USPTO serial 88691328
BETA
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 5, 2021
- Examiner
- PEREZ, STEVEN M
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with BETA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*
Plus Government fees of $975
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Pineville, LA, US
Pineville, LA, US
Pineville, LA, US
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Robert Devin Ricci
Robert Devin Ricci KEAN MILLER LLP400 CONVENTION STREET, SUITE 700BATON ROUGE, LA 70802United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction and installation of electrical substation assemblies and structural components, namely, installation of structural systems, apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; Construction planning, namely, pre-construction visualization and planning for sequencing of construction; Construction, installation, repair and maintenance of electrical substation assemblies, structural components and skid-mounted electrical substations; construction services, namely, installation services and construction of electrical transmission and electrical generation facilities for conducting, switching, transforming, accumulating, regulating and or controlling electricity; construction planning services, namely, pre-construction visualization in the nature of planning and laying out of electrical transmission facilities, electrical generation facilities, and electrical substations, and planning for sequencing of construction; construction services, namely, construction project management | ACTIVE | May 26, 1975 |
| 040 | Custom fabrication of electrical substations, substation assemblies, structural components of electrical substations, switchyards, and skid-mounted substations | ACTIVE | May 26, 1975 |
| 042 | Engineering services, namely, engineering of electrical substations and switchyards; engineering services in connection with electrical substations, namely, design of protection and control schematic, arrangement of switchyards and substations, and design of ground grid; engineering of high-voltage electrical substations using pre-assembled, modular construction and lean construction techniques; engineering services, namely, civil engineering; civil engineering in the fields of civil planning, electrical substation site development, water quality management planning, storm water management planning, structural steel design, and site foundation design; custom design of electrical substations, substation assemblies, structural components, and high voltage transmission lines | ACTIVE | May 26, 1975 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Crest Industries, LLC
- Other trademarks owned by Crest Industries, LLC
- Other trademarks owned by Crest Industries, LLC
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named BETA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 19, 2026 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Apr 19, 2026 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Apr 19, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 26, 2026 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jan 5, 2026 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Jan 5, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 20, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 20, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 30, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 14, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 14, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 14, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 14, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 14, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 7, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 7, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 7, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 7, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 19, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 18, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 18, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 21, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 21, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 21, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 11, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 21, 2019 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Nov 20, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 16, 2019 | NWAP | NEW APPLICATION ENTERED | — |