USPTO serial 88340049
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Ube, Yamaguchi, JP
Ube, Yamaguchi, JP
Ube, Yamaguchi, JP
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Magnesium compounds; calcium compounds; magnesium oxides; magnesium hydroxide; calcium oxides; calcium hydroxide; zinc oxide for use in manufacture; fireproofing preparations; fire extinguishing compositions; chemicals for vapor depositions; phosphor being industrial chemicals; metallic oxides for sputtering targets; sintered metal oxide; chemical agents being industrial chemicals; purification preparations and chemicals for use in aquaculture in order to improve of water quality and bottom sediment quality; bottom quality improver being industrial chemicals; soil stabilizing agents being industrial chemicals; soil setting and hardening agents being industrial chemicals; water-purifying chemicals; neutralizing agents being industrial chemicals; concrete anticorrosive being industrial chemicals; heavy metal insolubilizer being industrial chemicals; dehumidifying agents being industrial chemicals; water-bloom growth inhibitor being industrial chemicals; water-bloom flocculation precipitant being industrial chemicals; phytoplankton growth inhibitor being industrial chemicals; red tide growth inhibitor being industrial chemicals; hydrogen sulfide production-preventing agent; antibacterial agent being industrial chemicals with ancillary antibacterial qualities; industrial chemicals; soil improving agents; germination inhibitors as anti-sprouting agents; weed emergence prevention soil for gardening; polluted soil improving agents; plant growth regulating preparations; fertilizers; higher fatty acids being industrial chemicals; strontium carbonate; nonferrous metals; non-metallic minerals being industrial chemicals; unprocessed plastics as raw materials; seawater magnesia for soil solidification and soil stabilization | ACTIVE | — |
| 019 | Geotextiles for the purposes of stabilization and reinforcement of the soil in construction and landscaping that contains a weed prevention agent; weed prevention soil for construction being soils for application to sports fields; non-metallic minerals also for building for construction; soil paving material being soil cement and soil stabilizer; soil paving material being non-agricultural lime for use in construction; paving material of a mixture of soil and magnesia being soil cement and soil stabilizer; monolithic refractory being castable refractory mixes and grains, not of metal; ceramic building materials, namely, ceramic tiles, ceramic pipes, ceramic bricks; bricks; refractory products being refractory concrete, refractory cement, refractory bricks not of metal, refractory furnace linings, not of metal; building materials made of linoleum for fixing to existing walls or floors, namely, non-metal floor tiles, floor panels, ceiling tiles, ceiling panels, wall tiles, wall panels; plastic building materials being non-metal tiles, wallboards, floorboards, pipe supports; non-metal synthetic building materials, namely, floor tiles, ceiling tiles, floor, panels, wall panels, ceiling panels, bricks, pipes sheets, films, bricks mainly made of plastic; asphalt, and asphalt building or construction materials being asphalt paving compositions, asphalt floor coatings, asphalt paving, asphalted felts, asphalt roofing paper; rubber building or construction materials, namely, rubber flooring, rubber tiles, rubber panels, rubber pipes, rubber caps; plaster for building purposes; lime building or construction materials; building or construction materials of plaster; rockslide retention nets of textiles as construction materials; cement, cement pipes, cement slabs, cement aggregates, cement fillers, cement mixes; building stone; boards of inorganic fiber being fiberglass board, plaster board, wood-fiber reinforced cement board, ceramic fiber boards for construction purposes; powder of inorganic fiber being glass powder for building purposes, clay in powdered form for building purposes, ceramic powders for building purposes; slag stone, slag-lime cement | ACTIVE | — |
| 035 | Providing commercial product information online and through electronic communications networks; promotional services, namely, distribution of advertising catalogs of others and Internet advertisement; advertisement by website on the Internet; retail store services for cosmetics; wholesale distributorship services in the field of cosmetics; retail store services for non-medicated dentifrices; wholesale distributorship services in the field of non-medicated dentifrices; retail store services for mothballs and dehumidifying agent; wholesale distributorship services for mothballs and dehumidifying agent | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 14, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 14, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 14, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 10, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 10, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 25, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 25, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 5, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 15, 2022 | OTHE | CASE RETURNED TO EXAMINATION | — |
| Sep 14, 2022 | PCBG | PETITION TO DIRECTOR - CHANGE BASIS - GRANTED | — |
| Sep 13, 2022 | APET | ASSIGNED TO PETITION STAFF | — |
| Aug 29, 2022 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Aug 16, 2022 | TPAD | TEAS PETITION TO AMEND BASIS RECEIVED | — |
| Mar 4, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 3, 2022 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Feb 28, 2022 | EXT5 | SOU EXTENSION 5 FILED | — |
| Feb 28, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 29, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 27, 2021 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jul 27, 2021 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jul 27, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 24, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 22, 2021 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 22, 2021 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 22, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 22, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 20, 2020 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 20, 2020 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 20, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 7, 2020 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 6, 2020 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Mar 6, 2020 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Feb 26, 2020 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 26, 2020 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 27, 2019 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jul 2, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 2, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 12, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 24, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 23, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 3, 2019 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Apr 2, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 18, 2019 | NWAP | NEW APPLICATION ENTERED | — |