Drawing for ENCOMPASS

USPTO serial 88171207

ENCOMPASS

Reviewed by CopyMark Law Group

Reg. 6624603Status 700Renewal
Filing date
Status date
Registration date
Jan 25, 2022
Examiner
NASSERGHODSI, SAHAR
Law office
TMO LAW OFFICE 115

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ENCOMPASS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*

Plus Government fees of $975

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Courtney Jackson

COURTNEY JACKSON ARMSTRONG TEASDALE LLP7700 FORSYTH BLVD., SUITE 1800ST. LOUIS, MO 63105UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
036Land acquisition services; project management services for others, namely, financial management of land acquisition projectsACTIVEApr 16, 2012
037Pipeline maintenance and construction; pipeline installation and repair; construction, installation, repair, and maintenance of geothermal energy based power plants; building construction; building construction services; construction project management services; construction project management services in the fields of construction of oil and gas facilities, renewable energy and energy generation equipment support structures, and ancillary structures for supporting meteorological data gathering equipment; construction consulting services in the field of oil and gas facility construction and wind energy facility construction, oil pipeline construction, pipeline construction and maintenance, and plant construction; plant maintenance and construction project management services for businesses in the energy production and transmission sectorACTIVEApr 16, 2012
042Engineering services, namely, design for others in the field of energy and power production and transmission, renewable energy, telecommunication, oil, liquids, and natural gas, and city and municipal utilities; engineering services, namely, design for others in the field of engineering, technical writing for others, and industrial design for others; consulting services in the field of engineering relating to energy and power production and transmission, renewable energy, telecommunication technology, oil, liquids, and natural gas, and city and municipal utilities; surveying services, namely, cadastral land surveying and control surveying, topographic surveying, route engineering surveying, and construction surveying, three-dimensional image surveying, land boundary surveying, rights-of-way and easement surveys in the nature of land surveying, right of entry being land surveying, right of way being land surveying, global positioning surveying, as-built surveys being design surveying, construction staking surveying, and permit drawing services being drafting of plans and engineering drawings for others; engineering services, namely, civil engineering services, infrastructure engineering services, structural engineering services, environmental engineering services, and consultation in connection therewith; mapping services; marine, aerial, and land surveyingACTIVEApr 16, 2012

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 19, 2023ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jan 25, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 9, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 9, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 20, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 1, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 16, 2021XAECEXAMINER'S AMENDMENT ENTERED—
Sep 16, 2021GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 16, 2021GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 16, 2021CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 15, 2021RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Feb 15, 2021RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jan 13, 2021ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Aug 13, 2020RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Feb 13, 2020RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Aug 13, 2019GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Aug 13, 2019GNSLLETTER OF SUSPENSION E-MAILED—
Aug 13, 2019CNSLSUSPENSION LETTER WRITTEN—
Aug 1, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 31, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 31, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 5, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 5, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 5, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 4, 2019DOCKASSIGNED TO EXAMINER—
Nov 10, 2018MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Nov 9, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 30, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance