USPTO serial 88937485
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $325
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jonathan Pierce
Jonathan Pierce PORTER HEDGES LLPP.O. BOX 4744HOUSTON, TX 77210-4744UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction services rendered to others, namely, paving wastewater treatment plants and lift stations; Paving contractor services; Concrete paving, maintenance, application of seal coating, and crack repair services; Asphalt paving, sealing and repair services; Construction project management services in the field of energy and energy generation equipment support structures and ancillary structures; Electrical contractor services; Contractor services, namely, review of and remedial recommendations for electrical systems for others; Comprehensive preventative maintenance service for electrical systems; Consulting services for the construction of water treatment and purification plants, wastewater lift stations, sound walls in the nature of noise barriers, municipal solid waste treatment plants, and other municipal infrastructure facilities; Construction services, namely, planning, laying out and construction of waste water treatment plants, lift stations, and sound walls in the nature of noise barriers; Construction project management services in the heavy civil construction field, and in the fields of oil and gas exploration and production; Pipeline construction and maintenance; Construction and maintenance of midstream and downstream oil and gas compressors and compressor stations; Utility equipment and transmission right-of-way construction site clearing, site cleaning, construction, maintenance, and repair services for utility equipment; Oil field construction services in the nature of roustabout services, namely, installation of and repairing of oil field machinery and equipment, and well site preparation and maintenance; Installation, repair, and maintenance, and field servicing of artificial lift systems and components, namely, wellhead drives, power units, and hydraulic and electric systems for use in the oil and gas industry and in the waste management industry; Construction services, namely, pad preparation, grading, concrete and asphalt paving services; Construction consultation and project management services in the commercial, industrial, municipal, residential, and oil and gas fields; Construction services in the nature of construction of underground utilities, namely, pipelines, water and wastewater systems, and sanitary and storm sewer conveyance systems; Land development and construction services in the nature of site work, namely, grading, clearing, placement and compaction of rock, sand, dirt, trees, asphalt, concrete, and trash from building sites, preparing building pads | ACTIVE | May 4, 2020 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 18, 2026 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| May 18, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 16, 2021 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Apr 15, 2021 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Apr 14, 2021 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Apr 14, 2021 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Mar 29, 2021 | IUAF | USE AMENDMENT FILED | — |
| Mar 29, 2021 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Dec 1, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Oct 6, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 6, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 16, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 31, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 31, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 31, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 31, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 31, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 29, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 17, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 1, 2020 | NWAP | NEW APPLICATION ENTERED | — |