USPTO serial 88984002
IPRODUCTION
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 24, 2022
- Examiner
- NOVAKOVIC, MIROSLAV
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with IPRODUCTION?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
London, GB
Newcastle Upon Tyne, GB
Newcastle Upon Tyne, GB
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Henry Query
Henry Query HENRY QUERY, P.C.2100 MANCHESTER ROADSUITE 506WHEATON, IL 60187Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Installation, maintenance, repair and remanufacture of equipment and systems for oil and gas drilling, production, processing and transportation; consulting services, namely, technical consulting services concerning the installation, maintenance, repair and remanufacture of equipment and systems for oil and gas drilling, production, processing and transportation | ACTIVE | Jun 1, 2020 |
| 040 | Manufacturing to the order and specification of others of equipment and systems for oil and gas drilling, production, processing and transportation | ACTIVE | Jun 1, 2020 |
| 042 | Engineering of integrated production systems for oil and gas wells; engineering of equipment and systems for oil and gas drilling, production, processing and transportation; design, inspection and testing of equipment and systems for oil and gas drilling, production, processing and transportation; services of engineers, namely, mechanical, civil, electrical, chemical and petroleum engineering services; research and development of equipment and systems for oil and gas drilling, production, processing and transportation; technical research in the fields of engineering, design, construction, project management and process technologies; technical consulting services in relation to testing, calibration, reading and data analysis of petroleum metering systems; engineering services in relation to petroleum metering systems; subsea civil engineering; consulting services, namely, technical consulting services in the field of subsea engineering | ACTIVE | Jun 1, 2020 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by TechnipFMC PLC
- Other trademarks owned by TechnipFMC PLC
- Other trademarks owned by TechnipFMC PLC
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named IPRODUCTION
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 22, 2024 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| May 24, 2022 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 24, 2022 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 7, 2022 | SUNA | NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED | — |
| Apr 6, 2022 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Mar 23, 2022 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Mar 22, 2022 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Mar 22, 2022 | DPCC | DIVISIONAL PROCESSING COMPLETE | — |
| Mar 22, 2022 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Mar 21, 2022 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Mar 8, 2022 | IUAF | USE AMENDMENT FILED | — |
| Mar 8, 2022 | DRRR | DIVISIONAL REQUEST RECEIVED | — |
| Mar 8, 2022 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Mar 8, 2022 | EISU | TEAS STATEMENT OF USE RECEIVED | The applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action. |
| Mar 7, 2022 | EXT3 | SOU EXTENSION 3 FILED | — |
| Mar 7, 2022 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 7, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Sep 3, 2021 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Sep 3, 2021 | EXT2 | SOU EXTENSION 2 FILED | — |
| Sep 3, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 23, 2021 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Feb 20, 2021 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 20, 2021 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 20, 2021 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Sep 8, 2020 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jul 14, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 14, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 24, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 6, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 30, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 29, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 29, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 3, 2019 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Dec 3, 2019 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Dec 3, 2019 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Nov 20, 2019 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 6, 2019 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 26, 2019 | NWAP | NEW APPLICATION ENTERED | — |