Drawing for Serial No. 88267329

USPTO serial 88267329

Serial No. 88267329

Reviewed by CopyMark Law Group

Reg. 5928553Status 705Registered
Filing date
Status date
Registration date
Dec 3, 2019
Examiner
WITKOWSKI, RYAN MICHAEL
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights. Track next renewal deadlines in TSDR and WIPO records.

Status 705: Status 705 means a Madrid-based U.S. registration has accepted Section 71 maintenance and Section 15 incontestability. The U.S. extension is active with strengthened rights.

Need help with Serial No. 88267329?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dyan M. House

Dyan M. House Baker & Mckenzie, LLP1900 N. Pearl Street, Suite 1500Dallas, TX 75201United States

Goods and services

ClassDescriptionStatusFirst use
035Business feasibility studies; Business project management services; Business project management services for construction projects; Operational business assistance to enterprises; Procurement, namely, purchasing equipment, machinery, supplies and associated equipment for utility, industrial, transportation, buildings, mining, commercial, governmental, public works, public accommodation and infrastructure facilities, structures and plants for othersACTIVEMay 9, 2019
036[ Arranging finance for construction projects; Financial planning, namely, commercial and financial strategy services; Project financing ]SECTION 8 - CANCELLEDMay 9, 2019
037[ Building construction observation, namely, static inspection, functional verification inspection, performance verification inspection; Construction consultation; Construction project management services; Construction of buildings, plants, structures, operating and processing facilities, and equipment for the aviation, biofuel, carbon capture and storage, chemical, coal gasification, gas-to-liquids, liquified natural gas, manufacturing, mining and minerals, oil and gas, petrochemical, pipeline, power generation and transmission, pulp and paper, refining, renewable energy, transportation, water supply, and wastewater handling industries; Inspection services in the course of construction of utilities, industrial facilities, transportation systems, buildings, mining facilities, commercial buildings, governmental facilities, public works plants, public accommodations, infrastructure facilities, structures, chemical and industrial plants, and construction equipment; Maintenance and/or repair of utilities, industrial facilities, transportation systems, buildings, mining facilities, commercial buildings, governmental facilities, public works plants, public accommodations, infrastructure facilities, structures, chemical and industrial plants, and construction equipment ]SECTION 8 - CANCELLEDMay 9, 2019
040[ Biomass gasification services; Treatment of waste water; Waste-to-energy generation services ]SECTION 8 - CANCELLEDMay 9, 2019
041[ Training in the use and operation of industrial and petrochemical plants and consultation relating thereto; IT training services ]SECTION 8 - CANCELLEDMay 9, 2019
042Computer-aided engineering services for others; Computer software development and computer programming development for others; Consulting in the field of information technology; Design, deployment and management of wireless computer networks for others; Engineering design services; Engineering services, namely, engineering for the utility, industrial, transportation, building, mining, commercial, aerospace, power, defense and government industries; Professional computer services, namely, network analysis, LAN/WAN design, wireless engineering, virtualization and computer project management; Scientific research and development; Information technology consulting servicesACTIVEMay 9, 2019
045[ Licensing of technology for ammonia, aviation, biofuel, carbon capture, carbon storage, chemical, coal gasification, coal monetization, fertilizer, gas, gas-to-liquids, hydrogen, liquified natural gas, manufacturing, minerals, mining, oil, olefins, organic chemical, paper, petrochemical, pipeline, power generation, power transmission, pulp, refining, renewable energy, synthesis gas, transportation, water supply and wastewater handling industries ]SECTION 8 - CANCELLEDMay 9, 2019

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 31, 2026NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 31, 2026C15PREGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Aug 31, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 2, 2026E815TEAS SECTION 8 & 15 RECEIVED—
Dec 3, 2024REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Apr 8, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 8, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 8, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 8, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 8, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 3, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 29, 2019SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Oct 27, 2019CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Oct 11, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 11, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 8, 2019ALIEASSIGNED TO LIE—
Oct 2, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 6, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 6, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 6, 2019CNRTSU - NON-FINAL ACTION - WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 15, 2019SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Aug 15, 2019AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jul 22, 2019IUAFUSE AMENDMENT FILED—
Jul 22, 2019EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jul 9, 2019NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 14, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 14, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 24, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 1, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 31, 2019DOCKASSIGNED TO EXAMINER—
Mar 21, 2019MDSCNOTICE OF DESIGN SEARCH CODE E-MAILED—
Feb 10, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 22, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance