USPTO serial 88248150
PRI VALIDATION PROGRAM
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 13, 2019
- Examiner
- STURMAN, MELISSA M
- Law office
- Historical data usage
What this means
Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.
Need help with PRI VALIDATION PROGRAM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
PRI Construction Materials Technologies,LLC
Tampa, FL
Other trademarks owned by PRI Construction Materials Technologies,LLC
PRI Construction Materials Technologies,LLC
Tampa, FL
Other trademarks owned by PRI Construction Materials Technologies,LLC
PRI Construction Materials Technologies,LLC
Tampa, FL
Other trademarks owned by PRI Construction Materials Technologies,LLC
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Brian A. Hall
Brian A. Hall TRAVERSE LEGAL PLC810 COTTAGEVIEW DRIVE, SUITE G-20TRAVERSE CITY, MI 49684United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| A | Fire resistant products and components, namely, roof covering systems; building materials with surface burning characteristics, namely, insulations, sealants, laminates, fire retarded treated wood, fabrics, wall, floor and ceiling coverings, and curtains; fenestration and security products, namely, residential, commercial and industrial windows and doors, and window and door hardware; skylights, glass and glazing; plumbing products, namely, fittings and accessories, pipe and underground ducting, and couplings and cements; manufactured wood products, namely, building panels, finger joined, laminated veneer lumber, preserved wood foundation materials, structural glued-laminated timber, wood I beams, columns and open web trusses, wood shakes and shingles, and preservative treated wood; wood-plastic composites; plastic and plastic composite building materials, namely, framing, wall and roof cladding, decking and railings and building panels; building construction fasteners and connection devices, namely, screws, nails, bolts, anchors, and metal connectors; roof covering systems, namely, shingles, shakes, tiles, panels, membranes and underlayments; exterior wall coverings, namely, sidings, veneers, coatings, gypsum and cement plasters, air barriers and water resistive barriers; waterproofing and dampproofing materials; sealants and adhesives used in building constructions; structural roof, wall and roof panels, namely, wood, metal and concrete construction wood steel and aluminum framed panels, concrete and masonry panels, cross-laminated timber and insulated sandwich panels; thermal and sound insulation; building interior wall, ceiling and floor finish and trim | ACTIVE | Apr 12, 2012 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by PRI Construction Materials Technologies,LLC
- Other trademarks owned by PRI Construction Materials Technologies,LLC
- Other trademarks owned by PRI Construction Materials Technologies,LLC
- Other trademarks in Class A
- Similar marks named PRI VALIDATION PROGRAM
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 23, 2025 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| May 23, 2025 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| May 13, 2025 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Apr 15, 2025 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Jan 14, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 14, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 20, 2024 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Aug 13, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 13, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 28, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 28, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 8, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 22, 2019 | ALIE | ASSIGNED TO LIE | — |
| Apr 3, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 3, 2019 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 3, 2019 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 3, 2019 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 3, 2019 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 21, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 25, 2019 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jan 24, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 7, 2019 | NWAP | NEW APPLICATION ENTERED | — |