Drawing for FNX-INNOV

USPTO serial 88320986

FNX-INNOV

Reviewed by CopyMark Law Group

Status 601
Filing date
Status date
Registration date
Examiner
HETZEL, DANNEAN
Law office
TMEG LAW OFFICE 106

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with FNX-INNOV?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037(Based on 44(e)) Construction, repair, and new building of urban, road, rail, airport and port buildings and plant facilities; Construction project management; Building mechanicals services, namely, installation and maintenance of heating, cooling and ventilation systems, electrical systems, plumbing systems, elevators and escalators, and building control systems for building security, environmental monitoring, energy usage and access control; Building inspection and repair of concrete structures; Construction project management services; (Based on intent to use) Consulting services in the field of construction; Hazardous waste clean-up services for contaminated or degraded sites;ABANDONED
039(Based on 44(e)) Advisory services relating to transportation; Advisory services relating to smart mobility, namely, modes of transportationABANDONED
040(Based on 44(e)) Consulting services in the field of environmental remediation services for soil and water; Environmental remediation services, namely, treatment of contaminated groundwater and soil; Waste processing; (Based on intent to use) Consulting services in the field of water and waste water treatment for the purpose of maximizing environmental benefitsABANDONED
042(Based on 44(e)) Consulting services in the field of engineering; Mechanical, electrical, civil, chemical, materials and process engineering services; Design and planning of infrastructure development of road, rail, airport and port infrastructure and facilities for others; Real estate planning services, namely, land planning and land surveying; Land-use planning services; Landscape architecture design; Eco-engineering; Laboratory environmental testing services in the field of environmental protection; Feasibility studies, security surveys, environmental studies, security surveys, planning and construction of infrastructure in the fields of hydroelectricity, wind power, thermal power, biomass and biomethanization, power plants, power distribution and transmission and telecommunications; Quality assurance services on job sites and in-plant, namely, quality control for others of materials manufactured in plants and used on job sites for construction projects; Development and design of electricity smart grid networks; Design and development of wireless transmission networks, voice networks and telecommunication automation and control networks; Design and implementation of electric networks for buildings; Energy auditing services for the optimization of efficiency in buildings; Design of environmentally friendly and sustainable buildings; Design of building structures; Scientific study and research in the field of earthquake resistance; Technical audits on buildings to improve energy efficiency and to determine conformity with standards; Design and implementation of telecommunication networks; Microbiological inspection and assessment; Design and implementation of computer networks designed to control building access systems and energy systems; Engineering advice and consultation in the field of energy efficiency; Geology research, geomorphology research; Geotechnical engineering services; Foundation design, namely, civil engineering design of structural foundations; Building design of reservoir structures and dams; Consultation services in the field of soil improvement techniques, assessment and environmental characterizations for environmental benefits; Building mechanicals services, namely, design of heating, cooling and ventilation systems, electrical systems, plumbing systems, elevators and escalators, and building control systems for building security, environmental monitoring, energy usage and access control; Services with respect to environmental management and audit systems, namely, testing, analysis and evaluation of the services of others to determine conformity with environmental management system certification standards (Based on intent to use) Advising on operations, problem monitoring, diagnosis and resolution systems, audit, optimization, change management, critical analysis method, mitigation and correction of processes relating to discharge systems, maintenance, integrity management, surveillance and security systems, the whole in the oil and gas sectorABANDONED
045(Based on 44(e)) Security services for physical dam buildings and structures; (Based on intent to use) Consulting services with respect to building and utility facility security; Providing information in the field of building securityABANDONED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 9, 2025MAB1ABANDONMENT NOTICE E-MAILED - EXPRESS ABANDONMENT
Apr 9, 2025ABN1ABANDONMENT - EXPRESS MAILED
Apr 8, 2025EXARTEAS EXPRESS ABANDONMENT RECEIVED
Apr 1, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Apr 1, 2025XAECEXAMINER'S AMENDMENT ENTERED
Apr 1, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Apr 1, 2025GNEAEXAMINERS AMENDMENT E-MAILED
Apr 1, 2025CNEAEXAMINERS AMENDMENT -WRITTEN
Dec 2, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Dec 2, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 2, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 29, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 28, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 28, 2024ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
Aug 29, 2024GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED
Aug 29, 2024GNSIINQUIRY TO SUSPENSION E-MAILED
Aug 29, 2024CNSISUSPENSION INQUIRY WRITTEN
Feb 13, 2024GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Feb 13, 2024GNSLLETTER OF SUSPENSION E-MAILED
Feb 13, 2024CNSLSUSPENSION LETTER WRITTEN
Feb 12, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Feb 12, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 12, 2024ALIEASSIGNED TO LIE
Aug 22, 2023ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
May 23, 2023GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED
May 23, 2023GNSIINQUIRY TO SUSPENSION E-MAILED
May 23, 2023CNSISUSPENSION INQUIRY WRITTEN
May 22, 2023RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION
Nov 16, 2022GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Nov 16, 2022GNSLLETTER OF SUSPENSION E-MAILED
Nov 16, 2022CNSLSUSPENSION LETTER WRITTEN
Nov 15, 2022RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION
Mar 17, 2022GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Mar 17, 2022GNSLLETTER OF SUSPENSION E-MAILED
Mar 17, 2022CNSLSUSPENSION LETTER WRITTEN
Mar 10, 2022TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Mar 10, 2022CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 6, 2022ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
Sep 7, 2021GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED
Sep 7, 2021GNSIINQUIRY TO SUSPENSION E-MAILED
Sep 7, 2021CNSISUSPENSION INQUIRY WRITTEN
Sep 1, 2021RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION
Jan 10, 2021GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Jan 10, 2021GNSLLETTER OF SUSPENSION E-MAILED
Jan 10, 2021CNSLSUSPENSION LETTER WRITTEN
Jan 10, 2021CNSLSUSPENSION LETTER WRITTEN
Jan 8, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jan 8, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 28, 2020ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
Jun 29, 2020GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED
Jun 29, 2020GNSIINQUIRY TO SUSPENSION E-MAILED
Jun 29, 2020CNSISUSPENSION INQUIRY WRITTEN
Jun 26, 2020RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION
Dec 5, 2019GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Dec 5, 2019GNSLLETTER OF SUSPENSION E-MAILED
Dec 5, 2019CNSLSUSPENSION LETTER WRITTEN
Nov 18, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 18, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 18, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 17, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 17, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 17, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 9, 2019DOCKASSIGNED TO EXAMINER
May 7, 2019AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
May 6, 2019ALIEASSIGNED TO LIE
Apr 29, 2019PARITEAS VOLUNTARY AMENDMENT RECEIVED
Mar 20, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 4, 2019NWAPNEW APPLICATION ENTERED

Frequently asked questions

Related guidance