USPTO serial 88981514
IBI
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jun 15, 2021
- Examiner
- HOPKINS, SARAH COLLEEN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with IBI?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $2,275
Owner
IBI Group Professional Services (Canada)Inc.
Toronto, Ontario, CA
Other trademarks owned by IBI Group Professional Services (Canada)Inc.
ARCADIS PROFESSIONAL SERVICES (CANADA) INC.
TORONTO, CA
Other trademarks owned by ARCADIS PROFESSIONAL SERVICES (CANADA) INC.
IBI Group Professional Services (Canada)Inc.
Toronto, Ontario, CA
Other trademarks owned by IBI Group Professional Services (Canada)Inc.
IBI Group Professional Services (Canada)Inc.
Toronto, Ontario, CA
Other trademarks owned by IBI Group Professional Services (Canada)Inc.
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Patricia L. Werner
Patricia L. Werner Kelley Drye & Warren LLP3 World Trade Center175 Greenwich StreetNew York, NY 10007Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Strategic planning, namely, business strategic planning | ACTIVE | Jul 1, 2014 |
| 036 | Toll services, namely, electronic and manual highway toll collection | ACTIVE | Jul 1, 2014 |
| 037 | Construction administration, namely, construction project management; program management in the nature of construction project management, namely, managing of related projects for land and building development; construction planning; refurbishing existing buildings; construction of highways and freeways; physical maintenance consultation and advisory services, namely, providing advice relating to construction of new and existing building maintenance and mechanical operation facilities | ACTIVE | Jul 1, 2014 |
| 038 | Toll services and systems, namely, providing computer network and wireless network access by means of the Internet for information in the field of highway travel, including weather, directions and road conditions | ACTIVE | Jul 1, 2014 |
| 039 | Toll services, namely, traffic management in the nature of management of vehicular traffic flow near tolls through advance communications network and technology at and near manual toll collection sites for the benefit of toll collection flow | ACTIVE | Jul 1, 2014 |
| 040 | Computerized 3D visualization services, namely, 3D printing for others | ACTIVE | Jul 1, 2014 |
| 042 | Strategic planning in the nature of planning design services for urban communities, namely, environmental impact strategic planning; construction administration, namely, drafting of construction plans for urban communities; engineering consulting services in the nature of systems operations and maintenance consultation and advisory services, namely, planning, programming, design, and administration of new and existing software for building maintenance and mechanical operations facilities; environmental assessment, namely, assessment of the impact of land, building, and structures development on the environment; brownfield engineering, namely, redesigning and providing construction engineering solutions to accommodate new buildings on environmentally contaminated land; bridge engineering, namely, bridge construction administration in the nature of drafting construction plans for bridges; bridge engineering in the nature of bridge construction staging and traffic management, namely, designing and drafting construction plans for bridges; highway design, namely, civil engineering of highways and freeways; computer systems integration, namely, implementing advance warning systems regarding weather conditions and toll highway conditions; bridge engineering, namely, planning, and design for new and rehabilitated bridge structures; highway design, namely, planning and design of highways and freeways; architecture; global positioning system (GPS) surveying and mapping, namely, gathering of precise measurements for land development through satellite imaging; municipal planning, namely, urban planning; structural engineering; transportation engineering; landscape architecture; civil engineering; geomatics and land surveying; airport engineering services, namely, airside aviation systems engineering services, namely, development of airfield ground lighting control systems, aircraft de-icing facilities; airport terminal design services, namely, airport planning and design; airport terminal design services in the nature of engineering of baggage handling control systems and landside transportation management system, namely, automatic vehicle identification (avi) and telematic in-vehicle communication systems providing wireless vehicle navigation and tracking and electronic tolling systems; airport terminal design services in the nature of freight and passenger ground transportation planning, namely, wireless computer and cellular networks for automated freight and passenger ground transportation monitoring and traffic control; runway incursion detection, namely, radar detection of airport runway services; computer software development in the field of traffic management, revenue collection, and traveler information systems for toll highways; computerized 3D visualization services, namely, virtual reality computer modelling and design of architectural planning models; design and development of computer software; intelligent systems engineering, namely, designing computer hardware and software systems to improve, automate, and optimize the physical and social infrastructure of cities; communications systems engineering, namely, design and development of wired and wireless computer and cellular networks, including computer and networking software and hardware systems integration and updating; design and development of computer hardware and software for facilities management and space planning; design and development of computer hardware and software for transportation and infrastructure; water resources management engineering, namely, engineering services in the field of water and wastewater treatment, water management in the nature of managing the construction of hydraulic structures; municipal engineering, namely, researching, analyzing, planning, and designing roads, pathways, bridges, water and sewer mains; computerized 3D visualization services, namely, design of information graphics and data visualization materials of 3D architectural planning models | ACTIVE | Jul 1, 2014 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by IBI Group Professional Services (Canada)Inc.
- Other trademarks owned by ARCADIS PROFESSIONAL SERVICES (CANADA) INC.
- Other trademarks owned by IBI Group Professional Services (Canada)Inc.
- Other trademarks owned by IBI Group Professional Services (Canada)Inc.
- Other trademarks in Class 035
- Other trademarks in Class 036
- Other trademarks in Class 037
- Other trademarks in Class 038
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named IBI
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 15, 2026 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| May 31, 2023 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jun 15, 2021 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 10, 2021 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| May 10, 2021 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| May 10, 2021 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Apr 30, 2021 | IROA | RESPONSE TO ITU OFFICE ACTION ENTERED | — |
| Apr 30, 2021 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 29, 2021 | INCD | ITU OFFICE ACTION ISSUED FOR DIVISIONAL REQUEST | — |
| Apr 9, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 9, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 9, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 29, 2021 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Mar 16, 2021 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Mar 16, 2021 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Mar 16, 2021 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Nov 3, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 8, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 8, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 19, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 4, 2020 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 28, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 28, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 28, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 28, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 28, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 27, 2020 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 21, 2020 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 7, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 7, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 7, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 7, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 7, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 7, 2020 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 7, 2020 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 7, 2020 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 7, 2020 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 25, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 24, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 24, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 6, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 7, 2020 | ATRV | ATTORNEY REVIEW COMPLETED | — |
| Apr 7, 2020 | ATRV | ATTORNEY REVIEW COMPLETED | — |
| Mar 11, 2020 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 11, 2020 | ALIE | ASSIGNED TO LIE | — |
| Mar 4, 2020 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Feb 28, 2020 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 28, 2020 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 28, 2020 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 26, 2020 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 2, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 26, 2019 | NWAP | NEW APPLICATION ENTERED | — |