Drawing for SERAPID

USPTO serial 88864828

SERAPID

Reviewed by CopyMark Law Group

Reg. 7014947Status 700Registered
Filing date
Status date
Registration date
Apr 4, 2023
Examiner
O'BRIEN, JENNIFER LYNN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SERAPID?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Todd A. Denys

Todd A. Denys PORZIO, BROMBERG & NEWMAN, P.C.600 ALEXANDER ROAD, SUITE 2-1PRINCETON, NJ 08540UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Transportable metal constructions; Telescopic metal constructions; Movable metal constructions in translation, namely, transportable metal buildings, transportable metal structures, transportable metal seat row; Hinge clamps of metal; Metal chains; Metal pillars for buildings; Metal ramps for use with vehicles; Metal push bars; Stages for shows composed of primarily metal materials; Metal bleachers; Metal floors; movable stands of metal for use by spectatorsACTIVE—
007Machine tools, namely, metalworking machine tools ; Lifting devices for transportable metal buildings, transportable metal structures, transportable metal seat row; Elevators; escalators; Lifting installations for the transport of persons and goods; hoists; Lifting machines for handling loads; Lifting gear being parts of lifting machines for handling loads; Lifting installations for the transport of persons and goods, namely, lift columns; Elevating or lifting work platforms; Parts of machines being stands for lifting tables; Parts of machines being slide rests; Lifting installations, namely, platform truck lifts; Cargo handling apparatus with loading pallets; Loading and unloading machines, namely, machines for loading tools; Power-operated lifting and moving equipment, namely, devices for moving transportable structures; Machines for horizontal and vertical transport and for load transfer, namely, rigid chain actuators, non-magnetic belt conveyors, trolley on rail ; Mechanisms of horizontal, vertical and rotating movement, namely, rigid chain actuators; Loading and unloading machines, namely, handling machines; Loading machines; Power-operated lifting machines for moving lifts; Driving motors, other than for land vehicles; Devices for transforming rows of seats via an automated system; Seats moving guidance mechanism for modifying an auditorium layout; Driving chains other than for land vehicles; Rigid push chains for machines; Towing chains for machines; Rigid chains for machine tools; chain storage device for machine tools; Elevator belts; Machine belts; Power transmission belting for machines; power-operated jacks; Transmission jacks; Mechanical jacks; power-operated flexible jacks; Telescopic machine jacks; Linear actuators; Telescopic mechanical actuators; Actuators for mechanisms; Derricks; Robotic arms for industrial purposes; Work clamps for machine tools; powered lifting ramps; Ramps being machines; Hydraulic lift tables; mechanisms for moving swimming pool bottoms; Rotary tables for machine tools; Workpiece slide tables being machines; Tooling change devices for machine tools; Articulated consoles for tool change for machine tools; Mechanical toolsACTIVE—
037Installation, maintenance and repair services for load moving and transfer systems; Installation, maintenance and repair services for lifting equipment; Installation, maintenance and repair services for moving and handling equipment; Installation, maintenance and repair services of machine toolsACTIVE—
042Research and development in the field of product development for devices for horizontal and vertical moving loads; Research and development in the field of product development for devices for fast tool change; Research and development in the field of product development of machines for horizontal and vertical moving loads for the transformation and reconfiguration of multi-purpose venues; Design of machines and mechanical components for horizontal and vertical moving loads; Design of machines and mechanical components for fast tool change; Design of machines and mechanical components for the transformation of multi-purpose venues; Design of machines and mechanical components for structure displacement; Engineering services; Conducting of technical feasibility studies; Technological studies relating to machine toolsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 4, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 4, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 2, 2023DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Nov 21, 2022IUCNNOTICE OF ALLOWANCE CANCELLED—
Nov 21, 2022D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Jul 30, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 29, 2022EX2GSOU EXTENSION 2 GRANTED—
Jul 28, 2022AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jul 12, 2022EXT2SOU EXTENSION 2 FILED—
Jul 12, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 11, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 7, 2022EX1GSOU EXTENSION 1 GRANTED—
Jan 7, 2022EXT1SOU EXTENSION 1 FILED—
Jan 7, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 16, 2021DOCKASSIGNED TO EXAMINER—
Jul 13, 2021NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 18, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 18, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 28, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 9, 2021CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 29, 2021TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 29, 2021CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 29, 2021ALIEASSIGNED TO LIE—
Dec 23, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 26, 2020GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 26, 2020GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 26, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 25, 2020DOCKASSIGNED TO EXAMINER—
Apr 16, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 11, 2020NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance