USPTO serial 88900803
STORMSCAPE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jun 2, 2026
- Examiner
- MCNAMARA, SHANA MARIE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with STORMSCAPE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Clevedon, GB
Clevedon, GB
DUBLIN 2, IE
Clevedon, GB
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
LUNA M SAMMAN
LUNA M SAMMAN ARENTFOX SCHIFF LLP1717 K STREET NWWASHINGTON, DC 20006United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Apparatus for water supply and sanitary purposes, namely, a stormwater treatment and detention system within the field of bioretention comprised of baffle walls, engineered filter media and plant life; apparatus for sewer network treatment and water treatment, namely, water filter and ground soil percolation systems comprised of baffle walls, engineered filter media and plant life for the purpose of removing contaminants found in stormwater runoff within the field of bioretention; water filtering installations; water filtering apparatus; water purification installations; water sterilisers; water purifying machines; membranes for the filtration of water; cartridge filtration units for treating water; filters made of fibre for water treatment; reverse osmosis water filtration units; water purification, sedimentation and filtration apparatus for clarification, thickening and filtration of water, waste water and industrial water; filters and screens for removal of solids in water treatment systems; water filtering apparatus for use in screening and separating solid matter and particulates from waste water; apparatus, installations and systems for the management, flow, storage and treatment of water, namely, a bioretention system comprised of baffle walls, engineered filter media and plant life for the purpose of removing contaminants found in stormwater runoff; apparatus, installations and systems for the control and management of water flow, including flow of stormwater, and industrial effluent, namely, a modular, partly-submerged base for use as a water filtering apparatus that contains baffle walls, engineered filter media and plant life; stormwater drainage systems comprised of a modular, partly submerged base for use as a water filtering apparatus that contains containing baffle walls, engineered filter media and plant life; parts, accessories and fittings for all of the aforesaid goods, namely, structural parts for the aforesaid goods, water filtering apparatus in the nature of filtering water and engineered filter media, namely, filtering materials made of engineered coarse and fine sand mixed with organic material such as peat, loam or carbon; apparatus, installations and systems for the management, flow, storage and treatment of water, namely, filtration and infiltration systems, namely, a modular, partly-submerged base comprised of baffle walls in the nature of submergible fiberglass and metal or concrete walls used to direct water flow, engineered filter media and plant life; apparatus, installations and systems for the control and management of water flow, including flow of stormwater, and industrial effluent, namely, a modular, partly-submerged base comprised of baffle walls in the nature of submergible fiberglass walls used to direct water flow, engineered filter media and plant life | ACTIVE | Aug 3, 2020 |
| 019 | industrial underground water storage tanks of masonry | ACTIVE | Aug 3, 2020 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Hydro International Limited
- Other trademarks owned by Hydro International Limited
- Other trademarks owned by CGH GROUP SERVICES LIMITED
- Other trademarks owned by Hydro International Limited
- Other trademarks in Class 011
- Other trademarks in Class 019
- Similar marks named STORMSCAPE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 16, 2026 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jun 2, 2026 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 2, 2026 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 12, 2026 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| May 12, 2026 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Nov 13, 2025 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Nov 13, 2025 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jul 10, 2025 | IUAF | USE AMENDMENT FILED | — |
| Jul 10, 2025 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Jan 6, 2025 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jan 6, 2025 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Jan 2, 2025 | EXT5 | SOU EXTENSION 5 FILED | — |
| Jan 2, 2025 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 22, 2024 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 22, 2024 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jun 22, 2024 | EXT4 | SOU EXTENSION 4 FILED | — |
| Jun 21, 2024 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 22, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 20, 2023 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Dec 20, 2023 | EXT3 | SOU EXTENSION 3 FILED | — |
| Dec 20, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Nov 6, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 13, 2023 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Jun 12, 2023 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Jun 12, 2023 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Jun 2, 2023 | EXT2 | SOU EXTENSION 2 FILED | — |
| Jun 2, 2023 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Dec 14, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Dec 12, 2022 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Dec 12, 2022 | EXT1 | SOU EXTENSION 1 FILED | — |
| Dec 12, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jul 12, 2022 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 1, 2022 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Jun 1, 2022 | OP.T | OPPOSITION TERMINATED NO. 999999 | — |
| Jun 1, 2022 | OP.D | OPPOSITION DISMISSED NO. 999999 | — |
| Mar 3, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 3, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Mar 3, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 3, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 9, 2021 | OP.I | OPPOSITION INSTITUTED NO. 999999 | — |
| Feb 10, 2021 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Feb 9, 2021 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 9, 2021 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 20, 2021 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 1, 2021 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 10, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 9, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 9, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 17, 2020 | LOPR | LETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN | — |
| Aug 14, 2020 | LOPT | LETTER OF PROTEST EVIDENCE FORWARDED | — |
| Aug 7, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 7, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 7, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 30, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| May 16, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 8, 2020 | NWAP | NEW APPLICATION ENTERED | — |