Drawing for SHYFT POWER SOLUTIONS

USPTO serial 88490750

SHYFT POWER SOLUTIONS

Reviewed by CopyMark Law Group

Status 688Notice of Allowance
Filing date
Status date
Registration date
—
Examiner
MATZINGER, AMY L
Law office
INTENT TO USE SECTION

What this means

The USPTO has issued a Notice of Allowance. To complete registration you generally need to file a Statement of Use or an extension request before the deadline.

Status 688: Status 688 means a Notice of Allowance was issued. For intent-to-use applications, you must file a Statement of Use with specimens or request an extension before the deadline — usually six months from the notice date.

Need help with SHYFT POWER SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Notice of Allowance, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $947*

Plus Government fees of $450

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Nina Habib Borders

Nina Habib Borders REED SMITH, LLP10 SOUTH WACKER DRIVECHICAGO, IL 60606UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Downloadable software for monitoring and controlling electric power systems in the field of electricity distribution, power grid load shifting, and energy utilization metering, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; downloadable software for budget and cost/benefit analysis regarding use of alternative electric power sources in the field of electricity distribution, power grid load shifting, and energy utilization metering; Automatic switching apparatus and controllers for controlling electric power systems, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; Residential, commercial and industrial automation controllers in the field of electricity distribution, power grid load shifting, and energy utilization metering comprised of computer hardware and downloadable software for controlling networked devices in the internet of things (IoT), operating internet-enabled and connected electric power systems, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; electric meters, for tracking, monitoring, controlling, or reporting energy, gas, and water, usage; transformers, transformer switches being electric switches, and structural components therefor in the field of electricity distribution, power grid load shifting, and energy utilization meteringACTIVE—
037Installation of solar energy systems and alternative energy products for residential, commercial and industrial use; providing information on the environmental and cost-saving benefits of solar or battery installations in the nature of information regarding best practices for typical installations, and environmental and cost-savings benefitsACTIVE—
042Providing online nondownloadable software for controlling electric power systems, namely, monitoring and controlling generators, solar systems, batteries, grid connections and inverters; providing online nondownloadable software for budget and cost/benefit analysis regarding use of alternative electric power sources in the field of electricity distribution, power grid load shifting, and energy utilization metering; cloud computing provider services in the nature of providing electronic data storage in the field of electricity distribution, power grid load shifting, and energy utilization metering; design of energy systems for residential, commercial and industrial useACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (NOAM): A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.

DateCodeEventWhat it means
Oct 20, 2026NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 25, 2026NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 25, 2026PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 19, 2026NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 24, 2026CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 30, 2026RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Nov 24, 2025RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
May 23, 2025GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
May 23, 2025GNSLLETTER OF SUSPENSION E-MAILED—
May 23, 2025CNSLSUSPENSION LETTER WRITTEN—
Apr 12, 2025RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Oct 11, 2024GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Oct 11, 2024GNSLLETTER OF SUSPENSION E-MAILED—
Oct 11, 2024CNSLSUSPENSION LETTER WRITTEN—
Oct 8, 2024RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Oct 8, 2024RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Nov 20, 2023RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Nov 19, 2023DOCKASSIGNED TO EXAMINER—
Mar 18, 2023RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jul 22, 2022RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jan 18, 2022RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Aug 23, 2021DOCKASSIGNED TO EXAMINER—
Jul 1, 2021RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jul 12, 2020GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jul 12, 2020GNSLLETTER OF SUSPENSION E-MAILED—
Jul 12, 2020CNSLSUSPENSION LETTER WRITTEN—
Jun 1, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 31, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 31, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 11, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 11, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 11, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 16, 2019DOCKASSIGNED TO EXAMINER—
Jul 8, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 29, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance