USPTO serial 88839224
BUILDING BETTER TOGETHER
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- HESIK, APRIL ANNE
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with BUILDING BETTER TOGETHER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Karen Feisthamel
Karen Feisthamel KDW FIRM PLLC2601 Weston Parkway, Suite 103CARY, NC 27513United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 002 | Protective barrier applied to pipes, namely bacterial and corrosion inhibitants in the nature of a coating | ACTIVE | — |
| 006 | Metal building materials, namely, metal cable trays used in building construction; metal cable tray systems used in building construction; metal pipes; welded pipe fittings; razor wire; metal fencing; metal fencing framework; metal posts; metal sign posts; metal conduits; metal tubing; metal pipe fittings and metal pipe connectors; metal structural tubing; metal framing, namely, building wall and ceiling framing made primarily of metal; metal caging, namely, metal telecom security caging; metal roll form shapes for or in the nature of structural channels, angles and tubes; metal channels, namely, metal structural channel members for structural supports and framing; construction elements made of metal, namely, support struts, support channels; metal strut channels; metal building wall framing systems made primarily of metal; metal ceiling grids; space frame systems, namely, framing systems using three-dimensional trusses made of metal; prefabricated building walls and roofs made primarily of metal; metal angles for construction, namely, metal structural angle for structural supports and framing; metal roof and floor trusses; steel sheets and plates | ACTIVE | — |
| 009 | Electrical components and materials, namely, electrical cable; armored fiber optics; sprinkler pipes for fire suppression; plastic and PVC conduits for use in electrical installations; metal cable protection materials, namely, electric cable sheathing; electrical wires; electrical whips and wiring components, namely, flexible wiring cables and connectors; pre-wired electrical power distribution panels; pre-wired electrical A/V distribution boxes; electrical power distribution systems, namely, electrical distribution boxes and electrical modular wiring; temporary electric lighting, namely, portable safety lighting for use at residential and commercial construction sites for safety purposes such as security lights for outdoor use and flashing safety lights; construction safety systems, namely, safety lines, connectors, fasteners and hangers, safety harnesses, and safety cables | ACTIVE | — |
| 011 | Lighting components and materials, namely modular lighting systems comprised of flat lighting panels, modular electrical wiring, electric switches, and phase selectors; temporary electrical lighting for use for use at residential and commercial construction sites in the nature of lamps, flood lights, lights of outdoor use and lighting fixtures | ACTIVE | — |
| 019 | Non-metal building materials, namely, as non-metal cable trays used in building construction; non-metal cable tray systems used in building construction; non-metal pipes; non-metal fencing; non-metal cable protection materials, namely, non-metal sheathing for electric cables; non-metal pipe fittings and non-metal pipe connectors; fiberglass channels, namely, structural channel profiles for use in building construction; fiberglass building framing systems; roof walk systems, namely, non-metal structure for walking over roofs of facilities | ACTIVE | — |
| 040 | Fabrication services, in the nature of custom fabrication of fire sprinklers; custom metal fabrication of building framing structures; steel coil processing, namely, forming, cutting and pickling; custom fabrication of tube and pipe for others | ACTIVE | — |
| 042 | Design and engineering services, in the nature of building structural design and engineering services | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Allied Tube & Conduit Corporation
- Other trademarks owned by Allied Tube & Conduit Corporation
- Other trademarks in Class 002
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 019
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named BUILDING BETTER TOGETHER
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 30, 2024 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Sep 30, 2024 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 1, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 29, 2024 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Feb 29, 2024 | EXT3 | SOU EXTENSION 3 FILED | — |
| Feb 29, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 1, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 30, 2023 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 30, 2023 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 30, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 24, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 22, 2023 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 22, 2023 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 22, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 30, 2022 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jul 5, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 5, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 15, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 28, 2022 | ALIE | ASSIGNED TO LIE | — |
| May 27, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 12, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 11, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 11, 2022 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 22, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 22, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 22, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 11, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 11, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 11, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 25, 2021 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Dec 13, 2020 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Dec 13, 2020 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Dec 13, 2020 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Dec 11, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 11, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 11, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 11, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 11, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 11, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 10, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 23, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 21, 2020 | NWAP | NEW APPLICATION ENTERED | — |