USPTO serial 88280744
MCLAREN ENGINEERING GROUP APPLIED INGENUITY
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 20, 2019
- Examiner
- DANTZLER, LAUREN ALEXANDRIA
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with MCLAREN ENGINEERING GROUP APPLIED INGENUITY?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
West Nyack, NY, US
West Nyack, NY, US
West Nyack, NY, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
David Cykiert
DAVID CYKIERT ROBINSON BROG875 3RD AVENUENEW YORK, NY 10022UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 042 | Engineering Services in the field of accident reconstruction, land title surveying, evaluating amusement rides and devices, preparing animations and pre-visualization studies of engineering projects, land boundary surveys, bridge collapse, bridge inspection, bridge construction and maintenance, building collapse, building construction and maintenance, bulkhead construction and maintenance, building code compliance and technical peer review, concrete construction and maintenance, construction failure analysis, corrosion investigations and mitigation design, crane installation, custom rigging design, curtain wall facade design, structure demolition and removal, underwater diving for inspection of structures or utilities, drainage studies, design and hydrology, entertainment venue and theater structural design and renovation, erosion control, analysis and design of tensile fabric roof structures, FEMA floodplain ordinance compliance, building elevation survey and certification, flood plain impact, foundations design, construction and maintenance, geotechnical and soil engineering, highway design, hydrographic surveys, light gage metal framing, machinery operation and implementation, marina design, construction and maintenance, marine borers operation and implementation, marine engineering, namely, the design of ports, terminals, piers, wharves, berthing, mooring, and fendering systems, bridges, dams, bulkheads and relieving platforms, marine facility design, construction and maintenance, construction material and system failure analysis, mechanized effects and entertainment equipment operation and implementation, pedestrian bridge construction and maintenance, pier design, construction and maintenance, precast concrete design, construction and maintenance, prestressed concrete design, construction and maintenance, structural design with recycled plastic lumber, retaining wall design, construction and maintenance, scenery/theming and touring stage design, construction and maintenance, seismic design, ship collision analysis, ship fendering, ship and cruise terminal design, construction and maintenance, private and public development site master planning and layout, stage equipment design, construction and maintenance, structural steel- and cold formed steel-framed building design, storm water management plans, material and component stress, fatigue failure analysis, condition assessment, review, analysis and retrofit of existing structures, assessment of structural failures, parcel subdivision and land development surveys, topographic and utility surveying, resolution of boundary disputes via survey, television and film production staging and stunt structural design, theatre design, construction and maintenance, themed architectural elements and sculpture design, construction and maintenance, timber structure design, construction and maintenance, topographic surveys, underwater inspection of marine and coastal structures, utilities design, wharf design, construction and maintenance | SECTION 8 - CANCELLED | Jan 1, 2005 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by M.G. McLaren, P.C.
- Other trademarks owned by M.G. McLaren, P.C.
- Other trademarks owned by M.G. McLaren, P.C.
- Other trademarks in Class 042
- Similar marks named MCLAREN ENGINEERING GROUP APPLIED INGENUITY
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 6, 2026 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Aug 20, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Aug 20, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 4, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 4, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 15, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 30, 2019 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 29, 2019 | ALIE | ASSIGNED TO LIE | — |
| Apr 17, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 11, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 11, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 11, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 10, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 10, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 10, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 10, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 21, 2019 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Feb 21, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 1, 2019 | NWAP | NEW APPLICATION ENTERED | — |