USPTO serial 88286305
ATOMIC INDUSTRIES EVERYWHERE, USA
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 17, 2019
- Examiner
- COLLOPY, DIANE PATRICIA
- Law office
- Historical data usage
What this means
Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use. Continue use in commerce and plan for the 10-year Section 8 and 9 renewal.
Need help with ATOMIC INDUSTRIES EVERYWHERE, USA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Antoinette M. Tease
Antoinette M. Tease ANTOINETTE M. TEASE P.L.L.C.PO BOX 1902BILLINGS, MT 59103United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 040 | Custom structural fabrication of pressure piping for heavy oil facilities, conventional oil facilities, steam-assisted gravity drainage facilities, natural gas facilities, gas compression facilities, wellsite facilities, pipeline sender and receiver headers, and meter skids; custom fabrication of boiler external piping, carbon steel piping, stainless steel piping, chrome piping, pipe racks, pipe structural supports, piping modules, satellite header skids, pump skids, pressure vessels, slug catchers, knockout drums, test separators, gas suction and discharge bottles, fuel gas scrubbers, platforms, handrails, walkways and ladders; water jet cutting services, namely, cutting of ferrous and non-ferrous metals, plastics and ceramics for building construction, architectural design, and industrial manufacturing; laser cutting services, namely, cutting of ferrous and non-ferrous metals, plastics and ceramics for building construction, architectural design, and industrial manufacturing; custom manufacturing of separator skid packages, namely, a vessel for separating oil and gas matter for use in the oil and gas industry, the vessel consisting of a floor, roof, walls, piping and electronics; custom structural fabrication services, namely, fabrication of stairs, platforms, walkways, docks, handrails, mezzanines, structural columns, brackets, ladders, fall arrest cages, man baskets, lifting beams, crane rails, crane bridges, work benches, fabrication tables, racks and specialized fixtures, truck decks, tool boxes, trailer accessory components and trailer-mounted equipment in carbon steel, stainless steel, aluminum, brass and copper; custom manufacturing of skidded buildings; welding services; press break forming services, namely, fabricating, forming, bending, and dyeing non-ferrous metals | ACTIVE | Jan 15, 2019 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Atomic Industries LLC
- Other trademarks owned by Atomic Industries LLC
- Other trademarks owned by Atomic Industries LLC
- Other trademarks in Class 040
- Similar marks named ATOMIC INDUSTRIES EVERYWHERE, USA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 2, 2025 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Feb 2, 2025 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Feb 2, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 17, 2024 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Sep 17, 2024 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Sep 17, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 2, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 2, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 12, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 28, 2019 | ALIE | ASSIGNED TO LIE | — |
| May 11, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 7, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 6, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 6, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 22, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 22, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 22, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 15, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 21, 2019 | MDSM | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Feb 25, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 5, 2019 | NWAP | NEW APPLICATION ENTERED | — |