USPTO serial 88572911
PUXFLAME
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Apr 6, 2021
- Examiner
- MCBRIDE, CAMERON L
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with PUXFLAME?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
Owner
Sekisui Kagaku Kogyo Kabushiki Kaisha
Osaka, JP
Other trademarks owned by Sekisui Kagaku Kogyo Kabushiki Kaisha
Sekisui Kagaku Kogyo Kabushiki Kaisha
Osaka, JP
Other trademarks owned by Sekisui Kagaku Kogyo Kabushiki Kaisha
Sekisui Kagaku Kogyo Kabushiki Kaisha
Osaka, JP
Other trademarks owned by Sekisui Kagaku Kogyo Kabushiki Kaisha
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 017 | pipe gaskets; non-metal junctions for pipes; joint packing for metal pipe; electrical insulating materials; [ rock wool; ] slag wool for use as a building insulator; plastic semi-worked products in the form of sheets; plastic semi- worked products in the form of plates; plastic semi-worked products in the form of liquid; plastic semi-worked products; rubber, raw or semi-worked; [ soundproofing materials of rock wool, not for building purposes; ] rubber seals for jars; non-metal seals for metal and nonmetal pipe connections; resin based sealing materials used for electronic parts and LCD; insulation materials for pipes; polyurethane-made plate for construction; polyurethane-made sheet for construction; sealing material for building and construction; plastic-made pipe joints for construction | ACTIVE | — |
| 019 | refractory foam shape materials not of metal, namely, thermal insulation and incombustibility building materials; refractory cement; refractory mortars; refractory shapes, not of metal; plastic building materials, namely, plastic support building panels, fixtures, and spray emulsions for thermal insulation, anti condensation, and anti vibration systems; synthetic non-metal building materials, namely, thermal insulation, anti condensation, and anti vibration synthetic building panels and spray applied emulsions for the same purposes; asphalt, and asphalt building and construction materials, namely, asphalt paving composition building panels for thermal insulation, anti condensation; rubber building and construction materials, namely, thermal insulation, anti condensation, and anti vibration rubber building panels and spray applied emulsions for the same purposes; plaster for building purposes; lime building and construction materials; building and construction materials of plaster; agricultural nets for erosion control, namely, rockslide retention nets of textiles for construction materials; refractory cement; fireproof cement coatings; building timber; building stone; plaster boards; road signs, not of metal, non- luminous and non-mechanical | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Sekisui Kagaku Kogyo Kabushiki Kaisha
- Other trademarks owned by Sekisui Kagaku Kogyo Kabushiki Kaisha
- Other trademarks owned by Sekisui Kagaku Kogyo Kabushiki Kaisha
- Other trademarks in Class 017
- Other trademarks in Class 019
- Similar marks named PUXFLAME
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 6, 2026 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Mar 18, 2025 | NURC | NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED | — |
| Feb 24, 2025 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Feb 24, 2025 | CANT | CANCELLATION TERMINATED NO. 999999 | — |
| Feb 23, 2025 | A7OK | AMENDMENT UNDER SECTION 7 - PROCESSED | — |
| Feb 23, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 30, 2024 | CANG | CANCELLATION GRANTED NO. 999999 | — |
| Jul 31, 2024 | PETC | CANCELLATION INSTITUTED NO. 999999 | — |
| Apr 6, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 4, 2021 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Mar 4, 2021 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Nov 23, 2020 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Nov 23, 2020 | EPPA | TEAS POST PUBLICATION AMENDMENT RECEIVED | — |
| Oct 13, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 18, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 18, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 29, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 16, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 24, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 24, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 24, 2020 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 13, 2020 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 13, 2020 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 13, 2020 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 23, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 23, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 20, 2020 | ALIE | ASSIGNED TO LIE | — |
| Mar 12, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 15, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 15, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 15, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 8, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 26, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 13, 2019 | NWAP | NEW APPLICATION ENTERED | — |