USPTO serial 88237241
LAVLE
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- EDWARDS, ALICIA COLLINS
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with LAVLE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Pam Kohli Jacobson
Pam Kohli Jacobson K&L Gate LLP925 4th Ave., Ste 2900Seattle, WA 98104UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electric batteries for vehicles, namely, ships, vessels and boats; electric battery system and equipment comprised of lithium-based energy storage system (ESS) comprising of lithium-ion batteries, battery chargers, charge controllers and inverters, battery cables, as well as heating and cooling units, conductive fibers for conducting electrical charges and static electrical charges, and heat transfer components in the nature of fluids, graphite, plastics, aluminum, fiberglass, glass filled thermoplastics and glass filled epoxies for thermal management, electrical and wiring systems comprising of cables, wiring, circuit boards, sensors and bus bars, and control systems comprising of controllers, software, algorithms and power devices used in managing battery voltage and battery charging, computer hardware and computer software for storage and supply of electricity to ships, vessels, and boats; rechargeable batteries, electric accumulators and power supplies for ships, vessels and boats; electric batteries for use in the defense, marine, maritime, and energy industries; electric batteries for use in onshore and offshore oil and gas production; electric batteries for use with tidal power generators and wave buoy power generators; electric battery system and equipment comprised of lithium-based energy storage system (ESS) comprising of lithium-ion batteries, battery chargers, charge controllers and inverters, battery cables, as well as heating and cooling units, conductive fibers for conducting electrical charges and static electrical charges, and heat transfer components in the nature of fluids, graphite, plastics, aluminum, fiberglass, glass filled thermoplastics and glass filled epoxies for thermal management, electrical and wiring systems comprising of cables, wiring, circuit boards, sensors and bus bars, and control systems, comprising of controllers, software, algorithms and power devices used in managing battery voltage and battery charging, computer hardware and computer software for storage and supply of electricity in the defense, marine, maritime, and energy industries; electric battery system and equipment comprised of lithium-based energy storage system (ESS) comprising of lithium-ion batteries, battery chargers, charge controllers and inverters, battery cables, as well as heating and cooling units, conductive fibers for conducting electrical charges and static electrical charges, and heat transfer components in the nature of fluids, graphite, plastics, aluminum, fiberglass, glass filled thermoplastics and glass filled epoxies for thermal management, electrical and wiring systems comprising of cables, wiring, circuit boards, sensors and bus bars, and control systems, comprising of controllers, software, algorithms and power devices used in managing battery voltage and battery charging, computer hardware and computer software for storage and supply of electricity in onshore and offshore oil and gas production; electric battery system and equipment comprised of lithium-based energy storage system (ESS) comprising of lithium-ion batteries, battery chargers, charge controllers and inverters, battery cables, as well as heating and cooling units, conductive fibers for conducting electrical charges and static electrical charges, and heat transfer components in the nature of fluids, graphite, plastics, aluminum, fiberglass, glass filled thermoplastics and glass filled epoxies for thermal management, electrical and wiring systems comprising of cables, wiring, circuit boards, sensors and bus bars, and control systems comprising of controllers, software, algorithms and power devices used in managing battery voltage and battery charging, computer hardware and computer software for storage and supply of electricity in tidal power generators and wave buoy power generators; rechargeable batteries, electric accumulators and power supplies for use in the defense, marine, maritime, and energy industries; rechargeable batteries, electric accumulators and power supplies for use in onshore and offshore oil and gas production; rechargeable batteries, electric accumulators and power supplies for use with tidal power generators and wave buoy power generators; energy storage systems comprised of lithium-based energy storage system (ESS) comprising of lithium-ion batteries, battery chargers, charge controllers and inverters, battery cables, as well as heating and cooling units, conductive fibers for conducting electrical charges and static electrical charges, and heat transfer components in the nature of fluids, graphite, plastics, aluminum, fiberglass, glass filled thermoplastics and glass filled epoxies for thermal management, electrical and wiring systems comprising of cables, wiring, circuit boards, sensors and bus bars, and control systems comprising of controllers, software, algorithms and power devices used in managing battery voltage and battery charging, computer hardware and computer software for vehicles, namely, ships, vessels and boats; energy storage systems comprised of lithium-based energy storage system (ESS) comprising of lithium-ion batteries, battery chargers, charge controllers and inverters, battery cables, as well as heating and cooling units, conductive fibers for conducting electrical charges and static electrical charges, and heat transfer components in the nature of fluids, graphite, plastics, aluminum, fiberglass, glass filled thermoplastics and glass filled epoxies for thermal management, electrical and wiring systems comprising of cables, wiring, circuit boards, sensors and bus bars, and control systems comprising of controllers, software, algorithms and power devices used in managing battery voltage and battery charging, computer hardware and computer software for use in the defense, marine, maritime, and energy industries; energy storage systems comprised of lithium-based energy storage system (ESS) comprising of lithium-ion batteries, battery chargers, charge controllers and inverters, battery cables, as well as heating and cooling units, conductive fibers for conducting electrical charges and static electrical charges, and heat transfer components in the nature of fluids, graphite, plastics, aluminum, fiberglass, glass filled thermoplastics and glass filled epoxies for thermal management, electrical and wiring systems comprising of cables, wiring, circuit boards, sensors and bus bars, and control systems comprising of controllers, software, algorithms and power devices used in managing battery voltage and battery charging, computer hardware and computer software for use in onshore and offshore oil and gas production; energy storage systems comprised of lithium-based energy storage system (ESS) comprising of lithium-ion batteries, battery chargers, charge controllers and inverters, battery cables, as well as heating and cooling units, conductive fibers for conducting electrical charges and static electrical charges, and heat transfer components in the nature of fluids, graphite, plastics, aluminum, fiberglass, glass filled thermoplastics and glass filled epoxies for thermal management, electrical and wiring systems comprising of cables, wiring, circuit boards, sensors and bus bars, and control systems, comprising of controllers, software, algorithms and power devices used in managing battery voltage and battery charging, computer hardware and computer software for use with tidal power generators and wave buoy power generators; electrical storage batteries and battery modules; battery chargers | ACTIVE | — |
| 037 | Installation, maintenance, integration, and repair of electric battery systems for ships, vessels, and boats; installation, maintenance, integration, and repair of electric battery systems, all relating to defense, marine, maritime, and energy industries; installation, maintenance, integration, and repair of electric battery systems related to onshore and offshore oil and gas production; installation, maintenance, integration, and repair of electric battery systems for tidal power generators and wave buoy power generators | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 19, 2021 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jul 19, 2021 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Sep 12, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 10, 2020 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Sep 10, 2020 | EXT1 | SOU EXTENSION 1 FILED | — |
| Sep 10, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 16, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Apr 21, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 21, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 1, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 17, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 17, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 15, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 15, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 15, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 6, 2020 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 6, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 6, 2020 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 6, 2020 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 6, 2020 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 5, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 5, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 5, 2020 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Feb 19, 2020 | GNS1 | NOTIFICATION OF SUBSEQUENT FINAL EMAILED | — |
| Feb 19, 2020 | GNCF | CONTINUATION OF FINAL REFUSAL E-MAILED | — |
| Feb 19, 2020 | CNCF | ACTION CONTINUING A FINAL - COMPLETED | — |
| Jan 18, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 17, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 17, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 17, 2020 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 2, 2020 | GNS1 | NOTIFICATION OF SUBSEQUENT FINAL EMAILED | — |
| Jan 2, 2020 | GNCF | CONTINUATION OF FINAL REFUSAL E-MAILED | — |
| Jan 2, 2020 | CNCF | ACTION CONTINUING A FINAL - COMPLETED | — |
| Dec 4, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 3, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 3, 2019 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jun 10, 2019 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jun 10, 2019 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 10, 2019 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 20, 2019 | DMCC | DATA MODIFICATION COMPLETED | — |
| May 17, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 17, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 16, 2019 | ALIE | ASSIGNED TO LIE | — |
| May 9, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 25, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 25, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 25, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 15, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 12, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 24, 2018 | NWAP | NEW APPLICATION ENTERED | — |