Drawing for BIM STATION

USPTO serial 88290463

BIM STATION

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
โ€”
Examiner
SNABB, SANDRA MARIE
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BIM STATION?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Rebecca Chen

Rebecca Chen Kenja IP Law PC4 North Second StreetSuite 598San Jose, CA 95113

Goods and services

ClassDescriptionStatusFirst use
009Downloadable computer software for creation, design, visualization, simulation, analysis, collaboration, monitoring and storage of building, construction, infrastructure and environment data for use in building, engineering and infrastructure modeling; electronic machines used to apply holographic overlay and to set up and control holograms and verification thereof, and their structural parts; instruments for detecting and measuring two-dimensional distribution of force and pressure; measuring instruments for temperature and humidity levels in gases and solid substances; transducers that utilize ultrasonic oscillations to test for stress and fatigue in metal and metal structures; telecommunications hardware, namely, devices for transporting and aggregating voice, data, and video communications across multiple network infrastructures and communications protocols; downloadable image files containing three dimensional digital models of buildings, construction, infrastructure and environments; pre-recorded video discs and video tapes featuring three dimensional digital models of buildings, construction, infrastructure and environments; electrical power distribution units; distribution boxes for electrical power; electronic controllers for use with power converters; rotary converters; phase shifters for communications apparatus; electrical cells and batteries; solar cells; electric meters; fire alarms; gas leak alarms; burglar alarmsACTIVEโ€”

Related trademarks

CopyMark links this record to cited ยง2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
May 2, 2022MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
May 2, 2022ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Sep 29, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILEDโ€”
Sep 27, 2021EX4GSOU EXTENSION 4 GRANTEDโ€”
Sep 27, 2021EXT4SOU EXTENSION 4 FILEDโ€”
Sep 27, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 31, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILEDโ€”
Mar 29, 2021EX3GSOU EXTENSION 3 GRANTEDโ€”
Mar 29, 2021EXT3SOU EXTENSION 3 FILEDโ€”
Mar 29, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 1, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILEDโ€”
Sep 29, 2020EX2GSOU EXTENSION 2 GRANTEDโ€”
Sep 29, 2020EXT2SOU EXTENSION 2 FILEDโ€”
Sep 29, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Apr 1, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILEDโ€”
Mar 30, 2020EX1GSOU EXTENSION 1 GRANTEDโ€”
Mar 30, 2020EXT1SOU EXTENSION 1 FILEDโ€”
Mar 30, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 20, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVEDโ€”
Oct 1, 2019NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline โ€” usually six months from the notice date.
Aug 6, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILEDโ€”
Aug 6, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 17, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILEDโ€”
Jun 26, 2019ALIEASSIGNED TO LIEโ€”
Jun 18, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTERโ€”
Jun 18, 2019XAECEXAMINER'S AMENDMENT ENTEREDโ€”
Jun 18, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILEDโ€”
Jun 18, 2019GNEAEXAMINERS AMENDMENT E-MAILEDโ€”
Jun 18, 2019CNEAEXAMINERS AMENDMENT -WRITTENโ€”
Apr 24, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 24, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 24, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 18, 2019DOCKASSIGNED TO EXAMINERโ€”
Mar 21, 2019MDSCNOTICE OF DESIGN SEARCH CODE E-MAILEDโ€”
Mar 1, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTEREDโ€”
Feb 9, 2019NWAPNEW APPLICATION ENTEREDโ€”

Frequently asked questions

Related guidance