USPTO serial 88867286
QMAT
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- FRUM MILONE, MARCIE R
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with QMAT?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Robert H. Newman
Robert H. Newman REED SMITH LLPP.O. Box 488IP Docketing DepartmentPittsburgh, PA 15230-0488Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Crane mats in the nature of composite mats composed primarily of metal for use as load support surfaces in the construction, energy, oil and gas, and utility industries; crane mats for construction in the nature of composite mats composed primarily of metal for use as load support surfaces in the construction, energy, oil and gas, and utility industries; crane mats in the nature of composite mats composed primarily of metal for use as load support surfaces in the construction industry particularly for use in creating temporary roadways, and supporting and stabilizing utility cranes in the utility, energy, oil and gas, and construction industries | ACTIVE | — |
| 020 | Work surfaces; work surfaces for construction; crane mats composed primarily of non-metal for use as load support surfaces in the construction, energy, oil and gas, and utility industries and work surfaces composed primarily of non-metal for cranes and other equipment on construction and industrial sites; crane mats composed primarily of non-metal for use as load support surfaces in the construction, energy, oil and gas, and utility industries; work surfaces, principally of metal, for cranes and other equipment on construction and industrial sites; work surfaces made primarily of wood; work surfaces made primarily of wood for construction; work surfaces, namely, timber mats for use as load support surfaces in the construction, energy, oil and gas, and utility industries; work surfaces, namely, timber mats for cranes and other equipment on construction and industrial sites; work surfaces made primarily of wood for use as load support surfaces in the construction, energy, oil and gas, and utility industries; work surfaces made primarily of wood for cranes and other equipment on construction and industrial sites; work surfaces, namely, rig mats; work surfaces, namely, laminated mats | ACTIVE | — |
| 037 | Rental of construction equipment in the nature of crane mat, timber mats, and work surfaces; rental of mats and work surfaces for cranes; rental of crane mats, timber mats, and pads in the nature of work surfaces for use in creating temporary roadways, supporting and stabilizing utility trucks, cranes, excavators, vehicles and other heavy equipment in the utility, energy, oil and gas, and construction industries; installation of crane mats, timber mats, and work surfaces for cranes and other equipment on construction and industrial sites | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Quality Mat Company
- Other trademarks owned by Quality Mat Company
- Other trademarks in Class 006
- Other trademarks in Class 020
- Other trademarks in Class 037
- Similar marks named QMAT
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 6, 2024 | MAB6 | ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| May 6, 2024 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Oct 5, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Oct 4, 2023 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Oct 4, 2023 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Sep 27, 2023 | EXT5 | SOU EXTENSION 5 FILED | — |
| Sep 27, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 1, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 30, 2023 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Mar 30, 2023 | EXT4 | SOU EXTENSION 4 FILED | — |
| Mar 30, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 29, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 27, 2022 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Sep 27, 2022 | EXT3 | SOU EXTENSION 3 FILED | — |
| Sep 27, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 1, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 30, 2022 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Mar 30, 2022 | EXT2 | SOU EXTENSION 2 FILED | — |
| Mar 30, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 1, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 29, 2021 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Sep 29, 2021 | EXT1 | SOU EXTENSION 1 FILED | — |
| Sep 29, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Mar 30, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Feb 2, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 2, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 13, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 30, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 30, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 29, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 29, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 29, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 29, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 29, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 28, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 19, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 14, 2020 | NWAP | NEW APPLICATION ENTERED | — |