Drawing for ARCOSA TRAFFIC STRUCTURES

USPTO serial 88883057

ARCOSA TRAFFIC STRUCTURES

Reviewed by CopyMark Law Group

Reg. 7012851Status 700Registered
Filing date
Status date
Registration date
Mar 28, 2023
Examiner
LEE, SANG MIN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ARCOSA TRAFFIC STRUCTURES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Tyler M. Beas

Tyler M. Beas Baker Botts L.L.P.2001 Ross AvenueSuite 900Dallas, TX 75201-2900

Goods and services

ClassDescriptionStatusFirst use
006Metal holders for signs; Metal structures for highway and traffic signs and lights, namely, metal posts and metal supports for holding and supporting highway and traffic signs and street lights; Metal posts; Metal posts for highway and traffic signs and lights; Metal support arms for traffic and highway signs and lights, namely, metal posts; Metal beams; Non-luminous and non-mechanical metal signs; Non-luminous and non-mechanical traffic signs of metal; Mounting brackets of metal for general use; Mounting brackets of metal for use in securing highway and traffic signs, street lights, traffic signals, traffic monitoring systems, open road tolling systems, cameras and camera equipment, and street, road and highway data collection equipment; Metal connectors for interconnecting beams; Handrails of metal; Gantries of metal for mounting and supporting highway and traffic signs and signals, traffic monitoring systems, open road tolling systems, cameras and camera equipment, and street, road and highway data collection equipment; Tolling structures of metal, namely, prefabricated metal bridges, metal gantries, and multi-post assemblies in the nature of metal posts, metal arms, metal beams, and mounting brackets of metal, for mounting and supporting open road tolling systems, tolling transponder equipment, highway, street and road data collection equipment, and highway, street and road camera equipment; Metal bridge mounts; Multi-post assemblies in the nature of metal posts, metal arms, metal beams, and mounting brackets of metal for highway and traffic structuresACTIVEMay 1, 2020
037Consulting in the field of bridge construction and maintenance; Construction, maintenance, repair and refurbishment of bridges, bridge components, highway and traffic structures, and highway and traffic signs; Maintenance, repair and refurbishment of steel sign and light structures, sign arms, toll gantries, bridge mounts, custom brackets, multi-post assemblies; Steel structure construction worksACTIVEMay 1, 2020
040Custom steel rolling and fabrication to the order and specification of others; Welding servicesACTIVEMay 1, 2020

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 23, 2024ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Mar 28, 2023NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Mar 28, 2023R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 22, 2023SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Feb 21, 2023CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Feb 6, 2023SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Feb 4, 2023AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jan 17, 2023DOCKASSIGNED TO EXAMINER—
Jan 4, 2023IUAFUSE AMENDMENT FILED—
Jan 4, 2023EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Aug 3, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 1, 2022EX3GSOU EXTENSION 3 GRANTED—
Aug 1, 2022EXT3SOU EXTENSION 3 FILED—
Aug 1, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 27, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 27, 2022EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Jun 27, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 27, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 7, 2022EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 5, 2022EX2GSOU EXTENSION 2 GRANTED—
Jan 5, 2022EXT2SOU EXTENSION 2 FILED—
Jan 5, 2022EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 28, 2021EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 26, 2021EX1GSOU EXTENSION 1 GRANTED—
Jul 26, 2021EXT1SOU EXTENSION 1 FILED—
Jul 26, 2021EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 2, 2021NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 8, 2020NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 8, 2020PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 18, 2020NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 30, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 16, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 15, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 15, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 16, 2020GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 16, 2020GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 16, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 16, 2020GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 16, 2020GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 16, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 15, 2020DOCKASSIGNED TO EXAMINER—
May 1, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 25, 2020NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance