USPTO serial 88175765
Reviewed by CopyMark Law Group
Status 701 means the registration is active and the first Section 8 declaration of continued use was accepted. The next major deadline is the combined Section 8 and Section 9 filing at the 10-year anniversary. Calendar the 10-year Section 8 and 9 combined renewal.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
KNOXVILLE, TN, US
Goose Creek, SC, US
Tampa, FL, US
Tampa, FL, US
MONCKS CORNER, SC, US
Tampa, FL, US
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
PETER BREWER
PETER BREWER THRIVE IP8903 Linksvue DriveGettysvue CenterKNOXVILLE, TN 37922-5254| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Bath installations; [ Bath screens; Bath tub jets; Bath tubs; ] [ Baths, bathtubs, ] [ whirlpool baths ] [ and bath installations; ] [ Bathtub enclosures;] * Bathtubs and bathtub enclosures; * [ Bathtubs; Bidets; ] [ Drinking fountains; ] [ Faucet handles; Faucet sprayers; Faucets; Kitchen sink sprayers; Kitchen sinks; ] Lavatories; Lavatory bowls; Lavatory seats; Plumbing fittings, namely, shower control valves; Plumbing fittings, namely, tub control valves; Plumbing fittings, namely, valves; Plumbing fixtures, namely, shower mixers; Plumbing fixtures, namely, shower sprayers; [ Plumbing fixtures, namely, sink sprayers; Plumbing fixtures, namely, sink traps; ] Shower and bath cubicles; Shower enclosures; Shower heads; Showers; [ Sinks; Urinals being sanitary fixtures; Water closets; ] Automatic flush valves for toilets; Cocks for pipes and pipelines being parts of sanitary installations; [ Faucets for pipes and pipelines being parts of sanitary installations; ] Flexible pipes being parts of basin plumbing installations; [ Flexible pipes being parts of bath plumbing installations; Flexible pipes being parts of shower plumbing installations; Flexible pipes being parts of sink plumbing installations; ] [ Hand held shower heads; ] [ Jet nozzles for bathtubs; ] Plumbing fittings, namely, drains; [ Plumbing fittings, namely, sink strainers; Single lever fixtures for lavatories and sinks; ] Spigots for pipes and pipelines being parts of sanitary installations [ ; Strainers for plumbing drains; ] [ Water faucet spout; Water jets for use in bathtubs ] | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 18, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 18, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 18, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 10, 2026 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Mar 11, 2026 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Mar 11, 2026 | 8.OK | REGISTERED - SEC. 8 (6-YR) ACCEPTED | The USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline. |
| Mar 9, 2026 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Mar 9, 2026 | PRA8 | POST REGISTRATION ACTION MAILED - SEC. 8 | — |
| Feb 23, 2026 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Feb 23, 2026 | PRA8 | POST REGISTRATION ACTION MAILED - SEC. 8 | — |
| Feb 9, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 26, 2025 | ES8R | TEAS SECTION 8 RECEIVED | — |
| Sep 26, 2025 | ES8R | TEAS SECTION 8 RECEIVED | — |
| Oct 1, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 28, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 28, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Dec 28, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Dec 26, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 26, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 26, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 26, 2023 | NURC | NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED | — |
| Nov 18, 2023 | C.7C | NEW CERTIFICATE UNDER SECTION 7 - PROCESSED | — |
| Nov 16, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 29, 2023 | ES7R | TEAS SECTION 7 REQUEST RECEIVED | — |
| Oct 18, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 18, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 18, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 18, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 18, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Sep 22, 2021 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Sep 8, 2021 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Oct 1, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 24, 2019 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Aug 23, 2019 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Aug 22, 2019 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Aug 22, 2019 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 25, 2019 | IUAF | USE AMENDMENT FILED | — |
| Jul 25, 2019 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| May 21, 2019 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 26, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 26, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 6, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 14, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 7, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 20, 2018 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Nov 20, 2018 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Nov 15, 2018 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 3, 2018 | NWAP | NEW APPLICATION ENTERED | — |