USPTO serial 88320971
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Saint-Laurent, QUEBEC, CA
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Consulting services in the field of construction; Construction, repair, and new building of urban, road, rail, airport and port buildings and plant facilities; Construction project management; Building mechanicals services, namely, installation and maintenance of heating, cooling and ventilation systems, electrical systems, plumbing systems, elevators and escalators, and building control systems for building security, environmental monitoring, energy usage and access control; Building inspection and repair of concrete structures; Hazardous waste clean-up services for contaminated or degraded sites; Construction project management services | ACTIVE | — |
| 039 | Advisory services relating to transportation; Advisory services relating to smart mobility, namely, modes of transportation | ACTIVE | — |
| 040 | Consulting services in the field of water and waste water treatment for the purpose of maximizing environmental benefits; Consulting services in the field of environmental remediation services for soil and water; Environmental remediation services, namely, treatment of contaminated groundwater and soil; Waste processing | ACTIVE | — |
| 042 | Consulting services in the fields of engineering and energy efficiency; Mechanical, electrical, civil, chemical, materials and process engineering services; Design and planning of infrastructure development of road, rail, airport and port infrastructure and facilities for others; Real estate planning services, namely, land planning and land surveying; Land-use planning services; Landscape architecture design; Environmental impact assessments, namely, evaluating and testing the environmental qualities and environmental impact of development projects; Eco-engineering; Laboratory environmental testing services in the field of environmental protection; Feasibility studies, security surveys, environmental studies, security surveys, planning and construction of infrastructure in the fields of hydroelectricity, wind power, thermal power, biomass and biomethanization, power plants, power distribution and transmission and telecommunications; Quality assurance services on job sites and in-plant, namely, quality control for others of materials manufactured in plants and used on job sites for construction projects; Development and design of electricity smart grid networks; Design and development of wireless transmission networks, voice networks and telecommunication automation and control networks; Design and implementation of electric networks for buildings; Energy auditing services for the optimization of efficiency in buildings; Design of environmentally friendly and sustainable buildings; Design of building structures; Scientific study and research in the field of earthquake resistance; Technical audits on buildings to improve energy efficiency and to determine conformity with standards; Design and implementation of telecommunication networks; Microbiological inspection and assessment; Design and implementation of computer networks designed to control building access systems and energy systems; Engineering advice and consultation in the field of energy efficiency; Advising on operations, problem monitoring, diagnosis and resolution systems, audit, optimization, change management, critical analysis method, mitigation and correction of processes relating to discharge systems, maintenance, integrity management, surveillance and security systems, the whole in the oil and gas sector; Geology research, geomorphology research; Geotechnical engineering services; Foundation design, namely, civil engineering design of structural foundations; Building design of reservoir structures and dams; Consultation services in the field of soil improvement techniques, assessment and environmental characterizations for environmental benefits; Building mechanicals services, namely, design of heating, cooling and ventilation systems, electrical systems, plumbing systems, elevators and escalators, and building control systems for building security, environmental monitoring, energy usage and access control; Services with respect to environmental management and audit systems, namely, testing, analysis and evaluation of the services of others to determine conformity with environmental management system certification standards | ACTIVE | — |
| 045 | Consulting services with respect to building and utility facility security; Security services for physical dam buildings and structures; Services with respect to environmental management and audit systems, namely, reviewing standards and practices to assure compliance with environmental laws and regulations; Advice on governmental authorizations, namely, advice on environmental regulatory matters; Providing information in the field of building security | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 15, 2024 | MAB2 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Dec 15, 2024 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Aug 29, 2024 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Aug 29, 2024 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Aug 29, 2024 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Feb 13, 2024 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Feb 13, 2024 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Feb 13, 2024 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Feb 12, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 12, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 12, 2024 | ALIE | ASSIGNED TO LIE | — |
| Aug 22, 2023 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| May 23, 2023 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| May 23, 2023 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| May 23, 2023 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| May 22, 2023 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Nov 16, 2022 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Nov 16, 2022 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Nov 16, 2022 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Nov 15, 2022 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Mar 17, 2022 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Mar 17, 2022 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Mar 17, 2022 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Mar 10, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 10, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 6, 2022 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Sep 7, 2021 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Sep 7, 2021 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Sep 7, 2021 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Sep 1, 2021 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jan 10, 2021 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jan 10, 2021 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jan 10, 2021 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jan 8, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 8, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 28, 2020 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jun 29, 2020 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Jun 29, 2020 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Jun 29, 2020 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Jun 26, 2020 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Dec 5, 2019 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Dec 5, 2019 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Dec 5, 2019 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Nov 18, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 18, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 18, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 17, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 17, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 17, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 9, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| May 7, 2019 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| May 6, 2019 | ALIE | ASSIGNED TO LIE | — |
| Apr 29, 2019 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Mar 20, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 4, 2019 | NWAP | NEW APPLICATION ENTERED | — |