USPTO serial 88895665
CE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Feb 15, 2022
- Examiner
- RATCLIFFE, ROBERT L
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with CE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $1,625
Owner
Ceres Intellectual Property Company Limited
West Sussex, GB
Other trademarks owned by Ceres Intellectual Property Company Limited
Ceres Intellectual Property Company Limited
West Sussex, GB
Other trademarks owned by Ceres Intellectual Property Company Limited
Ceres Intellectual Property Company Limited
West Sussex, GB
Other trademarks owned by Ceres Intellectual Property Company Limited
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mark B. Mizrahi
Mark B. Mizrahi SAUL EWING, LLP1888 CENTURY PARK EAST15TH FLOORLOS ANGELES, CA 90067Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines for generating electrical power and machine tools for use therewith, namely, solar-powered electricity generators, gas-operated power generators, AC generators, DC generators, electrostatic generators and electricity generators; motors and engines, except for land vehicles; machine coupling and transmission components, except for land vehicles; power units and devices for generating electricity, namely, solar-powered electricity generators, gas-operated power generators, AC generators, DC generators, electrostatic generators and electricity generators; machines, installations and parts therefor for generation, transmission and distribution of electricity and energy, namely, solar-powered electricity generators, gas-operated power generators, AC generators, DC generators, electrostatic generators and electricity generators; solar-powered electricity generators, gas-operated power generators, AC generators, DC generators, electrostatic generators and electricity generators; power generators; electrical power generating devices for industrial and domestic use; electrochemical generators, namely, electrochemical power devices for converting chemicals to electrical power; equipment for supplying chemicals to such electro-chemical power devices, namely, pumps for use in electro-chemical power devices; electrochemical generators, namely, electrochemical power devices for converting fuels to electrical power; equipment for supplying fuels to such electro-chemical power devices, namely, pumps for use in electro- chemical power devices; electrochemical generators, namely, electrochemical power devices for converting gases to electrical power; equipment for supplying gases to such electro-chemical power devices, namely, pumps for use in electro-chemical power devices; apparatus and machines for the production of fuels, gases and chemicals, namely, blending machines for chemical processing, filtering machines for chemical processing, extracting machines for chemical processing, emulsifying machines for chemical processing, evaporators for chemical processing; fuel cell power generators; integrated fuel cell hybrid power generators; fuel cell power generators with integrated fuels, gases and chemicals generator; solid oxide fuel cell (SOFC) power generator with integrated fuels, gases and chemicals storage capacities for use in fuel management, thermal management, humidification, power conditioning, overall system monitoring and control and manufacturing; portable proton exchange membrane (PEM) fuel cell power generator with integrated fuels, gases and chemicals storage capacities for use in fuel management, thermal management, humidification, power conditioning, overall system monitoring and control and manufacturing; integrated fuel cell power generators comprising of fuel cell stacks, valves, pumps, compressors, pressure regulators, sensors, electronic controls, heat exchangers, hydrocarbon reformers, and fluid and heat transfer piping; equipment and installations for the generation of power, namely, solar-powered electricity generators, gas-operated power generators, AC generators, DC generators, Electrostatic generators and electricity generators; fuels, gas and chemical generator parts, namely, compressors for generators; motors and engines not for land vehicles, and parts and components thereto being filters and pumps; generators and fuel conversion apparatus being parts of internal combustion engines; parts and fittings for all of the aforesaid goods, namely, filters and pumps; fuels dispensing pumps for service stations; electro-chemical generators for generating electricity; fuel-cell operated generators, namely, integrated fuel cell power generating systems and sub-systems; fuels, gases and chemicals dispensing equipment | ACTIVE | — |
| 009 | Scientific, research, navigation, surveying, photographic, cinematographic, audiovisual, optical, weighing, measuring, signalling, detecting, testing, inspecting, life-saving and teaching apparatus and instruments, namely, conductivity meters, ultra-high vacuum chambers, electric navigational instruments; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; Apparatus and instruments for recording, transmitting, reproducing or processing sound, images or data; downloadable computer software for database management; downloadable computer software for use in fuel cell test stations; downloadable computer software for automated fuel cell test stations; downloadable computer software for fuels, gas and chemical test stations; computers and computer peripheral devices; fuel cells; fuel cell stacks; electrolysers; electrolyser cells; electrolyser for the production of synthetic gas; electrolyser for the production of fuels, gases and chemicals; fuel cell auxiliary power units; test stations for fuel cells; automated fuel cell test stations; integrated fuel cell systems; test stations for fuels, gases and chemicals generators; hydrogen fuel cells; anodes, sensors, cathodes, pre-packed columns for use in separation for use in water electrolysers, membranes for hydrogen fuel cells and water electrolysers; electricity-generating fuel cell power modules; electric cells and batteries; electrical power distribution units; electrolysers for generating fuels, gases and chemicals; electronic downloadable publications, namely, newsletters and journals in the field of fuel cells; gas, voltage, pressure and electric current regulators; data processing equipment; batteries; rechargeable batteries; chargers for batteries and electric accumulators; chargers for electric batteries; electronic controllers, electronic valves for controlling gas or fluids, electric circuit switches and circuits for the aforesaid goods; recorded non-downloadable computer software for database management; recorded non-downloadable computer software for use in fuel cell test station; recorded non-downloadable computer software for automated fuel cell test stations; recorded non-downloadable computer software for fuels, gas and chemical test stations | ACTIVE | — |
| 011 | Energy storage plants being fuels, gas and chemical power storage systems; energy storage plants being fuels, gas and chemical power storage systems, namely, systems containing an electrolyser for converting electrical energy to fuels, gases and chemicals, a means of storing the fuels, gases and chemicals and means for converting the fuels, gases and chemicals back to electrical energy | ACTIVE | — |
| 037 | Vehicle refueling stations, namely, the technical operation of fuels, gas and chemical refueling stations; construction project management services, namely, commissioning alternate energy systems; consulting, project development and project operation services related to the construction of fuels, gas and chemical energy systems | ACTIVE | — |
| 042 | Scientific and technological services, namely, research and design in the field of energy production; Industrial analysis of energy systems to assure compliance with industry standards; industrial research services in the field of energy production; Design and development of computer hardware and software; design for others in the field of energy production, energy systems, fuel cells, chemical systems, electrical power and natural gas production, namely, designing industrial and commercial fuels, gases and chemical systems; technical consulting services in the fields of energy measurement to improve energy efficiency; energy auditing; programming of energy management software; engineering services in the field of electrical power and natural gas production; computer programming; industrial design services; research and development of energy and power management systems; installation, maintenance and repair of computer software; consultation, research and development and testing services related to fuels, gases and chemical power and fuels, gases and chemical powered products; fuel cell testing services; fuels, gases and chemicals testing services; designing, testing of fuel cell systems and fuels, gases and chemicals generators; design for others in the field of energy systems, namely, designing alternate energy systems; consulting, engineering, project development and project operation services related to the design of fuel cells; consulting, engineering, project development and project operation services related to the design of fuels, gas and chemical energy systems; creation, design and maintenance of websites for others; technological consulting in the field of manufacture; engineering consulting in the field of manufacture; quality control of manufacture goods; information, advisory and consultancy services relating to all the aforesaid; providing on-line non-downloadable computer software for database management; providing on-line non-downloadable computer software for use in fuel cell test station; providing on-line non-downloadable computer software for automated fuel cell test stations; providing on-line non-downloadable computer software for fuels, gas and chemical test stations | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Ceres Intellectual Property Company Limited
- Other trademarks owned by Ceres Intellectual Property Company Limited
- Other trademarks owned by Ceres Intellectual Property Company Limited
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named CE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 26, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 26, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 26, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 15, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 12, 2022 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Jan 12, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Dec 8, 2021 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Dec 8, 2021 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| Nov 30, 2021 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Oct 5, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 5, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 15, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 30, 2021 | FIXD | ELECTRONIC RECORD REVIEW COMPLETE | — |
| Aug 27, 2021 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| Aug 24, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 18, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 17, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 17, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 1, 2021 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 1, 2021 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 1, 2021 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 1, 2021 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| May 18, 2021 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| May 4, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 4, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 4, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 3, 2021 | ALIE | ASSIGNED TO LIE | — |
| Apr 28, 2021 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Apr 15, 2021 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Apr 15, 2021 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Apr 15, 2021 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Mar 13, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 13, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 11, 2021 | ALIE | ASSIGNED TO LIE | — |
| Dec 8, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 8, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 8, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 8, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 28, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| May 15, 2020 | MDSC | NOTICE OF DESIGN SEARCH CODE E-MAILED | — |
| May 14, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 4, 2020 | NWAP | NEW APPLICATION ENTERED | — |