USPTO serial 88800047
FALKONAIR
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Oct 17, 2023
- Examiner
- LEE, DOUGLAS
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with FALKONAIR?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Wellington, FL
West Palm Beach, FL
West Palm Beach, FL
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Sheryl De Luca
Sheryl De Luca NIXON & VANDERHYE P.C.901 N. GLEBE ROAD, 11TH FLOORARLINGTON, VT 22203UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Air-conditioning installations; Air cooling apparatus; Air purifiers; Air purifying apparatus and machines; Refrigerating appliances and installations; Ventilation air-conditioning apparatus for heating and cooling, namely, HVAC units; Fans for HVAC units; Solar thermal panels, namely, solar heat collection panels; Solar energy collectors for heating; Evacuated heat pipe solar collectors; heat exchangers not being parts of machines; Solar thermal collectors for heating; Heat regenerators in the nature of heat exchangers not being parts of machines; Heat recovery apparatus, namely, heat recovery ventilators; Heat accumulators; Heat generators; Heat exchangers, other than parts of machines; Heat exchangers for the production of electricity not being parts of machines; Air heat recovery installations, namely, heat recovery ventilators; Air heat recovery apparatus, namely, heat recovery ventilators; solar collectors, namely, solar energy collectors for electricity generation; Solar heat collection panel arrays; parabolic mirrors for the accumulation of solar energy | ACTIVE | Dec 8, 2020 |
| 037 | Maintenance of HVAC and refrigeration systems; Maintenance, repair, and installation of HVAC systems; Heating contractor services; Heating equipment installation and repair; Installation, repair and maintenance of heating equipment; Maintenance and repair of heating installations; Heating furnace installation and repair; Air conditioning apparatus installation and repair; Air conditioning contractor services; Installation and repair of air conditioning apparatus; Repair or maintenance of air-conditioning apparatus; Electrical contracting; Electrical contractor services; Installation of electrical systems; Maintenance of heating, ventilation and air conditioning systems, plumbing installations; Plumbing; Plumbing contractor services; Plumbing services; Plumbing installation; General contractor services, namely, plumbing, heating and air conditioning contractor services; Contractor services, namely, review of and remedial recommendations for heating, air conditioning, ventilation, plumbing, electrical systems for others; Installation and replacement service for heating, ventilating and air conditioning systems; Installation and repair of heating, ventilating and air conditioning equipment; Installation, maintenance and repair of commercial and residential heating, air conditioning, ventilation, plumbing, and electrical systems and equipment; Maintenance of heating, ventilation, and air conditioning systems, plumbing systems, and electrical systems; Repair of residential and commercial heating, plumbing, air conditioning and electrical systems; Comprehensive preventative maintenance service for heating, air conditioning, ventilation, plumbing and electrical equipment and systems; Installation, maintenance and repair of attic insulation, radiant heat barriers, radiant heat resistant films, and attic ventilation systems; Installation of insulating materials; Installation, maintenance and repair of air conditioning and heating system duct work; Air conditioning vent sealing services; Installation and maintenance of solar thermal panels and systems; Installation of solar energy systems and alternative energy products for residential and commercial use; Installation, maintenance and repair of home automation systems, namely, door locks, cameras, smoke alarms, fire alarms, wireless local area network thermostats, image sensors, access controls, alarm monitors, and water shutoff controls; Providing technical support, namely, technical advice concerning the installation, repair and maintenance of electric or electronic apparatus, equipment and devices used for home automation systems and automated home security systems; Installation and maintenance of fire alarm, detection and suppression systems; Construction consultation and planning in the field of energy efficiency and sustainable construction in connection with building, renovations and improvements; home energy assessment services for the purpose of determining home improvements needed to improve energy use and efficiency; installation of energy efficient goods, namely, insulation, HVAC systems, lighting, windows, solar voltaic panels, and solar thermal panels in connection with building, renovations and improvement | ACTIVE | Dec 8, 2020 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 17, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 17, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 15, 2023 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Sep 14, 2023 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Sep 12, 2023 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Aug 24, 2023 | IUAF | USE AMENDMENT FILED | — |
| Aug 24, 2023 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Feb 22, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 21, 2023 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Feb 18, 2023 | EXT5 | SOU EXTENSION 5 FILED | — |
| Feb 18, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 17, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 15, 2022 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Aug 15, 2022 | EXT4 | SOU EXTENSION 4 FILED | — |
| Aug 15, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 29, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Apr 29, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 29, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 1, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 28, 2022 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 25, 2022 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 25, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 9, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jul 8, 2021 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jul 8, 2021 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jun 29, 2021 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jun 29, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 19, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Feb 19, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 19, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 2, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 29, 2021 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jan 29, 2021 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jan 29, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 25, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 30, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 30, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 10, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 26, 2020 | ALIE | ASSIGNED TO LIE | — |
| May 20, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 8, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 8, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 8, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 8, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 5, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 25, 2020 | MDSM | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| Feb 22, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 20, 2020 | NWAP | NEW APPLICATION ENTERED | — |