USPTO serial 88135776
TYTRO
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- ALLEN, BIANCA LEIGH
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with TYTRO?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Allison Z. Gifford
Allison Z. Gifford Stradley Ronon Stevens & Young, LLP30 Valley Stream ParkwayMalvern, PA 19335UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Waterproofing membranes in liquid chemical form for use in construction; waterproofing materials for use in building, civil engineering, or in tunnels or other underground structures, namely, waterproofing coatings; fireproofing preparations for application to buildings, civil engineering structures, tunnels or other underground construction | ACTIVE | — |
| 017 | Weatherproofing materials for use in building or civil engineering, or in tunnels or other underground structures, namely, nonmetal weatherproof insulating tape for tunnels; plastic sheet material for use in building, civil engineering, construction, tunnels or other underground construction, namely, sheets of plastic fabric used as a water infiltration barrier in building construction; single ply vapor barriers; molded plastic sheet material for drainage use in building, civil engineering, tunnels or other underground construction, namely, sheets of plastic fabric used as a water infiltration barrier in building construction; water stops, namely, elastomeric expansion and contraction joint seals for use in building; non-metallic materials for filling and plugging joints or openings in buildings, civil engineering structures, tunnels or other underground structures, namely, filling polymer in the nature of polymer-based sealing compounds for concrete, cement grout sealants, and injected resins in the nature of resin-based sealants for use on walls and tunnel surfaces | ACTIVE | — |
| 019 | Non-metallic building materials, namely, cementitious spray applied fire protection; cementitious fireproofing materials in the nature of fireproof cement coatings for application to tunnels or other underground structures, concrete surfaces, and other construction materials; waterproofing membranes for floors and walls; weatherproofing materials for use in building or civil engineering, or in tunnels or other underground structures, namely, non-metal rollable sheet-form waterproof membranes for floors, ceiling, and walls and non-metal water-resistant rollable drainage panels for construction; non-metallic materials for filling and plugging joints or openings in buildings, civil engineering structures, tunnels or other underground structures, namely, cement grouts | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by GCP Applied Technologies Inc.
- Other trademarks owned by GCP Applied Technologies Inc.
- Other trademarks in Class 001
- Other trademarks in Class 017
- Other trademarks in Class 019
- Similar marks named TYTRO
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 19, 2022 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Sep 19, 2022 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| May 12, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| May 11, 2022 | EX5G | SOU EXTENSION 5 GRANTED | — |
| May 9, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 8, 2022 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Apr 7, 2022 | TPEX | SOU EXTENSION RECEIVED WITH TEAS PETITION | — |
| Apr 7, 2022 | PETG | PETITION TO REVIVE-GRANTED | — |
| Apr 7, 2022 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Mar 31, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 31, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 31, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 31, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 31, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 21, 2022 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 21, 2022 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Feb 14, 2022 | EXT5 | SOU EXTENSION 5 FILED | — |
| Jul 15, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 13, 2021 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jul 13, 2021 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jul 13, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 18, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 16, 2021 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 16, 2021 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 16, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 22, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 20, 2020 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jul 20, 2020 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jul 20, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 15, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 13, 2020 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jan 13, 2020 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jan 13, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 13, 2019 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 18, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 18, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 29, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 15, 2019 | ALIE | ASSIGNED TO LIE | — |
| Apr 30, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 30, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 30, 2019 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 30, 2019 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 30, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 12, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 12, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 12, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 18, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 18, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 18, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 27, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 26, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 26, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 17, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 17, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 17, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 10, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 6, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 2, 2018 | NWAP | NEW APPLICATION ENTERED | — |