Drawing for MOBILEDASH

USPTO serial 88613721

MOBILEDASH

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
SULLIVAN, JOHN C
Law office
TMO LAW OFFICE 114 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with MOBILEDASH?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kara K Martin

Kara K Martin The Franchise & Business Law Group57 West 200 South, Ste 350Salt Lake City, UT 84101UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Downloadable mobile application for sales teams in the general construction industry (residential, commercial and industrial), namely, managing leads, referrals and payroll, and scheduling appointments; downloadable mobile application for subcontractors in the general construction industry (residential, commercial and industrial), namely, scheduling appointments, managing inspection reports, warranty callbacks, and payroll; downloadable mobile application for consumers seeking general construction industry work (residential, commercial and industrial), namely, obtaining and accessing estimates, contracts and invoices; downloadable mobile application in the general construction industry (residential, commercial and industrial) for accessing training videos, weather forecast, and product information linkACTIVEFeb 1, 2022
042Software as a service (SAAS) featuring software for managing leads, referrals and payroll, scheduling appointments, managing inspection reports and warranty callbacks, obtaining and accessing estimates, contracts and invoices, and accessing links to training videos, weather forecasts, and product information for use by building contractors and those in the general construction industry (residential, commercial and industrial)ACTIVEFeb 1, 2022

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Nov 21, 2022MAB2ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 21, 2022MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 21, 2022ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 9, 2022GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 9, 2022GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 9, 2022CNRTSU - NON-FINAL ACTION - WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 7, 2022SUPCSTATEMENT OF USE PROCESSING COMPLETE—
May 6, 2022AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Apr 11, 2022AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 22, 2022IUAFUSE AMENDMENT FILED—
Mar 22, 2022EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jan 25, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 21, 2022EX3GSOU EXTENSION 3 GRANTED—
Jan 21, 2022EXT3SOU EXTENSION 3 FILED—
Jan 21, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 16, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 14, 2021EX2GSOU EXTENSION 2 GRANTED—
Jul 14, 2021EXT2SOU EXTENSION 2 FILED—
Jul 14, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 21, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 19, 2021EX1GSOU EXTENSION 1 GRANTED—
Jan 19, 2021EXT1SOU EXTENSION 1 FILED—
Jan 19, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 21, 2020NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 4, 2020ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
May 4, 2020CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Apr 27, 2020APETASSIGNED TO PETITION STAFF—
Apr 3, 2020EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Feb 18, 2020ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Jan 21, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 21, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 1, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 17, 2019ALIEASSIGNED TO LIE—
Dec 13, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 13, 2019DOCKASSIGNED TO EXAMINER—
Sep 25, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 16, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance