USPTO serial 88302992
HURST
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 5, 2020
- Examiner
- BURKE, JUSTINE N
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with HURST?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $2,125
Owner
Hurst Boiler & Welding Company, Inc.
Coolidge, GA, US
Other trademarks owned by Hurst Boiler & Welding Company, Inc.
Hurst Boiler & Welding Company, Inc.
Coolidge, GA, US
Other trademarks owned by Hurst Boiler & Welding Company, Inc.
Hurst Boiler & Welding Company, Inc.
Coolidge, GA, US
Other trademarks owned by Hurst Boiler & Welding Company, Inc.
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Matthew P. Warenzak
Matthew P. Warenzak Smith, Gambrell & Russell, LLP1105 W. Peachtree Street, N.E.Suite 1000Atlanta, GA 30309Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Integrated boiler control system composed of compatible smart controls in the nature of water flow controllers, air flow controllers, fuel flow controllers, graphical displays in the nature of interactive flat panel display screens, air, water, steam, fuel, temperature, and pressure sensors, flow meters for collecting information for improved operational management of boilers, programmable logic controllers (PLC), variable frequency drives, and human-machine-interfaces devices (HMI) for efficient operation and shared duty load for industrial boilers; On-board automated monitoring control systems composed of water flow controllers, air flow controllers, fuel flow controllers, air, water, steam, fuel, temperature, and pressure sensors, flow meters for collecting information, programmable logic controllers (PLC), variable frequency drives, and recorded computer software for enabling automated fuel changeover, implemented lead-lag for maintaining constant lag pressure, and on-screen fuel management, and also featuring an operator touchscreen interface display with interactive screens available for industrial boilers; On-board monitoring and automated control systems composed of operator touchscreen interface displays, LAN integrated programmable logic controllers (PLCs), computer servers for finer degree of actuation, built in communications in the nature of PLCs, air, water, steam, fuel, temperature, and pressure sensors, transmitters for pressure, air and water flow, and temperature, and graphical displays in the nature of interactive flat panel display screens, recorded computer software for enabling internal diagnostic reporting by reporting data on boilers, sensor and detector units for use in controlling the operation of boiler apparatus and equipment, and computer interfaces for integration with existing transmission control protocol (TCP) communicating supervisory control, alarm, and data acquisition (SCADA), and data acquisition systems for industrial boilers; Single-collection control point systems comprised of an on-board automated monitoring control system composed of recorded software for monitoring boiler function, sensor and detector units for use in controlling the operation of boiler apparatus and equipment designed for control and operation to monitor and manage steam and hot water operations for industrial boilers | ACTIVE | Jan 21, 2011 |
| 011 | Industrial boilers and parts therefor; Air heating systems composed of a preheating blower with a manifold with air jets, sized to furnish sufficient air volume for industrial boilers, sold as a unit; Feed water heater systems comprised of heated metal water storage tank, steel headers, pressure reducers, metal bypass and safety valves for flow shutoff, and metal heat collection tubes; Boiler feed water deaerators composed of water conditioning units and water filtration apparatus, pump and motor sets, water inlet valves for condensate return and fresh water, steam pressure reducing valves for temperature control, safety relief valves, integrated control panel, and stand and a platform specially adapted therefore; Coal combustion systems comprised of an underfeed stoker to disperse boiler fuel; Water return systems comprised of a deaerator to process and utilize condensate to recover energy and chemicals; Boiler room peripheral and auxiliary systems comprised of blow down separators, surge tanks pressurized feed water systems composed of water tanks with support stands for mounting with optional after cooler, manual cooling valve assembly, automatic cooling valve assembly and exhaust heads to reduce water to atmospheric pressure for disposal, and open vented feed water systems composed of water tanks, stands and platforms specially adapted therefore, pumps and motor sets, water inlet valves for condensate return and fresh water, steam pressure reducing valves for temperature control, safety relief valves, and integrated electronic control panel; Fire-tube boilers, water-tube boilers, and feedwater equipment in the nature of open vent design feedwater pumps and feedwater deaerator surge tanks sold in combination for all heating and process applications | ACTIVE | Jul 27, 1981 |
| 037 | Installation, maintenance, repair, and refurbishing services for industrial boilers and industrial boiler components and parts | ACTIVE | Jan 1, 1970 |
| 040 | Custom manufacture of industrial boilers | ACTIVE | Jul 27, 1981 |
| 042 | Providing to customers temporary use of online non-downloadable computer-aided design (CAD) software for design and integration of control points and components of air handling, airflow, hydronic, steam, and plumbing systems into third parties' systems; Custom design of industrial boilers based on personal selections made by the customer | ACTIVE | Jul 27, 1981 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Hurst Boiler & Welding Company, Inc.
- Other trademarks owned by Hurst Boiler & Welding Company, Inc.
- Other trademarks owned by Hurst Boiler & Welding Company, Inc.
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named HURST
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 12, 2026 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Aug 12, 2026 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Aug 10, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 4, 2026 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| May 5, 2025 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| May 5, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 18, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 18, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 29, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 14, 2020 | ALIE | ASSIGNED TO LIE | — |
| Jan 13, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 13, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 13, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 13, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 13, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 7, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 6, 2020 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Jan 3, 2020 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Jan 2, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 2, 2020 | PETG | PETITION TO REVIVE-GRANTED | — |
| Jan 2, 2020 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Nov 13, 2019 | MAB2 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Nov 13, 2019 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Apr 29, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 29, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 29, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 29, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 14, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 19, 2019 | NWAP | NEW APPLICATION ENTERED | — |