USPTO serial 88489450
SHYFT POWER SOLUTIONS
Reviewed by CopyMark Law Group
Status 688Notice of Allowance
- Filing date
- Status date
- Registration date
- —
- Examiner
- MATZINGER, AMY L
- Law office
- INTENT TO USE SECTION
What this means
The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.
Need help with SHYFT POWER SOLUTIONS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $947*
Plus Government fees of $450
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Nina Habib Borders
Nina Habib Borders REED SMITH, LLP10 SOUTH WACKER DRIVECHICAGO, IL 60606UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Downloadable software for monitoring and controlling electric power systems in the field of electricity distribution, power grid load shifting, and energy utilization metering, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; downloadable software for budget and cost/benefit analysis regarding use of alternative electric power sources in the field of electricity distribution, power grid load shifting, and energy utilization metering; Automatic switching apparatus and controllers for controlling electric power systems, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; Residential, commercial and industrial automation controllers in the field of electricity distribution, power grid load shifting, and energy utilization metering comprised of computer hardware and downloadable software for controlling networked devices in the internet of things (IoT), operating internet-enabled and connected electric power systems, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; electric meters, for tracking, monitoring, controlling, or reporting energy, gas, and water, usage; transformers, transformer switches being electric switches, and structural components therefor in the field of electricity distribution, power grid load shifting, and energy utilization metering | ACTIVE | — |
| 037 | Installation of solar energy systems and alternative energy products for residential, commercial and industrial use; providing information on the environmental and cost-saving benefits of solar or battery installations in the nature of information regarding best practices for typical installations, and environmental and cost-savings benefits | ACTIVE | — |
| 042 | Providing online nondownloadable software for controlling electric power systems, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; providing online nondownloadable software for budget and cost/benefit analysis regarding use of alternative electric power sources in the field of electricity distribution, power grid load shifting, and energy utilization metering; cloud computing provider services in the nature of providing electronic data storage in the field of electricity distribution, power grid load shifting, and energy utilization metering; design of energy systems for residential, commercial and industrial use | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Shyft Power Solutions, Inc.
- Other trademarks owned by Shyft Power Solutions, Inc.
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named SHYFT POWER SOLUTIONS
- Prosecution event NOAM explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 20, 2026 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 25, 2026 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 25, 2026 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 19, 2026 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 24, 2026 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 30, 2026 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Nov 24, 2025 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| May 23, 2025 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| May 23, 2025 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| May 23, 2025 | CNSL | SUSPENSION LETTER WRITTEN | — |
| May 23, 2025 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Nov 22, 2024 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jan 5, 2024 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Nov 19, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 30, 2023 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Dec 13, 2022 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| May 6, 2022 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Sep 15, 2021 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Aug 23, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 10, 2021 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jul 12, 2020 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Jul 12, 2020 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Jul 12, 2020 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Jul 8, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 8, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 8, 2020 | ALIE | ASSIGNED TO LIE | — |
| Jun 27, 2020 | NREV | NOTICE OF REVIVAL - E-MAILED | — |
| Jun 26, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 26, 2020 | PETG | PETITION TO REVIVE-GRANTED | — |
| Jun 26, 2020 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Jun 4, 2020 | MAB2 | ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 4, 2020 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Oct 11, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 11, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 11, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 16, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 9, 2019 | MDSM | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Jul 6, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 29, 2019 | NWAP | NEW APPLICATION ENTERED | — |