Drawing for THE CROSSBRIDGE GROUP

USPTO serial 88614240

THE CROSSBRIDGE GROUP

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
SCHMIDT, JOHN JOSEPH
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with THE CROSSBRIDGE GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Elizabeth Burkhard

Elizabeth Burkhard HOLLAND & KNIGHT LLP10 ST. JAMES AVENUE, 11TH FLOORBOSTON, MA 02116UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction and in-service project management services; building and facility inspection services, namely, non-destructive testing and inspection services in the course of construction of buildings, industrial plants, industrial facilities, petrochemical and chemical facilities, manufacturing facilities, utility facilities, pipelines and railcars; fleet management services, namely, maintenance and repair of railcars and valves; consulting and inspection services relating to industrial plants, metering facilities; railcar inspection servicesACTIVE—
041Providing operator qualification training and evaluations in the oil and gas and paper and pulp industry fields; safety training, namely, providing classes in the field of safety auditing and safety inspection and safety consulting servicesACTIVE—
042Health and safety auditing of vendors, contractors and other third parties for compliance with federal, state and local safety and health laws, regulations, ordinances and codes and compliance with prescribed procedures and policies in the oil and gas, transportation, rail, pulp and paper, utility and industrial fields; Quality assurance and quality control Consulting and quality assurance and quality control inspection services, namely, monitoring the construction and operation of industrial plants, industrial facilities, manufacturing facilities, utility facilities, pipelines and railcars for quality control purposes; quality management services, namely, quality evaluation in the form of inspection, analysis and quality assurance for quality control purposes in the field of construction and operation of industrial plants, industrial facilities, manufacturing facilities, utility facilities, pipelines, pumps, metering facilities; welding inspection services in the form of testing services in the fields of material joining by welding to assure compliance with construction industry standards; non-destructive testing and inspection and evaluation of metallic and composite structures, rotors, steam turbines, gas turbines and generators to assure compliance in the aerospace and power generation industry and other industrial facilities; radiography, magnetic particle testing, penetrant testing and ultrasonic testing to assure compliance with industry standards in the field of construction of buildings, industrial plants, industrial facilities, petrochemical and chemical facilities, manufacturing facilities, utility facilities, pipelines and railcars, welding inspection and related consulting and inspection for the oil and gas industry for quality control purposes; non-destructive testing for the oil and gas industry for quality control and quality assurance purposes; consulting services in the field of welding procedure development, quality control and quality assurance management; pipeline and pump inspection servicesACTIVE—
045Construction, facility and job site safety inspections, namely, inspections of factories, plant facilities, pipelines, new construction sites, multiple industry facilities, railcar, pulp and paper facilities and industrial facilities for safety purposes and workplace safety inspections; vendor surveillance servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Jun 21, 2021MAB6ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jun 21, 2021ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Nov 6, 2020EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Nov 4, 2020EX1GSOU EXTENSION 1 GRANTED—
Nov 4, 2020EXT1SOU EXTENSION 1 FILED—
Nov 4, 2020EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 19, 2020NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 24, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 24, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 4, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 18, 2020ALIEASSIGNED TO LIE—
Feb 11, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 11, 2020XAECEXAMINER'S AMENDMENT ENTERED—
Feb 11, 2020GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 11, 2020GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 11, 2020CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 13, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 13, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 13, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 13, 2019DOCKASSIGNED TO EXAMINER—
Sep 20, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 16, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance