Drawing for FORBES MARSHALL

USPTO serial 88455037

FORBES MARSHALL

Reviewed by CopyMark Law Group

Reg. 6104956Status 700Renewal
Filing date
Status date
Registration date
Jul 21, 2020
Examiner
ROBERTSON, DEIRDRE G
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with FORBES MARSHALL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,446*

Plus Government fees of $1,700

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robert J. Kenney

Robert J. Kenney WILLCOX & SAVAGE, P.C.8201 Greensboro Drive, Suite 1001ATTN.: IP ADMINISTRATORMcLean, VA 22102

Goods and services

ClassDescriptionStatusFirst use
007Steam traps, namely, valves being machine parts for steam-handling systems; pumps being machine parts, namely, pumps for removing condensate, pump for machines, pump for heating equipment using steam; flash steam and condensate recovery systems being parts of machines for steam handling installations comprised of flash vessel, boiler blowdown vessel, steam traps, pumps for removing condensate; valves of all types being parts of machines, namely, multiple port valves, check valves, globe valves, gate valves, butterfly valves, lined valve, ball valves, piston valves, safety relief valves, pressure control valves, temperature control valves, desuperheating valves and control valves that control process parameters, namely, pressure, temperature, and liquid by regulating fluid flow; pressure regulators and pressure reducers, both being parts of machines; heat exchangers being parts of machines; compressors for machines; boilers for steam engines; deaerators being parts of machines that remove oxygen and dissolved gases from water for steam-generating boilers; rotary joints being parts of machines that seal and transfer fluid, oil, air, and steam from stationary sources to rotating parts; metal bars mounted within and sold as integral components of rotating drum; heat exchangers being parts of machines; pressure transducers as parts of machines; power generation system comprised of steam engineACTIVE—
009Equipment monitoring systems comprised of data processors, recorded operating software, optical sight glasses, electronic monitors for monitoring steam traps; vibration monitoring system comprised of vibration sensors, vibration meters, data processors, vibration transmitters; fluid metering apparatus, namely, flowmeters; boiler performance monitoring system comprised of boiler control instruments, data processors, gas sensors; steam meters, namely, flowmeters for steam; flow meters; dust monitors in the nature of air analysis apparatuses; electrical controllers; electrical transducers; positioners, namely, electrical controllers used to control the opening or closing of electric valve actuators, electro-pneumatic controllers used to control the opening or closing of control valve actuators and mechanical controllers used to control the opening or closing of control valve actuators; electric relays; process automation control system comprised of industrial automation controls; distributed control system comprised of controllers, input/output modules, communication modules, data processors, recorded computer software for programming, monitoring and analysis of the plant; programmable logic controller (PLC) computing system for controlling electromechanical processes comprised of controllers, input/output modules, communication modules, data processors, recorded computer software for monitoring and analysis of the plant; supervisory control and data acquisition (SCADA) computer hardware and downloadable computer software for process control of and the gathering of data to control equipment and environmental conditions in industrial machinery; scientific instruments, namely, electronic analysers for testing, measuring, and detecting contaminants and environmental pollutants in air, steam, dust, gas, water, liquids, dissolved oxygen, and chemicals, not for medical purposes and for measuring quality of steam, gas and water; measuring instruments and apparatus, namely, flow meter, level meter, water quality meter, gas meter, vibration meter, temperature meter, pressure meter; distance measuring apparatus; level metering apparatus, namely, liquid level meters; mass flow measuring instrument in the nature of a flow meter; flow switches for monitoring and controlling the flow of gases or liquids; pressure sensor; temperature sensor; vibration monitoring sensors; gauges, namely, pressure gauges and temperature gauges; probes for scientific purposes; manometers; transmitters, namely, pressure transmitter, temperature transmitters; indicators, namely, temperature indicators, pressure indicators, water level indicators, flow indicators; transceivers; data processing apparatus; electrodes; gas sensors for measuring gas concentration, gas velocity and gas pollutants; sensors for measuring wetness in steam; ph sensors in the nature of ph meters; sensors for measuring oxidation reduction potential and dissolved oxygen in fluids, not for medical purposes; electric sensors for measuring conductivity; GPS detectors in the nature of GPS receivers; accelerometer; electric transformers; solar panels for production of electricity; solar power and cogeneration systems comprised of solar panels for the production of electricity and solar cells; thermocouples; steam traps in the nature of automatic valves; downloadable software that performs predictive maintenance of plant machinery, heating installations and boilersACTIVE—
011Instruments and apparatus for central heating systems, namely, heating units for industrial and commercial purposes; humidifiers and dehumidifiers; ventilation hoods; apparatus for heating, namely, heating installations; apparatus for steam generation, namely, steam generators; apparatus for waste heat recovery using exhaust gases, steam and boiler blowdown water, namely, heat recovery ventilators; boilers, namely, packaged, industrial, waste heat recovery and waste fired boilers and steam boilers; gas and oil burners for industrial and commercial use; installations for distribution and supply of water in the nature of hot water heating installations; separators of moisture for the cleaning and purification of steam, gas and air; heat exchangers, other than parts of machines; pressure regulators for water and gas installations; strainers for steam and water lines; solar heat collection panelsACTIVE—
042Consultancy services in the field of engineering in relation to automation of electronically-controlled systems for the energy generation industry and energy auditing industry for the purpose of improving energy generation and efficiency; engineering services; scientific analysis of air, water, chemicals, steam, dust, gas and liquids in the energy generation industry; designing and developing computer hardware and software; computer programming of computer software; scientific and technological services and research and design relating thereto, namely, scientific research, analysis and design in the field of energy generation, energy consumption and process automation; scientific research and consultancy in the field of environment protection and energy efficiency; environmental surveying services and testing of pollution and exhaust emissions to ensure compliance with industry standards; providing information and consultancy of all the aforesaid; consultancy in relation to predictive maintenance in the area of information technology; providing a website featuring online, non-downloadable software that performs predictive maintenance of plant machinery, heating installations and boilersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 21, 2025REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 7, 2025EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Jul 7, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 7, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jul 7, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 7, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 21, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 5, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 5, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 15, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 30, 2020PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 23, 2020ALIEASSIGNED TO LIE—
Mar 16, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 16, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Mar 16, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 16, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 16, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 13, 2020ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 10, 2020PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 26, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 26, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Feb 26, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 26, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 26, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 21, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 20, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 20, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 20, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 20, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 20, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Oct 29, 2019GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Oct 29, 2019GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Oct 29, 2019CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Oct 28, 2019DOCKASSIGNED TO EXAMINER—
Sep 10, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 10, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 10, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 21, 2019DOCKASSIGNED TO EXAMINER—
Jun 16, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 4, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance