USPTO serial 88683404
TOUGHBUILT
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- DIBLE, JONATHON I
- Law office
- TMO LAW OFFICE 111
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with TOUGHBUILT?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Myron Greenspan
Myron Greenspan Nolte Lackenbach Siegel111 Brook Street, Suite 101SCARSDALE, NY 10583UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 005 | First aid kits, namely, first-aid boxes, filled; first aid kits for domestic or other non-professional use | ACTIVE | — |
| 006 | Tool chests of metal, empty; tools chests of metal sold empty; metal tool boxes, tool boxes of metal; tool boxes of metal, empty; tools chests of metal sold empty; tool accessory boxes made of metal sold empty and parts and fittings therefor; jobsite storage, namely, metal storage sheds; metal clamps; metal storage, namely, general purpose metal storage units, general purpose metal storage containers, general purpose metal storage bins, metal storage boxes for general use; metal locks, namely, door locks, pad locks, metal locks for doors, windows, desks, metal multi-point locking system in a wood door; safes, namely, electronic safes, metal safes, gun safes, metal fire resistant safes, non-metal safes, safe deposit boxes | ACTIVE | — |
| 007 | Machine tools, namely, clamps for use in the precision clamping of work pieces; generators, namely, DC generators, electrostatic generators, current generators, electricity generators, solar-powered electricity generators, gas-operated power generators, AC generators, wind-powered electricity generators, emergency power generators, high-voltage generators, portable electric power generators, electric power generators for indoor use, electric power generators using geothermal power, electric power generators using waste heat, electric generators and related equipment, namely, automatic standby electric generator sets; motorized locks, namely, door locks, door pad locks; tarps, namely, fitted tarps for power machinery, welders, namely, electric arc welders, shovels, namely, mechanical shovel, power shovel; power lawn and garden tools, namely, wood chippers; pressure washers, namely, high pressure washers, multi-purpose high pressure washers | ACTIVE | — |
| 010 | Respiratory masks for artificial respiration; emergency response kits comprised of defibrillators with bandages, dressing and disinfectants; hearing protectors without the ability to reproduce or transmit sound | ACTIVE | — |
| 011 | Flashlights and outdoor portable lighting products, namely, headlamps | ACTIVE | — |
| 012 | Truck bed storage organizers; wheel barrows | ACTIVE | — |
| 014 | Watches and accessories, namely, watches for indoor or outdoor use, parts for watches, watch straps made of metal or leather or plastic | ACTIVE | — |
| 017 | Insulating gloves | ACTIVE | — |
| 018 | Soft-sided carry-on Bags; wallets including card holders; wallets made of leather or other materials | ACTIVE | — |
| 019 | Non-metal storage sheds; pegboards | ACTIVE | — |
| 020 | Tool chests not of metal; tool chests not of metal, empty; non-metal tool boxes; tool boxes not of metal; tool boxes not of metal, empty; tool and tool accessory boxes not made of metal sold empty and parts and fittings therefor; bins of wood or plastic; non-metal fabric storage bin organizer; non-metal clamps, metal storage cabinets; patio furniture | ACTIVE | — |
| 021 | Tool bucket organizer, namely, an organizer specially adapted for affixation to a bucket for holding tools and other apparatus; work gloves; gardening gloves; light duty utility gloves; gloves for household purposes; and non-electric portable coolers and insulated containers for food or beverages designed for the professional trades | ACTIVE | — |
| 022 | Unfitted liners for the cargo area of vehicles in the nature of a tarp; protective liners of flexible vinyl for industrial tanks in the nature of a tarp; protective liners of vinyl for hot tubs, swimming pools, ponds, spas and industrial tanks in the nature of a tarp; unfitted tarps for power machinery; unfitted tarps for covering swimming pools, lining tanks | ACTIVE | — |
| 026 | Clothing accessories, namely, charms for attachment to zipper pulls and buttons, plastic clips that attach to the lower hem of shirts and blouses that allows the user to tighten the hem, buckles of precious metal | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ToughBuilt Industries, Inc.
- Other trademarks owned by ToughBuilt Industries, Inc.
- Other trademarks in Class 005
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 010
- Other trademarks in Class 011
- Other trademarks in Class 012
- Other trademarks in Class 014
- Other trademarks in Class 017
- Other trademarks in Class 018
- Other trademarks in Class 019
- Other trademarks in Class 020
- Other trademarks in Class 021
- Other trademarks in Class 022
- Other trademarks in Class 026
- Similar marks named TOUGHBUILT
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 14, 2026 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 13, 2026 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Apr 3, 2024 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Feb 5, 2024 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Feb 5, 2024 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 11, 2023 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Jul 11, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 11, 2023 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Apr 19, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 21, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 21, 2023 | NOAC | CORRECTED NOA E-MAILED | — |
| Jan 20, 2023 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Jan 20, 2023 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jan 6, 2023 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jan 6, 2023 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Jan 6, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 8, 2022 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Jul 14, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 12, 2022 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Jul 12, 2022 | EXT3 | SOU EXTENSION 3 FILED | — |
| Jul 12, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 26, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 26, 2022 | NOAC | CORRECTED NOA E-MAILED | — |
| Jan 25, 2022 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jan 25, 2022 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Jan 25, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jan 11, 2022 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jan 11, 2022 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Jan 11, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 10, 2022 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Jul 14, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 12, 2021 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jul 12, 2021 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jul 12, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jan 12, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 1, 2020 | CHPB | POST PUBLICATION AMENDMENT - ENTERED | — |
| Nov 30, 2020 | APET | ASSIGNED TO PETITION STAFF | — |
| Oct 15, 2020 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Oct 8, 2020 | EPPA | TEAS POST PUBLICATION AMENDMENT RECEIVED | — |
| May 4, 2020 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Apr 7, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 7, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 18, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 26, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 26, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 26, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 26, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 26, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 16, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 16, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 16, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 15, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 14, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 11, 2019 | NWAP | NEW APPLICATION ENTERED | — |