Drawing for CITY SILENT

USPTO serial 88409558

CITY SILENT

Reviewed by CopyMark Law Group

Reg. 6005588Status 700Registered
Filing date
Status date
Registration date
Mar 10, 2020
Examiner
WITKOWSKI, RYAN MICHAEL
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with CITY SILENT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Dennis S. Prahl

Dennis S. Prahl LADAS & PARRY LLP1040 AVENUE OF THE AMERICASNEW YORK, NY 10018United States

Goods and services

ClassDescriptionStatusFirst use
007Aerial equipment, namely, articulated boom lifts, compact crawler lifts, electric scissor lifts, personnel lifts, rough terrain scissor lifts, straight mast boom lifts, towable boom lifts, and vertical mast lifts; floor care and surface preparation equipment, namely, carpet cleaning machines, floor scrubbing machines, electric floor sweepers; leaf and debris vacuum cleaners; surface vacuum cleaners; wet and dry vacuums; floor care machines, namely, drum type floor sanders, floor buffers and polishers, floor edgers, and nailing machines; surface preparation machines, namely, concrete construction machines, concrete planning machines, scabblers and chisels for machines; Power generation equipment, namely, generators, diesel-powered electricity generators, portable electric power generators, and mobile diesel-powered electricity generators; pump equipment, namely, centrifugal pumps, pump diaphragms, high pressure pumps for machines, hydraulic power unit pumps, industrial pumps, submersible pumps, trash pumps in the nature of bilge pumps, and well point pumps in the nature of vacuum pumps; air compressors; fans for machine enginesACTIVE—
037Rental of equipment for construction and industrial equipment in the nature of aerial, concrete and masonry, floor care and surface preparation, power generation, pump, air compressors and tools, compaction and paving, earthmoving, material handlingACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 10, 2026E815TEAS SECTION 8 & 15 RECEIVED—
Mar 10, 2025REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 10, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 5, 2020DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Feb 5, 2020AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 13, 2020IUCNNOTICE OF ALLOWANCE CANCELLED—
Jan 13, 2020EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Oct 29, 2019NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 3, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 3, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 14, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 31, 2019ALIEASSIGNED TO LIE—
Jul 23, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 23, 2019XAECEXAMINER'S AMENDMENT ENTERED—
Jul 23, 2019GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 23, 2019GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 23, 2019CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 18, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 18, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 18, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 11, 2019DOCKASSIGNED TO EXAMINER—
May 17, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 3, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance