Drawing for RIKTA

USPTO serial 88668954

RIKTA

Reviewed by CopyMark Law Group

Reg. 6351316Status 700Renewal
Filing date
Status date
Registration date
May 18, 2021
Examiner
KUMIS, SCOTT N
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RIKTA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,795*

Plus Government fees of $1,625

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Morris E. Turek

Morris E. Turek YOURTRADEMARKATTORNEY.COM167 LAMP AND LANTERN VILLAGE#220CHESTERFIELD, MO 63017-8208

Goods and services

ClassDescriptionStatusFirst use
006Brackets, namely, steel rigid and non-rigid top fixing brackets for rigid and non-rigid bracing of non-structural building components; Brackets, namely, steel rigid and non-rigid bottom fixing brackets for rigid and non- rigid bracing of non-structural building components; Brackets, namely, steel transverse brackets for rigid and non-rigid bracing of non-structural building components; Brackets, namely, steel transverse retrofit brackets for rigid and non-rigid bracing of non- structural building components; Brackets, namely, steel dual direction brackets for rigid and non-rigid bracing of non-structural building components; Brackets, namely, steel dual direction retrofit brackets for rigid and non-rigid bracing of non-structural building components; Brackets, namely, steel linear brackets for rigid and non-rigid bracing of non-structural building components; Brackets, namely, steel linear retrofit brackets for rigid and non-rigid bracing of non-structural building components; Brackets, namely, steel adjustable brackets for rigid and non-rigid bracing of non-structural building components; Fasteners, namely, steel self-tapping screws for rigid and non-rigid bracing of non-structural building components; Fasteners, namely, steel anchor bolts for rigid and non- rigid bracing of non-structural building components; Fasteners, namely, steel nuts for rigid and non-rigid bracing of non-structuralbuilding components; Fasteners, namely, steel joiners for rigid and non-rigid bracing of non-structural building components; Fasteners, namely, steel threaded rods for rigid and non-rigid bracing of non-structural building components; Fasteners, namely, wire fasteners for rigid and non-rigid bracing of non-structural building components; Clamps, namely, steel beam clamps for rigid and non-rigid bracing of non-structural building components; Clamps, namely, steel clamps for suspension of non-structural building components; Metal hardware, namely, steel plates for rigid and non-rigid bracing of non-structural building components; Metal hardware, namely, steel struts for rigid and non-rigid bracing of non-structural building components; Metal hardware, namely, steel washers for rigid and non-rigid bracing of non-structural building components; Pipes, namely, steel pipes for rigid and non-rigid bracing of non-structural building components; Steel tubes, namely, square hollow section (SHS) tubes for rigid and non-rigid bracing of non-structural building components; Steel tubes, namely, rectangular hollow section (RHS) tubes for rigid and non-rigid bracing of non-structural building components; Steel struts, namely, steel struts for rigid and non-rigid bracing of non-structural building components; Wire ropes, namely, wire braces for rigid and non-rigid bracing of non-structural building components incorporating color-coded tags attached to the wire to facilitate installation and identification; Wire ropes, namely, wire ropes for suspension of non-structural building componentsACTIVE—
011Lighting installations; Lighting fixturesACTIVE—
019Isolation dampers, namely, rubber bearings for seismic isolation of buildingsACTIVE—
037Construction consultationACTIVE—
042Construction drafting; Engineering in the nature of building and structural inspection services, namely, engineering, quality assessment and surveying services; Engineering design services, namely, design services relating to civil engineering; Engineering drawing services in the nature of technical drawing servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 18, 2026REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
May 18, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 9, 2021DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Apr 9, 2021AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 28, 2021IUCNNOTICE OF ALLOWANCE CANCELLED—
Jan 28, 2021D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Jan 19, 2021NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 24, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 24, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 4, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 22, 2020FIXDELECTRONIC RECORD REVIEW COMPLETE—
Oct 9, 2020ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Oct 1, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 2, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 2, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 26, 2020ALIEASSIGNED TO LIE—
Aug 5, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 5, 2020GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 5, 2020GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 5, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 31, 2020DOCKASSIGNED TO EXAMINER—
Oct 31, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 29, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance