USPTO serial 88864994
LINKLIFT
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 3, 2023
- Examiner
- O'BRIEN, JENNIFER LYNN
- Law office
- FILE DESTROYED
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with LINKLIFT?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Todd A. Denys
Todd A. Denys PORZIO, BROMBERG & NEWMAN, P.C.100 Southgate ParkwayMorristown, NJ 07962UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Transportable metal constructions; Telescopic metal constructions; Movable metal constructions in translation, namely, transportable metal buildings, transportable metal structures, transportable metal seat row; Hinge clamps of metal; Metal chains; Metal pillars for buildings; [ Metal ramps for use with vehicles; ] Metal push bars; Stages for shows composed of primarily metal materials; Metal bleachers; Metal floors; movable stands of metal for use by spectators | ACTIVE | — |
| 007 | Machine tools, namely, metalworking machine tools ; Lifting devices for transportable metal buildings, transportable metal structures, transportable metal seat row; Elevators; escalators; Lifting installations for the transport of persons and goods; hoists; Lifting machines for handling loads; Lifting gear being parts of lifting machines for handling loads; Lifting installations for the transport of persons and goods, namely, lift columns; Elevating or lifting work platforms; Parts of machines being stands for lifting tables; Parts of machines being slide rests; Lifting installations, namely, platform truck lifts; Cargo handling apparatus with loading pallets; Loading and unloading machines, namely, machines for loading tools; Power-operated lifting and moving equipment, namely, devices for moving transportable structures; Machines for horizontal and vertical transport and for load transfer, namely, rigid chain actuators, non-magnetic belt conveyors, trolley on rail ; Mechanisms of horizontal, vertical and rotating movement, namely, rigid chain actuators; Loading and unloading machines, namely, handling machines; Loading machines; Power-operated lifting machines for moving lifts; Driving motors, other than for land vehicles; Devices for transforming rows of seats via an automated system; Seats moving guidance mechanism for modifying an auditorium layout; Driving chains other than for land vehicles; Rigid push chains for machines; Towing chains for machines; Rigid chains for machine tools; chain storage device for machine tools; Elevator belts; Machine belts; Power transmission belting for machines; power-operated jacks; Transmission jacks; Mechanical jacks; power-operated flexible jacks; Telescopic machine jacks; Linear actuators; Telescopic mechanical actuators; Actuators for mechanisms; Derricks; Robotic arms for industrial purposes; Work clamps for machine tools; [ powered lifting ramps; Ramps being machines; ] Hydraulic lift tables; mechanisms for moving swimming pool bottoms; Rotary tables for machine tools; Workpiece slide tables being machines; Tooling change devices for machine tools; Articulated consoles for tool change for machine tools; Mechanical tools | ACTIVE | — |
| 037 | Installation, maintenance and repair services for load moving and transfer systems; Installation, maintenance and repair services for lifting equipment; Installation, maintenance and repair services for moving and handling equipment; Installation, maintenance and repair services of machine tools | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SERAPID - FRANCE
- Other trademarks owned by SERAPID - FRANCE
- Other trademarks owned by SERAPID - FRANCE
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 037
- Similar marks named LINKLIFT
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 29, 2025 | NURC | NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED | — |
| Sep 12, 2024 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| Sep 9, 2024 | PRAN | POST REGISTRATION ACTION MAILED NO RESPONSE REQUIRED | — |
| Sep 9, 2024 | A7OK | AMENDMENT UNDER SECTION 7 - PROCESSED | — |
| Nov 17, 2023 | PRAM | POST REGISTRATION ACTION MAILED - SEC. 7 | — |
| Nov 7, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 27, 2023 | ES7R | TEAS SECTION 7 REQUEST RECEIVED | — |
| Jan 3, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 3, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 30, 2022 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Nov 21, 2022 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Nov 21, 2022 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Aug 13, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Aug 12, 2022 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Aug 12, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Aug 3, 2022 | EXT2 | SOU EXTENSION 2 FILED | — |
| Aug 3, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 11, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 9, 2022 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 9, 2022 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 9, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Aug 10, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jul 16, 2021 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 15, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 15, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 26, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 10, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 29, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 29, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 29, 2021 | ALIE | ASSIGNED TO LIE | — |
| Dec 23, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 26, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 26, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 26, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 25, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 17, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 11, 2020 | NWAP | NEW APPLICATION ENTERED | — |