USPTO serial 88721995
GRIDSOL CARE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 24, 2022
- Examiner
- CALLOWAY, CHRISTINA DENISE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with GRIDSOL CARE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Gyeonggi-Do, KR
Gyeonggi-Do, KR
Gyeonggi-Do, KR
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Kathryn Starshak
Kathryn Starshak K&L GATES LLPP.O. BOX 1135CHICAGO, IL 60690-1135UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Downloadable and recorded computer software and programs for optimally managing, operating, and forecasting energy for buildings such as electric power, heat, and gas; Factory automation control machines and instruments, namely, industrial automation controls; Electricity transformers; Distributed Control Systems (DCS) comprised primarily of industrial automation controls, downloadable and recorded industrial process control software; Downloadable and recorded computer software and programs for acquisition of data for energy consumption; Downloadable and recorded computer software and programs for optimal control of energy consumption; Remote electric meter reading machines and instruments, namely, electric meters and communication modules for measuring electric energy consumption from a remote location; Remote controlled telemetering machines and apparatuses; Electricity inverters; Electric power monitoring and controlling machines and instruments, namely, electronic monitors and monitor modules for monitoring electric current and electric signals; Electricity meters; Electric power converters; Downloadable and recorded computer software and programs for managing electric power loads; Electric power storage devices, namely, rechargeable batteries; Supervisory Control And Data Acquisition Systems (SCADA) comprised primarily of industrial automation controls, downloadable and recorded industrial process control; Machines and instruments for controlling maximum electric power demands, namely, electronic controllers used to reduce power consumption; Computers; Control devices for electricity accumulated by electric power systems, solar power, and wind power; Programmable Logic Controllers (PLC); Circuit closers; Downloadable and recorded computer software and programs for the maintenance of systems for conserving energy for buildings such as electric power, heat, and gas; Downloadable and recorded computer software and programs for controlling and maintaining optimal production of energy such as electric power, heat, and gas; Downloadable and recorded computer software and programs for systems relating to comprehensive protection, control, and operation of electric power; Downloadable and recorded computer software and programs for managing and operating electric power storage devices; Downloadable and recorded computer software and programs for monitoring and controlling electric power systems | ACTIVE | — |
| 035 | Professional consulting services relating to efficiency of energy for buildings including electric power, heat, and gas; Advisory services relating to efficiency of energy such as electric power, heat, and gas | ACTIVE | — |
| 039 | Utility services, namely, electric power grid load shifting | ACTIVE | — |
| 042 | Measurement of environments within buildings, namely, measurement and verification of carbon dioxide and other greenhouse gas emission offsets; Remote monitoring of building installations, namely, generators, heating, air-conditioning, and ventilation apparatuses; Maintenance of computer software systems for conserving energy for buildings including electric power, heat, and gas; Development of software for use in optimally managing, operating and forecasting energy for buildings; Development of data processing programs by order of third parties; Diagnostic services in the field of systems for conserving energy for buildings such as electric power, heat, and gas; Development of computer software systems relating to acquisition of data of energy consumption and optimal control of energy such as electric power, heat, and gas; Remote electric, heat, and gas meter reading services; Monitoring of computer systems by remote access to ensure proper functioning; Development of software for systems relating to comprehensive protection, control, and operation of electric power; Quality control for others in the field of electric power; Maintenance of computer software | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by LSIS Co., Ltd
- Other trademarks owned by LSIS Co., Ltd
- Other trademarks owned by LSIS Co., Ltd
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 039
- Other trademarks in Class 042
- Similar marks named GRIDSOL CARE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 24, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 24, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 1, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 1, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 9, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 21, 2022 | FIXD | ELECTRONIC RECORD REVIEW COMPLETE | — |
| Jan 7, 2022 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| Jan 5, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 5, 2022 | DMCC | DATA MODIFICATION COMPLETED | — |
| Jan 5, 2022 | ALIE | ASSIGNED TO LIE | — |
| Nov 30, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 29, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 29, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 4, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 4, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 4, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 4, 2021 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| May 18, 2021 | OTHE | CASE RETURNED TO EXAMINATION | — |
| May 18, 2021 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| May 18, 2021 | PCBG | PETITION TO DIRECTOR - CHANGE BASIS - GRANTED | — |
| May 12, 2021 | EPPA | TEAS POST PUBLICATION AMENDMENT RECEIVED | — |
| May 12, 2021 | ERTI | TEAS RESPONSE TO PETITION INQUIRY LETTER | — |
| Apr 16, 2021 | PILM | PETITION INQUIRY LETTER ISSUED | — |
| Apr 16, 2021 | APET | ASSIGNED TO PETITION STAFF | — |
| Feb 26, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 24, 2021 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 24, 2021 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 24, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 10, 2021 | TPAD | TEAS PETITION TO AMEND BASIS RECEIVED | — |
| Aug 25, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 30, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 30, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 10, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 27, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 27, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 27, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 27, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 27, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 23, 2020 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Mar 23, 2020 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Mar 23, 2020 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Mar 10, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 13, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 13, 2019 | NWAP | NEW APPLICATION ENTERED | — |