Sep 30, 2018ALIEASSIGNED TO LIE
Sep 20, 2018PARITEAS VOLUNTARY AMENDMENT RECEIVED
Sep 11, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Sep 7, 2018NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance