Drawing for DIBBLE

USPTO serial 88925908

DIBBLE

Reviewed by CopyMark Law Group

Reg. 6472164Status 700Renewal
Filing date
Status date
Registration date
Aug 31, 2021
Examiner
NEPTUNE, EVONNE MARIE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with DIBBLE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $548*

Plus Government fees of $650

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jennifer A. Van Kirk

Jennifer A. Van Kirk LEWIS ROCA ROTHGERBER CHRISTIE LLP201 EAST WASHINGTON STREET, SUITE 1200PHOENIX, AZ 85004UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
042Civil engineering and infrastructure planning services; airport infrastructure services, namely, location studies, airport master planning, inspection, design and construction surveys and design of runways, taxiways, parking aprons, t-hangars, grading, pavement rehabilitation, drainage, detention basins, street systems, parking facilities, utilities, fencing and security/access control systems, fuel storage, site infrastructure for airport terminals and building facilities; drainage and flood control engineering services, namely, design of detention/retention basins, open channels, river works, storm drains, drop structures, energy dissipators, spillways, culverts, scour and bank protection, dams; drainage and flood control engineering services, namely, area drainage master studies and plans, preliminary and final design, construction administration services, flood insurance studies, drainage manuals, 404 permits/401 certification, floodplain delineations, FEMA CLOMR/LOMR, bridge scour analysis, hydrologic and hydraulic modeling and analysis, sediment transport, erosion and degradation studies, one and two dimensional modeling, benefit-cost analysis, inundation studies, emergency action plans (EAP), flood damage and risk assessment, dam and levee break modeling and flood hazard mapping, floodplain delineation and mapping, erosion setback evaluation and mapping, irrigation supply and distribution systems analysis, low impact development (LID) services, public funding assistance services, and utility coordination; land development engineering services in the nature of civil engineering services related to the development of publicly and privately owned facilities in partnership with design professionals, contractors and developers, namely, select entitlement services, site due diligence, site, grading and utility master planning, site layout, vehicle turning movement analysis, water/sewer system modeling, utility coordination, site/parking design, grading and drainage design/earthwork modeling, storm drain system design, stormwater detention/retention design, utility service design of water, fire and sewer systems, offsite roadway, drainage and utility design, municipal coordination, bidding phase support, and recording engineering drawings for others; engineering survey services, namely, control surveys, three dimensional imaging, topographic surveys, boundary surveys, right-of-way/easement surveys, global positioning surveys, photogrammetry control surveys, ALTA/ACSM surveys, construction staking, as-built surveys; geographic information system services, namely, asset inventory and management involving water and wastewater, storm drainage, water distribution, and gas pipeline systems, data collection and conversion, street centerlines, database design, development, and management, VB/VBA programming and avenue scripting, web development, data deployment, maintenance, and management, integration of water distribution systems into GIS, integration of sanitary sewer systems into GIS, integration of storm drainage systems into GIS, fire hazard evaluation and mapping; transportation engineering services, namely, major street design, highway location studies, highway design concept reports, highway/freeway design, street systems, sidewalk improvements, roadway signing/striping design, traffic impact analysis, traffic interchange design, traffic control plans, drainage analysis and design, right-of-way analysis and plans, legal descriptions and exhibits, utility design and relocations, construction administration/inspection, quality assurance/quality control, constructability reviews, comprehensive project management, partnering/teamwork leadership, public involvement, agency coordination, program management, English and metric capabilities, parks and trails, utility and agency coordination; water resource engineering services, namely, transmission/distribution main design, booster pump station design, reservoir design, well design, pipeline rehabilitation, water system appraisals, water and sewer master planning, sanitary sewer main design, lift station design, effluent reuse/reclaimed pipelines, water/waste water treatment, irrigation delivery systems, gas pipeline design, infrastructure rehabilitation, agency coordination, phased implementation planning and public involvement programs, steel reservoir rehabilitation, pipeline alignment studies, design reports, hydraulic analysis, fluid mechanics, hydrogeology, corrosion protection design, opinion of probable construction costs, construction management, requests for information, material submittals, remote facility commissioning; structural engineering services relating to buildings and ancillary structures, site and retaining walls, slab-on-grade, structural assessment reports, structural design and analysis, structural drawings from conceptual through final, construction administration, special structural inspections, general structural observations, safety inspections, specialized fiber reinforced polymer materials for strengthening or repair of existing pipelines, junction boxes, drainage facilities, canals, buildings and ancillary structures, bridges, culverts, slab-on-grade, and site and retaining wallsACTIVEOct 7, 2020
045Permitting, namely, obtaining municipal permitting and NPDES/stormwater permitsACTIVEOct 7, 2020

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 31, 2026REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 31, 2026REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 31, 2026REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 31, 2021R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 27, 2021SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Jul 26, 2021CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jun 25, 2021SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jun 22, 2021AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Jun 11, 2021IUAFUSE AMENDMENT FILED—
Jun 11, 2021EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Mar 23, 2021NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jan 26, 2021NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 26, 2021PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 6, 2021NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 22, 2020CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 7, 2020TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 6, 2020CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 6, 2020TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 13, 2020GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2020GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2020CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 23, 2020DOCKASSIGNED TO EXAMINER—
Jun 5, 2020NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 23, 2020NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance