Drawing for LIMS

USPTO serial 88681999

LIMS

Reviewed by CopyMark Law Group

Reg. 6310039Status 702Renewal
Filing date
Status date
Registration date
Mar 30, 2021
Examiner
FALK, ERIN
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 702: Status 702 means the registration is active, Section 8 was accepted, and a Section 15 declaration of incontestability was also accepted. Incontestability strengthens your rights by limiting certain challenges after five years of continuous use.

Need help with LIMS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,446*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joshua M. Gerben, Esq.

Joshua M. Gerben, Esq. Gerben Perrott PLLC1050 Connecticut Ave. NW, Suite 500WASHINGTON, DC 20036United States

Goods and services

ClassDescriptionStatusFirst use
036Surety servicesACTIVEJan 7, 2021
037Consulting services in the field of repair and restoration of buildings; consulting services in the field of subsurface remediation, namely, soil erosion control services; consulting services, namely, review and recommendations for building plumbing, electrical and mechanical systems for others; building construction services and consulting relating thereto; construction project management services; consulting and restoration services in the field of water, smoke and fire damageACTIVEJan 7, 2021
042Engineering services in the fields of structural and geotechnical engineering, building and property condition assessments, building repair and restoration, subsurface remediation, geophysical surveying; consulting services in the fields of structural and geotechnical engineering, building and property condition assessments, geophysical surveying, and commercial equipment assessments for quality control purposes; consulting services in the field of subsurface remediation, namely, soil and sediment sampling for analysis purposes; consulting services in the fields of remediation, namely, air and water sampling for analysis purposes; inspecting buildings for the existence of mold; consulting services in the field of environmental risk assessment; environmental engineering, testing and inspection services; consulting services in the field of environmental assessment, planning, and risk management; engineering and consulting services in the field of environmental evaluation, surveying, planning, restoration and compliance with quality control standards; environmental, health and safety services, namely, providing human health and ecological assessments under federal law through air quality surveys and groundwater, sediment and soil sampling, evaluating the public health impact of environmental risks on the community, administering environmental risk assessment to support dredged materials assessments, administering environmental risk assessment to support corrective action measures, scientific ecosystem evaluation after emergency response incident, performing indoor air quality evaluations, analysis of scientific data for waste characterization, analysis of scientific data for chemical exposure monitoring, noise data analysis, analysis of scientific data for environmental site characterization, and environmental risk assessment; process safety and risk management services, namely, auditing of existing process safety management programs for compliance with federal standards, process safety program auditing and evaluation for compliance with industry standards, accident prevention program assessment for compliance with industry standards, process hazard analysis review for compliance with industry standards; consulting and response services in environmental, health and safety assessment, namely, prediction and assessment of risk to facilities, agencies, locations, environment and individuals following a release of chemicals or other toxic substancesACTIVEJan 7, 2021
045Alternative dispute resolution services relating to property damage, construction claims, potential claims, disputes that may arise during the course of construction, restoration or repair; litigation support servicesACTIVEJan 7, 2021

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 14, 2026NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 14, 2026C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 14, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 24, 2026E815TEAS SECTION 8 & 15 RECEIVED—
Mar 30, 2026REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Mar 30, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 23, 2021SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Feb 22, 2021CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jan 30, 2021SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jan 30, 2021AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 11, 2021IUAFUSE AMENDMENT FILED—
Jan 11, 2021EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Jul 21, 2020NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 26, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 26, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 6, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 9, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 20, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 20, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 20, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 11, 2020GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 11, 2020GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 11, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 11, 2020DOCKASSIGNED TO EXAMINER—
Nov 13, 2019NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 9, 2019NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance