USPTO serial 88144816
SMCO MOTORS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 31, 2020
- Examiner
- BELL, MARLENE D
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with SMCO MOTORS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Missouri City, TX, US
Missouri City, TX, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Gene Pierson
GENE PIERSON PIERSON IP, PLLC7000 N. MOPAC EXPRESSWAY,SECOND FLOORAUSTIN, TX 78731Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Downhole and surface production equipment for use in oilfield and fluid transference applications, namely, electric submersible pumping systems comprised of pumps, electric motors, gas separators, san separators, gauges, variable speed drives, switchboards and cables, sold as integral components of finished machines; well production equipment, namely, wellheads, junction boxes and transformers, all being parts of machines; Pumps for surface pumping applications in onshore and offshore oil and gas fields, namely, pumps for disposal, injection, or treatment of fluids in or from oil and gas wells, all being parts of machines; and pumps for use in industrial operations, namely, pumps for fluid transfer between equipment in industrial facilities comprised of surface pump(s) and electric motor all being parts of machines; downhole production equipment for use in oilfield production, namely, progressive cavity pumping systems, comprised of surface pump drive and downhole pump, all being parts of machines; downhole production equipment for use in oilfield production, namely, beam pumping systems, all being parts of machines; Oil field equipment, namely, drilling rig mechanization machines and devices, gas tolerant pumps, sand and solid separating devices, down hole motors, artificial lift equipment, down hole equipment and surface systems, all being parts of machines; Mechanical and hydraulic lifts; Oil and gas well completion and production equipment, namely, pumps and surface drives, all being parts of machines; Permanent magnet motors, sold as integral components of finished machines | SECTION 8 - CANCELLED | Jan 16, 2020 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 19, 2026 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Mar 31, 2025 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 31, 2020 | R.SR | REGISTERED-SUPPLEMENTAL REGISTER | Your mark is registered on the Supplemental Register, which is available for marks that are not yet distinctive enough for the Principal Register but can still identify a source. Protection is more limited than Principal Register registration but can later support a Principal Register application. |
| Feb 24, 2020 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 15, 2020 | CNTA | APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER | — |
| Feb 11, 2020 | AAUA | NOTICE OF ACCEPTANCE OF AMENDMENT TO ALLEGE USE E-MAILED | — |
| Feb 10, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 10, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 10, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 10, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 10, 2020 | IUAA | USE AMENDMENT ACCEPTED | — |
| Jan 17, 2020 | AUPC | AMENDMENT TO USE PROCESSING COMPLETE | — |
| Jan 17, 2020 | IUAF | USE AMENDMENT FILED | — |
| Jan 16, 2020 | EAAU | TEAS AMENDMENT OF USE RECEIVED | — |
| Aug 5, 2019 | CEPE | COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED | — |
| Aug 3, 2019 | GEAN | NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Aug 3, 2019 | GEAP | EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Aug 3, 2019 | CPEA | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED | — |
| Jul 25, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 25, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 25, 2019 | ALIE | ASSIGNED TO LIE | — |
| Jul 21, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 23, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 23, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 23, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 16, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 16, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 9, 2018 | NWAP | NEW APPLICATION ENTERED | — |