USPTO serial 88239438
A
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jul 20, 2021
- Examiner
- SWAIN, MICHELE LYNN
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with A?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*
Plus Government fees of $650
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Bozeman, MT, US
Bozeman, MT, US
BOZEMAN, MT, US
Bozeman, MT, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
William M. Fischer
William M. Fischer Sheridan Ross P.C.1560 Broadway Ste 1200Denver, CO 80202United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Downloadable CAD software, namely, computer-aided design software and computer-aided management software for architects, mechanical, electrical, and plumbing engineers, and building information modelling managers; downloadable computer aided design and manufacturing software for generating spool drawings for plumbing, HVAC, and hydronic design for general use; recorded computer aided design and manufacturing software for development of material lists and instructions for use in the field of construction, building, modeling, simulation, architecture, engineering and automated manufacturing; computer software for use in the field of building, construction, engineering, simulation, modeling, prototyping, structural analysis, manipulation of design isometrics, testing optimizations for creating spool drawings and material lists, analysis, enhanced fabrication drawing tools for improved drafting performance, configuration of plumbing and mechanical systems, integration with other software tools, and sustainable design; downloadable computer software for generating and managing physical and functional characteristics of the building process; downloadable computer software development tools; downloadable computer software for building, construction, engineering and planning of mechanical, electrical, plumbing, and HVAC locations, restrictions, enhancements and customization; downloadable computer software for modeling, digital fabrication, fabrication drawings that illustrate a clearing picture of what to build, spooling, interoperability, scheduling, collaboration with other companies and internal employees through user login, and integration amongst other platforms and software tools; computer software that provides web-based access to applications and services through a web operating system or portal interface; computer software for the databasing, visualization, manipulation, simulation, and virtual rendering of building design, construction, engineering, architecture, modeling, rendering, and manufacturing | ACTIVE | Apr 27, 2021 |
| 042 | Providing temporary use of non-downloadable cloud based computer software for modeling; providing temporary use of non-downloadable cloud based computer aided design and manufacturing software for enhanced fabrication drawing generation for general use; providing temporary use of non-downloadable cloud based computer aided design and manufacturing software for use in construction, building, modeling, simulation, architecture, engineering and automated manufacturing; providing temporary use of non-downloadable cloud based computer software for modeling, viewing, and digital fabrication systems that batch automates the users drawing process by providing tools that replicate and automate repetitive tasks; providing temporary use of non-downloadable cloud based computer software for hosting digital fabrication assemblies for communicating design intent to fabricators; providing temporary use of non-downloadable cloud based computer software for generating and managing physical and functional characteristics of the building process for mechanical, electrical, plumbing, and structural systems; providing temporary use of non-downloadable cloud based computer software for centralizing digital fabrication, costing plumbing and mechanical systems based on connected external user-defined databases, and estimating systems through digital integrations; providing temporary use of non-downloadable cloud based computer software that allows administrators and users to be added for managing digital fabrication documentation; providing temporary use of non-downloadable cloud based computer software for building, construction, engineering, simulation, testing different batch spools and autonomous tasks that are input in storage to expedite time for drawing generation, analysis, performance increasement due to the storage of user defined custom inputs, configuration of plumbing and mechanical spools to generate optimal assemblies, integration across other software that the user can define, and sustainable design; cloud based software development; design of information graphics and data visualization materials through reports and digital dashboards on the web interface; providing an internet website portal offering information in the field of computer aided design; providing temporary use of non-downloadable cloud based computer software for digitizing conventional fabrication methods and communicating design intent to other users; providing temporary use of non-downloadable cloud based software to facilitate the transmission of digital documentation remotely and across several locations | ACTIVE | Apr 27, 2021 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Allied BIM, LLC
- Other trademarks owned by Allied BIM, LLC
- Other trademarks owned by ALLIED BIM INC.
- Other trademarks owned by Allied BIM, LLC
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named A
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 12, 2026 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Oct 12, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 31, 2026 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jul 20, 2026 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Apr 9, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 9, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 9, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 9, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Apr 9, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Nov 9, 2022 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Nov 2, 2022 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Aug 29, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 29, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 29, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 29, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 29, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jul 20, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 15, 2021 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Jun 14, 2021 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| May 10, 2021 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| May 10, 2021 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 27, 2021 | IUAF | USE AMENDMENT FILED | — |
| Apr 27, 2021 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Oct 1, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 29, 2020 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Sep 29, 2020 | EXT2 | SOU EXTENSION 2 FILED | — |
| Sep 29, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 25, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 23, 2020 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Mar 23, 2020 | EXT1 | SOU EXTENSION 1 FILED | — |
| Mar 23, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 29, 2019 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 3, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 3, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 14, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 1, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 13, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 12, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 12, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 12, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 12, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 12, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 6, 2019 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| May 14, 2019 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Apr 26, 2019 | ALIE | ASSIGNED TO LIE | — |
| Apr 12, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 6, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 5, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 5, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 22, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 22, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 22, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 17, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 15, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 25, 2018 | NWAP | NEW APPLICATION ENTERED | — |