Drawing for W

USPTO serial 88214030

W

Reviewed by CopyMark Law Group

Reg. 6804442Status 700Registered
Filing date
Status date
Registration date
Jul 26, 2022
Examiner
DUBRAY, KATHERINE M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with W?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Keith Toms, Esq.

Keith Toms, Esq. MCCARTER & ENGLISH, LLP265 FRANKLIN STREETBOSTON, MA 02110UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
019Erosion control fabrics, mats, agricultural nets, geotextiles, not of metal; geotextiles for the purposes of erosion control, drainage, stabilizing inclines, stabilizing shore lines, recultivation, plant support, plant growth, absorption, stabilization and reinforcement of the soil; erosion control fencing; non-metal fence stays; sand bagsACTIVEMay 17, 2022
022Horticultural bags and sacks, namely, bags and sacks made of woven natural fibers, namely, coconut, jute, burlap, for use in growing any type of plant or shrub; rolls and agricultural nets made of geotextiles for the purposes of erosion control, drainage, stabilizing shore lines, plant support, plant growth, stabilization and reinforcement of the soilACTIVEMay 17, 2022
031Pre-vegetated rolls made of woven natural fibers for growing native plants and shrubsACTIVEMay 17, 2022
037Soil erosion control services; shoreline restoration services; construction, installation and repair of fiber roll arrays and other arrays for coastal stabilization, soil erosion control and plant vegetationACTIVEJan 2, 2017
042Engineering, design, development, and consulting services related thereto in the field of landscape architecture, restoration of coastal vegetation, coastal soil stabilization and erosion control; technical consultation in the field of environmental science and environmental engineering; conducting feasibility studies in the field of environmental engineering; engineering services in the field of environmental compliance; environmental engineering testing and inspection servicesACTIVEJan 2, 2017

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 26, 2022NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 26, 2022R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 22, 2022SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jun 21, 2022CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jun 2, 2022SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jun 1, 2022AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
May 17, 2022IUAFUSE AMENDMENT FILED—
May 17, 2022EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Dec 18, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 16, 2021EX4GSOU EXTENSION 4 GRANTED—
Dec 16, 2021EXT4SOU EXTENSION 4 FILED—
Dec 16, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 18, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 16, 2021EX3GSOU EXTENSION 3 GRANTED—
Jun 16, 2021EXT3SOU EXTENSION 3 FILED—
Jun 16, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 18, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 16, 2020EX2GSOU EXTENSION 2 GRANTED—
Dec 16, 2020EXT2SOU EXTENSION 2 FILED—
Dec 16, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 19, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 17, 2020EX1GSOU EXTENSION 1 GRANTED—
Jun 17, 2020EXT1SOU EXTENSION 1 FILED—
Jun 17, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 17, 2019NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Oct 22, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 22, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 2, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 18, 2019ALIEASSIGNED TO LIE—
Sep 16, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 6, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 6, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 6, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 9, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 9, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 9, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 2, 2019DOCKASSIGNED TO EXAMINER—
Dec 20, 2018MDSMNOTICE OF DESIGN SEARCH CODE E-MAILED—
Dec 19, 2018NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 6, 2018NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance