Drawing for J2 INNOVATIONS

USPTO serial 88354261

J2 INNOVATIONS

Reviewed by CopyMark Law Group

Reg. 7269839Status 700Registered
Filing date
Status date
Registration date
Jan 9, 2024
Examiner
STEINPFAD, SARAH E
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with J2 INNOVATIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Marie-Anne Mastrovito

Marie-Anne Mastrovito Womble Bond Dickinson (US) LLP888 Seventh Avenue, 38th FloorNew York, NY 10106United States

Goods and services

ClassDescriptionStatusFirst use
009Downloadable computer software for use in creating other software used to configure, monitor, and control devices used in building automation, security, fire safety, energy and other industrial, commercial and/or residential systems used in buildings; downloadable computer software for use in creating other software for interconnecting devices and/or normalizing data for use in configuring, monitoring and controlling such devices for use in building automation and Internet of Things applications for buildings; Data processing equipment, namely, computers and peripheral devices therefore for use in use in building automation and Internet of Things applications for buildings; Data processing equipment, namely, electronic memory card readers, magnetic strip readers, chip card readers, all for use in in connection with building automation, security, fire safety, energy and other industrial, commercial and/or residential systems used in buildings; Computer hardware for use in building and room automation and control systems; Computer hardware and downloadable computer software for the remote control of temperature, heating, ventilation, lighting and air conditioning regulators, thermostats, automatic timers, automatic temperature monitors, air flow monitors, air quality monitors, data transmitters and receivers for transmitting data relating to status of heating, ventilating, lighting and air conditioning systems and for communication between systems; Data processing programs, in particular in the field of building technology, building automation and room control, namely, downloadable computer software for operating building automation systems and managing, recording and processing data relating to building automation, building security systems and building heating, ventilating, lighting and air conditioning systems; computer hardware and software systems for controlling lighting, heating, air-conditioning and ventilation systems in buildings; Internet of Things (IoT) gateways in the nature of data processing apparatuses for use in connection with building automation, security, fire safety, energy and other industrial, commercial and/or residential systems in buildings; Downloadable software for connecting, operating, and managing networked HVAC systems in the Internet of Things (IoT)ACTIVEAug 5, 2021
042Design and development of computer software and hardware implementing such software in the field of building automation, security, fire safety, energy and other industrial, commercial and/or residential systems; Providing engineering consulting services to original equipment manufacturers in the field of building automation, security, fire safety, energy and other industrial, commercial and/or residential systems; Technical project management in the field of electronic data processing, namely, computer project management services in the field of building automation, security, fire safety, energy and other industrial, commercial and/or residential systems in buildings; Platform as a Service (PaaS) featuring computer software platforms for building automation; Maintenance and installation of software for configuring, monitoring, and controlling devices used in building automation, security, fire safety, energy and other industrial, commercial and/or residential systems in buildings; Providing temporary use of on-line non-downloadable software for configuring, monitoring, and controlling devices in the field of building automation, security, fire safety, energy and other industrial, commercial and/or residential systems in buildingsACTIVEAug 5, 2021

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 20, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 20, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 20, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 20, 2026CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 20, 2026COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jan 9, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 9, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 2, 2023SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Dec 1, 2023CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Oct 23, 2023DOCKASSIGNED TO EXAMINER—
Oct 19, 2023SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Oct 17, 2023IUAFUSE AMENDMENT FILED—
Oct 17, 2023EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
May 17, 2023EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 16, 2023EX5GSOU EXTENSION 5 GRANTED—
May 16, 2023AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
May 10, 2023EXT5SOU EXTENSION 5 FILED—
May 10, 2023EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 20, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 18, 2022EX4GSOU EXTENSION 4 GRANTED—
Oct 18, 2022EXT4SOU EXTENSION 4 FILED—
Oct 18, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 22, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 22, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 22, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 27, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 25, 2022EX3GSOU EXTENSION 3 GRANTED—
Apr 25, 2022EXT3SOU EXTENSION 3 FILED—
Apr 25, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 12, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Nov 10, 2021EX2GSOU EXTENSION 2 GRANTED—
Nov 10, 2021EXT2SOU EXTENSION 2 FILED—
Nov 10, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 12, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 10, 2021EX1GSOU EXTENSION 1 GRANTED—
May 10, 2021EXT1SOU EXTENSION 1 FILED—
May 10, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 10, 2020NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 2, 2020DOCKASSIGNED TO EXAMINER—
Sep 15, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 15, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 26, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 10, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 22, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 22, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 20, 2020ALIEASSIGNED TO LIE—
Jul 9, 2020NREVNOTICE OF REVIVAL - E-MAILED—
Jul 8, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 8, 2020PETGPETITION TO REVIVE-GRANTED—
Jul 8, 2020PROATEAS PETITION TO REVIVE RECEIVED—
Jan 3, 2020GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2020GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Jan 3, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 3, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 3, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 23, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 23, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 13, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 12, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 12, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 12, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 12, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 5, 2019DOCKASSIGNED TO EXAMINER—
Apr 10, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 28, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance