USPTO serial 88239271
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
80 ACRES URBAN AGRICULTURE, INC.
Hamilton, OH
80 ACRES URBAN AGRICULTURE, INC.
CINCINNATI, OH
80 Acres Urban Agriculture LLC
Cincinnati, OH
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michelle Hon Donovan
Michelle Hon Donovan DUANE MORRIS LLP750 B STREET, SUITE 2900SAN DIEGO, CA 92101UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | computer based controls and automated digital controls for controlling the environment in greenhouses, commercial buildings and residential buildings; environmental monitoring and control system comprised of meters and sensors that measure pressure, humidity, temperature, water levels, plant nutrient levels, oxygen and carbon dioxide levels, pH, and including alarm and reporting functions; electric, electronic, or electrochemical oxygen and carbon dioxide monitors and sensors for agricultural use; cameras and optical sensors for use in building automation systems; timing sensors and electronic motion sensitive switches; electronic temperature alarms for greenhouses, commercial buildings and residential buildings; flow switches for monitoring and controlling the flow of gases or liquids; gasometers; pH sensors; pH meters; RFID readers; RFID sensors; quick response barcode sensors; barcode readers; computers and computer peripherals; software for use in controlling the environment in greenhouses, commercial buildings and residential buildings for agricultural and horticultural management | ACTIVE | — |
| 011 | hydroponics grow box in the nature of a closed environment equipped with lights, exhaust system, hydroponics growing container and odor control system; distilling water units; water purification units and installations; humidification, dehumidification and air-conditioning apparatus and installations comprised of air hoses, recirculation fans and ventilators, for use in the horticultural sector; lighting apparatus for greenhouses and hydroponics grow boxes; lighting and lighting reflectors, namely, light bulbs, light fixtures, light reflectors; cultivation lamps and parts thereof, namely, reflectors, high pressure sodium (HPS), metal halide (MH), ceramic metal halide (CMH), plasma, and light emitting diode (LED); lamp reflectors; automatic watering installations for plants, namely, irrigation sprinklers, valves, faucets, and pumps | ACTIVE | — |
| 016 | children's books; coloring books; printed books in the field of agriculture | ACTIVE | — |
| 037 | building construction and repair services; machinery maintenance and repair; machinery installation, maintenance and repair; installation, maintenance and repair of equipment for agricultural mechanization, namely, mechanical mixing machines, robots, water purification units, air purification units, water purification units and installations | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 21, 2023 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Aug 21, 2023 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Feb 3, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 2, 2023 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Feb 2, 2023 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jan 18, 2023 | EXT5 | SOU EXTENSION 5 FILED | — |
| Jan 18, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 20, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 18, 2022 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jul 18, 2022 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jul 18, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 21, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 19, 2022 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jan 19, 2022 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jan 19, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 23, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 21, 2021 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jul 21, 2021 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jul 21, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 23, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 21, 2021 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jan 21, 2021 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jan 21, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 21, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| May 26, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 26, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 6, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 14, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 14, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 14, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 14, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 14, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 16, 2019 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 16, 2019 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 16, 2019 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 16, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 13, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 13, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 28, 2019 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Apr 16, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 16, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 16, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 17, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 15, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 25, 2018 | NWAP | NEW APPLICATION ENTERED | — |