Drawing for NORLAND

USPTO serial 88615092

NORLAND

Reviewed by CopyMark Law Group

Reg. 8055000Status 700Registered
Filing date
Status date
Registration date
Dec 9, 2025
Examiner
EULIN, INGRID C
Law office
INTENT TO USE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with NORLAND?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lisa M. Melanson

Lisa M. Melanson C/O MCCARTHY TÉTRAULT LLP745 THURLOW STREETSUITE 2400VANCOUVER, BC, V6E0C5

Goods and services

ClassDescriptionStatusFirst use
035Retail store services featuring safety equipment for construction projects; retail store services featuring industrial drilling equipment and parts therefor; distributorship services in the field of industrial drilling equipment and parts thereforACTIVE—
037General building contractor services; project management services for construction projects; construction services regarding buildings, underground utility installation, road and highways, earthworks, drainage, fisheries works, and retaining walls; construction services regarding buildings, namely, erection and dismantling of temporary use scaffolding on commercial and industrial construction sites; utility installation services for construction projects; site servicing services for construction projects, namely, repair and maintenance of construction equipment; consulting services in the field of construction; millwright services, namely, installation of milling machinery; excavation services; shoring services for construction projects, namely, installation of timber support structures; foundation contractor services for construction projects; drilling of land for construction projects; open pit mining extraction services; rock quarry services; rock slope stabilization services, namely, erection of scaffolding; building demolition services; cutting and coring services, namely cutting and coring of concrete surfaces and structures utilizing diamond tipped blades, drill bits and wire to create door and window openings and to create access points in existing commercial structures with the resultant spoils removal; grouting services; ground improvement services for construction projects, namely, installation of metal soil support structures; soil stabilization services for construction projects, namely, installation of metal soil support structures; anchoring services for construction projects, namely, installation of anchoring metal attachments to scaffolding; shotcrete services for construction projects, namely, installation of structural shotcrete; underground mining extraction and tunnel development services, namely, excavation services; maintenance and rehabilitation services for mines and tunnelsACTIVE—
039Warehouse storage services; storage and warehousing of industrial equipment; specialty rigging and industrial moving services, namely, construction lifting services for transport purposes using cranes; jack and roll services, namely, lifting and moving of heavy objects using jack and roll systems; transportation services, namely, truck hauling of heavy objectsACTIVE—
040Custom manufacture of industrial drilling equipment and parts therefor; custom fabrication services regarding tools and support structures for construction projects; grit blasting services; deep soil mixing servicesACTIVE—
042Design of temporary use scaffolding on commercial and industrial construction sites; industrial design services; structural and mechanical engineering services; field civil and geotechnical engineering services; radar scanning services for concrete surfaces and structuresACTIVE—
045Rental services of protective safety equipment for construction projectsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 9, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 9, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 19, 2025DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Nov 19, 2025AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 9, 2025IUCNNOTICE OF ALLOWANCE CANCELLED—
Sep 9, 2025D1BRTEAS DELETE 1(B) BASIS RECEIVED—
May 2, 2025EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 2, 2025EX4GSOU EXTENSION 4 GRANTED—
May 1, 2025EXT4SOU EXTENSION 4 FILED—
May 1, 2025EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 30, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 30, 2024EX3GSOU EXTENSION 3 GRANTED—
Oct 30, 2024EXT3SOU EXTENSION 3 FILED—
Oct 30, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 2, 2024EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
May 1, 2024EX2GSOU EXTENSION 2 GRANTED—
May 1, 2024EXT2SOU EXTENSION 2 FILED—
May 1, 2024EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Nov 2, 2023EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Oct 31, 2023EX1GSOU EXTENSION 1 GRANTED—
Oct 31, 2023EXT1SOU EXTENSION 1 FILED—
Oct 31, 2023EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
May 2, 2023NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Mar 7, 2023NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 7, 2023PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 15, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 30, 2023FIXDELECTRONIC RECORD REVIEW COMPLETE—
Jan 27, 2023ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Jan 24, 2023FIXDELECTRONIC RECORD REVIEW COMPLETE—
Dec 13, 2022DOCKASSIGNED TO EXAMINER—
Jun 10, 2022ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Jun 7, 2022RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jun 6, 2022CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 6, 2022RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Sep 14, 2021RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Aug 16, 2021RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Nov 19, 2020GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Nov 19, 2020GNSLLETTER OF SUSPENSION E-MAILED—
Nov 19, 2020CNSLSUSPENSION LETTER WRITTEN—
Oct 23, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 23, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 23, 2020ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jul 8, 2020GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jul 8, 2020GNSLLETTER OF SUSPENSION E-MAILED—
Jul 8, 2020CNSLSUSPENSION LETTER WRITTEN—
Jul 1, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 1, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 30, 2020ALIEASSIGNED TO LIE—
Jun 18, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 18, 2019GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 18, 2019GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 18, 2019CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 2019DOCKASSIGNED TO EXAMINER—
Sep 21, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 16, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance