USPTO serial 88942366
FERROVIAL CONSTRUCTION
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 13, 2022
- Examiner
- WOLD, BARBARA NIELSEN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with FERROVIAL CONSTRUCTION?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Tamar Niv Bessinger
Tamar Niv Bessinger Fross Zelnick Lehrman & Zissu, P.C.151 West 42nd Street, 17th floorNew York, NY 10036United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction Planning; Construction consultation; street construction; road construction; construction of underground utilities, construction supervision; sign construction, namely, installation of traffic and road signs; pipeline construction; building construction; infrastructure construction, namely, road construction, pipeline construction, construction of tunnels and underground structures, construction of viaducts, construction of shipping ports, construction of motorways, construction of highway toll collection structures; residential building construction; commercial building construction; industrial construction of buildings; building, bridge, airport, tunnel, pipeline, road construction services; construction consultancy; general construction contracting; building construction information; construction grading services; repairing construction works in the nature of building repair; construction of airports; providing information in the field of mobile hydraulic construction equipment in the nature of winches, gear boxes, and load systems; construction of bridges; construction of houses; construction of buildings; construction of roads; construction of paths; construction of tunnels; construction of civil engineering structures; construction of motorways; civil construction services, namely, construction of civil engineering structures; construction equipment rental; construction project management services; heavy engineering construction of buildings, bridges, airports; construction services, namely, construction of water treatment and purification plants, solid waste treatment plants; construction services, namely, site preparation being concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving; aviation infrastructure construction, namely, construction of airports; power infrastructure construction, namely, construction of wind power plants; civil infrastructure construction, namely, construction of civil engineering structures; building construction supervision; onsite construction supervision; rental of construction machinery; rental of construction apparatus; rental of construction equipment; construction of curtain walls; custom construction of roads; construction of educational buildings; building construction and demolition; construction of foundations for roads; construction of foundations for bridges; construction supervision of civil engineering projects; Construction services, namely, planning, laying out and construction of residential and commercial communities; Crane rental and leasing for construction purposes; Rental of construction and building machinery for use in construction; Construction of civil engineering structures by pouring concrete; Construction of roads, underground utilities, and housing pads; Building construction supervision services for building projects; Construction dewatering, namely, the removal of surface waters and groundwater to facilitate the construction of structures and pipelines; construction project management services, namely, on site project management relating to the construction of airport facilities; Rental of tools, plant and equipment for construction, demolition, cleaning and maintenance, namely, rental of construction machines and apparatus, rental of construction and building equipment, rental of hand and power tools; Self-perform construction skilled trades, namely, concrete work, carpentry and selective demolition services; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services | ACTIVE | — |
| 042 | Construction drafting, Construction design, namely, residential building design, industrial design, design of tunnels and underground structures, design of airports, design of highways, design of bridges; Design services for the construction industry, namely, design of factory buildings, design of production facilities; engineering services, namely, preparation of reports relating to technical project studies for construction projects; engineering; engineering work; engineering services; civil engineering; surveying and engineering; Civil engineering consultancy; Engineering design services; Structural engineering services; engineering project studies, namely, engineering services; civil engineering drawing services; traffic and transportation engineering; preparation of engineering reports, namely, engineering services; Civil engineering design services being civil engineering for the design of tunnels, underground structures, airports, highways, bridges, and buildings; provision of engineering reports, namely, engineering services; Consulting in the field of civil engineering; Engineering services for the design of structures; Engineering services in the fields of traffic and transportation; Monitoring of events which influence the environment within civil engineering structures, namely, monitoring inspections of manufactured goods, manufacturing machinery for quality control purposes; Monitoring of activities which influence the environment within civil engineering structures, namely, monitoring inspections of manufactured goods, manufacturing machinery for quality control purposes; Engineering services in the field of reduction of operating costs, fuel blending, waste handling, quality performance of co-products and by-products, and chemical distribution | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Ferrovial, S.A.
- Other trademarks owned by Ferrovial, S.A.
- Other trademarks owned by Ferrovial, S.A.
- Other trademarks owned by FERROVIAL SE
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named FERROVIAL CONSTRUCTION
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 24, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 24, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 24, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 24, 2024 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Sep 24, 2024 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jul 19, 2023 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Sep 13, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 13, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 28, 2022 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 28, 2022 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 8, 2022 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 17, 2022 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 6, 2022 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 6, 2022 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 6, 2022 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 6, 2022 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 23, 2022 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 23, 2022 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 23, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 22, 2022 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 25, 2022 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 5, 2021 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 5, 2021 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 5, 2021 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 1, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 1, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 1, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 31, 2021 | ALIE | ASSIGNED TO LIE | — |
| Aug 26, 2021 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Mar 31, 2021 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Mar 31, 2021 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Mar 31, 2021 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Mar 12, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 12, 2021 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Mar 12, 2021 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Mar 12, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 12, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 9, 2021 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 8, 2021 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 8, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 9, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 9, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 9, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 2, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 22, 2020 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 4, 2020 | NWAP | NEW APPLICATION ENTERED | — |